🤖 AI Agent Friendly: This page is available in clean token-optimized Markdown.
View as .md

$BNB Catalyst Posts

July 25, 2026

Single-day social intelligence recap and verified catalyst posts · ← Back to $BNB Profile · Market Rankings

💬 Curated Viral Posts & Community Evidence

377 source posts analyzed
Binance @binance · 2026-07-25T14:44:11+00:00

One Vietnam trip. Plenty of stops. One easy way to pay Scan local QR codes with Binance Pay and keep it moving. Know more → binance.com/events/scan-an …

Watcher.Guru @WatcherGuru · 2026-07-25T20:46:37+00:00

Cryptocurrency Performance Year to Date $BTC : -29.72% $ETH : -40.48% $BNB : -36.52% $XRP : -47.43% $SOL : -44.49%

A glowing red downward-trending line graph on a dark background illustrates significant cryptocurrency market declines, visually reinforcing the post's data showing year-to-date losses for major digital assets including BTC (-29.72%), ETH (-40.48%), BNB (-36.52%), XRP (-47.43%), and SOL (-44.49%).

AI visual analysis: A glowing red downward-trending line graph on a dark background illustrates significant cryptocurrency market declines, visually reinforcing the post's data showing year-to-date losses for major digital assets including BTC (-29.72%), ETH (-40.48%), BNB (-36.52%), XRP (-47.43%), and SOL (-44.49%).

Binance @binance · 2026-07-25T06:00:00+00:00

can’t believe it’s the w̵̨̛̥̪̫̼̯̜̦͕̯̥̦̝̤̠̯͎̜̟͍̜̭̱̅́̄̐̾͆̎͊̑̓̃͂͆̚͘͜͜͜͜ͅe̵̛̪͆͗̅̿͂̓̍̇̈̿̎͒̎̂͑̔̋̽͛͘̕͠͝e̷̢̘̠̔̽̋̒̄̈͐͐͆̎́͛̊̂͂̃͊͑͗̊͋̈̆̊͊͝k̴̨̡̨͙̫͚̤̹̪̭̲̣͈̫̮͇͙̙͚̩̥̪̅̋̌͑̈́́͠ͅé̵͖̼̻̹̇̍̋̽̑ͅn̶̛̹̣͎̫̝̱̪̭͇̲̔̂̅̄̃͆̅̐͐̇͗͗̈́̏̀̉̆̀͐́̀̎͒̈́͜͠͝ḑ̸̛̩̻̮͍̦̣̝̈̓̈́̏͒̀̀

Binance @binance · 2026-07-25T18:01:01+00:00

Every mood under the sun.

Shadows of five different faces—expressing surprise, sadness, calm, happiness, and a smirk—fall across the sand alongside scattered seashells, sea glass, a compass, and a small wooden Binance logo, visually capturing the diverse range of human emotions referenced in the caption "Every mood under the sun."

AI visual analysis: Shadows of five different faces—expressing surprise, sadness, calm, happiness, and a smirk—fall across the sand alongside scattered seashells, sea glass, a compass, and a small wooden Binance logo, visually capturing the diverse range of human emotions referenced in the caption "Every mood under the sun."

MAME @mamebnb · 2026-07-25T12:24:27+00:00

MAME Creative Challenge. MAME was born on BNB Chain. This challenge is our way of celebrating the ecosystem where MAME began and the community that continues to build it. Theme: MAME on BNB Chain Show us your vision of MAME on BNB Chain. There are no limits to

Promotional banner for the "MAME Creative Challenge" featuring a cartoon husky mascot bursting out of a colorful box of creative supplies, announcing 50 winners who will each receive $200, with a $10,000 total prize pool, themed around "MAME on BNB Chain" and ending August 3rd at 14:00 UTC.

AI visual analysis: Promotional banner for the "MAME Creative Challenge" featuring a cartoon husky mascot bursting out of a colorful box of creative supplies, announcing 50 winners who will each receive $200, with a $10,000 total prize pool, themed around "MAME on BNB Chain" and ending August 3rd at 14:00 UTC.

Binance @binance · 2026-07-25T00:00:42+00:00

vibes are high but binance flex is higher

A happy golden retriever stands in a sunny European plaza beside a yellow suitcase emblazoned with "BINANCE" branding, perfectly capturing the post's playful nod to crypto culture flexing while exploring iconic destinations.

AI visual analysis: A happy golden retriever stands in a sunny European plaza beside a yellow suitcase emblazoned with "BINANCE" branding, perfectly capturing the post's playful nod to crypto culture flexing while exploring iconic destinations.

AlloX @alloxdotai · 2026-07-25T17:43:02+00:00

7 days left in the AlloX × @BinanceWallet Exclusive Campaign under the Booster format. 78,500 users have already joined. The clock is ticking. If you haven't completed all five tasks yet, this is your final opportunity. What's still available: • Connect Binance Wallet with

Promotional banner for AlloX in partnership with Binance Wallet featuring a '7 DAYS LEFT' countdown calendar and an exclusive crypto coin badge on a black and yellow background.

AI visual analysis: Promotional banner for AlloX in partnership with Binance Wallet featuring a '7 DAYS LEFT' countdown calendar and an exclusive crypto coin badge on a black and yellow background.

Sakura @Sakurakulu · 2026-07-25T04:51:12+00:00

$67 is now LIVE on BSC. New chain. More accessibility. Same vision. No arb opportunity. MC & FDV updates are coming soon. This is just the beginning. @sixsevenapp @BNBCHAIN

A smiling man wearing glasses and a black polo shirt with a yellow logo holds up both hands displaying all ten fingers, representing the number "67" from the $67 token announcement on BSC (BNB Chain). The image playfully visualizes the "six-seven" theme of the Six Seven App as it launches its new blockchain integration.

AI visual analysis: A smiling man wearing glasses and a black polo shirt with a yellow logo holds up both hands displaying all ten fingers, representing the number "67" from the $67 token announcement on BSC (BNB Chain). The image playfully visualizes the "six-seven" theme of the Six Seven App as it launches its new blockchain integration.

Binance @binance · 2026-07-25T21:00:17+00:00

Gen Z is entering markets with a stronger financial foundation. 77% report receiving formal financial education. Earlier participation and better preparation are increasingly going hand in hand.

A Binance infographic titled "Early and Educated Gen Z Leads in Formal Training" shows that 77% of Gen Z investors, 69% of Millennial investors, and 58% of Gen X investors received formal education about financial topics, supporting the post's claim that Gen Z is entering markets with stronger financial preparation than older generations.

AI visual analysis: A Binance infographic titled "Early and Educated Gen Z Leads in Formal Training" shows that 77% of Gen Z investors, 69% of Millennial investors, and 58% of Gen X investors received formal education about financial topics, supporting the post's claim that Gen Z is entering markets with stronger financial preparation than older generations.

Winchman@Renaiss @Plus_Ultra_715 · 2026-07-25T06:06:38+00:00

BNB is definitely the most Builder-supporting chain on the market, bar none. @renaissxyz Choosing to launch on @BNBCHAINZH back then was the most correct decision we ever made. Here, we don't ask about origins, only about construction. See you at the next BNB event!

World of Dypians @worldofdypians · 2026-07-25T11:50:06+00:00

Unlock the full World of Dypians experience. Prime Subscription gives you access to exclusive events, premium rewards, and everything the game has to offer at its best. One subscription. A completely different game. Pay with @Binance Pay or your favorite wallet.

A gold emblem featuring a crest with eagles, swords, and the text 'WORLD OF DYPIANS - UNITE FIGHT SURVIVE' against a dark blue background.

AI visual analysis: A gold emblem featuring a crest with eagles, swords, and the text 'WORLD OF DYPIANS - UNITE FIGHT SURVIVE' against a dark blue background.

花白 @BNBTC8 · 2026-07-25T07:42:16+00:00

After years in the crypto circle, the biggest fear isn't a market crash—it's the money you've earned getting stuck and unable to come out. Markets can swing 20% in a single day, but what truly breaks your mindset is when you're clearly in profit, yet get stuck at the withdrawal

An advertisement for BiyaPay, a cryptocurrency service, featuring Chinese text explaining the benefits of using the app for trading and investing, with a phone displaying the app interface.

AI visual analysis: An advertisement for BiyaPay, a cryptocurrency service, featuring Chinese text explaining the benefits of using the app for trading and investing, with a phone displaying the app interface.

Captain Capital @CapCapital68 · 2026-07-25T03:20:50+00:00

Nine years. One incredible journey. Happy #BinanceTurns9! A heartfelt thank you to @binance @cz_binance for the thoughtful anniversary gift celebrating Binance's 9th birthday. What makes this gift meaningful isn't just the item itself - It's the appreciation behind it. It's

A black and yellow Binance 9th anniversary gift set sits on a brown leather couch, featuring a box with the Binance logo, a small Bitcoin coin, and a card honoring "CZ" for his role in building Binance's culture, alongside a large decorative yellow display piece.

AI visual analysis: A black and yellow Binance 9th anniversary gift set sits on a brown leather couch, featuring a box with the Binance logo, a small Bitcoin coin, and a card honoring "CZ" for his role in building Binance's culture, alongside a large decorative yellow display piece.

BNB Chain @BNBCHAIN · 2026-07-25T12:00:18+00:00

What are you building tonight?

A screenshot of text messages showing the phrases "building tonite 👀," "building tonight queen??," and "building on BNB Chain tonite 👀," playfully responding to the post's question "What are you building tonight?" with creative and crypto-themed answers.

AI visual analysis: A screenshot of text messages showing the phrases "building tonite 👀," "building tonight queen??," and "building on BNB Chain tonite 👀," playfully responding to the post's question "What are you building tonight?" with creative and crypto-themed answers.

Cointelegraph @Cointelegraph · 2026-07-25T12:30:47+00:00

ADOPTION: Gen Z is driving $80B in trading volume across Binance's stock and TradFi products.

The image shows the Binance logo—a gold circular emblem with the platform's signature diamond-shaped cryptocurrency symbol in white. It relates to the post by visually representing Binance as the platform where Gen Z is generating $80B in trading volume across its stock and TradFi products.

AI visual analysis: The image shows the Binance logo—a gold circular emblem with the platform's signature diamond-shaped cryptocurrency symbol in white. It relates to the post by visually representing Binance as the platform where Gen Z is generating $80B in trading volume across its stock and TradFi products.

BNB Chain @BNBCHAIN · 2026-07-25T16:08:35+00:00

We’re excited to be heading to Stanford with @yzilabs for the Science of Blockchain Conference! Join us for a deep dive into the engineering behind BSC, then connect with researchers and builders at our evening reception. Register now sbc-conference.com/2026/

A promotional banner for "The Science of Blockchain Conference 2026 (SBC'26)" displayed on a purple background, indicating it will be held at the Arrillaga Alumni Center, Stanford University from July 27-29, 2026. The image directly supports the post announcing attendance at the Stanford conference hosted with YZI Labs, highlighting the event's details and dates.

AI visual analysis: A promotional banner for "The Science of Blockchain Conference 2026 (SBC'26)" displayed on a purple background, indicating it will be held at the Arrillaga Alumni Center, Stanford University from July 27-29, 2026. The image directly supports the post announcing attendance at the Stanford conference hosted with YZI Labs, highlighting the event's details and dates.

aRe00t @aRe00t · 2026-07-25T18:27:35+00:00

I'm so silly, really... The Binance docs used to mention support for 0ms, but when I checked again later, it was gone. I even thought retail traders weren't worthy of using it, so I never thought to just give it a shot. Thank you so, so, SO much!!!

[caption-failed: image unfetchable or no caption]

AI visual analysis: [caption-failed: image unfetchable or no caption]

Ashleyez @ashleyez1010 · 2026-07-25T11:47:57+00:00

Starting on Binance can feel overwhelming because there are so many features, but you don’t need to understand everything at once. Start with the basics: complete identity verification, secure your account with strong protection, and deposit only an amount you’re comfortable

The image is a Binance onboarding infographic titled "Getting Started on Binance," outlining a five-step beginner's guide: (1) Verify Your Account, (2) Make a Small Deposit, (3) Use Binance Convert, (4) Explore Features, and (5) Keep Learning & Growing. It reinforces the post's advice to start with the basics like identity verification and small deposits, emphasizing at the bottom: "Start small. Take your time. Make informed decisions."

AI visual analysis: The image is a Binance onboarding infographic titled "Getting Started on Binance," outlining a five-step beginner's guide: (1) Verify Your Account, (2) Make a Small Deposit, (3) Use Binance Convert, (4) Explore Features, and (5) Keep Learning & Growing. It reinforces the post's advice to start with the basics like identity verification and small deposits, emphasizing at the bottom: "Start small. Take your time. Make informed decisions."

Base App @baseapp · 2026-07-25T06:02:00+00:00

You can use Base App on: Mobile Desktop Base App now supports: BNB Solana Bitcoin Robinhood Chain And there's more coming. Trade anything, anywhere with Base App.

Solana Hub @SolanaHub_ · 2026-07-25T08:00:01+00:00

10K in $SOL or 10K in $BNB Pick one.

A comparison graphic showing two hands holding cryptocurrency tokens: '$10,000 IN SOLANA' on the left and '$10,000 IN BNB' on the right.

AI visual analysis: A comparison graphic showing two hands holding cryptocurrency tokens: '$10,000 IN SOLANA' on the left and '$10,000 IN BNB' on the right.

Layah Heilpern @LayahHeilpern · 2026-07-25T20:53:00+00:00

Cryptocurrency Performance Year to Date. BTC: -29.72% ETH: -40.48% BNB: -36.52% XRP: -47.43% SOL: -44.49% There was never a 2026 super cycle, well done to those who listened!

Cowboy @feibo03 · 2026-07-25T02:26:54+00:00

今天真的太难熬了……居然在BSC一天亏掉了整整23WU。看着账户里的数字瞬间缩水那么多,心里像被狠狠揪了一下,甚至有种喘不过气的感觉。 不过我还是相信BSC能让我赚回来的,BSC永远牛市

The image shows a GMGN trading dashboard dated July 25, 2026, displaying a devastating loss of -$231.5K with a profitable trade of +$2,044.89 and a loss of -$233.6K across 10 out of 1,182 transactions on the "Cowboy BNB" token, all set against an anime character with green hair—visually amplifying the post's emotional distress over losing 23万 on BSC in a single day.

AI visual analysis: The image shows a GMGN trading dashboard dated July 25, 2026, displaying a devastating loss of -$231.5K with a profitable trade of +$2,044.89 and a loss of -$233.6K across 10 out of 1,182 transactions on the "Cowboy BNB" token, all set against an anime character with green hair—visually amplifying the post's emotional distress over losing 23万 on BSC in a single day.

神币 @surpr164 · 2026-07-25T12:29:07+00:00

Bear market time to give the bros some perks—drawing for a set of Binance peripherals that only VIP3+ folks get. Same as last time, follow us three peeps: @moonkimbinance @pearbinance @surpr164 One day later, Grok draws the winner—100% fair and square.

A premium Binance cocktail shaker set is pictured, including various bar tools and accessories. This giveaway is for VIP3+ followers of @moonkimbinance, @pearbinance, and @surpr164.

AI visual analysis: A premium Binance cocktail shaker set is pictured, including various bar tools and accessories. This giveaway is for VIP3+ followers of @moonkimbinance, @pearbinance, and @surpr164.

BSCN @BSCNews · 2026-07-25T14:27:00+00:00

The judge that sentenced CZ actually praised the Binance founder! According to Economic Daily, @Binance founder @cz_binance received very kind words from the US judge before he was sentenced to a spell in US prison. "I read every one of your letters of support, because I wanted

BNB Chain @BNBCHAIN · 2026-07-25T20:00:11+00:00

Fill up all you want, the meter stays at zero until July 31. Zero fees when using USDC, USD1 and U on BNB Chain until July 31. Learn more below bnbchain.org/en/blog/0-fee- …

An electric vehicle charges at a station with a digital display reading "USDC" and "TOTAL: $0.00," visually reinforcing the promotion of zero-fee transactions using USDC, USD1, and U on BNB Chain until July 31.

AI visual analysis: An electric vehicle charges at a station with a digital display reading "USDC" and "TOTAL: $0.00," visually reinforcing the promotion of zero-fee transactions using USDC, USD1, and U on BNB Chain until July 31.

HexVanilla @hex_vanilla · 2026-07-25T02:52:17+00:00

As the creator of CZ Bull meme, I am very grateful that people appreciate my artwork. Now after 5 years, I just made a new meme for Heyi - "Meme Queen". @heyibinance I hope you like it as CZ liked my previous artwork for him

A 3D-rendered anthropomorphic bull character wearing an ornate golden crown with red jewels and a red teardrop necklace is shown against a yellow background, created as a tribute titled "Meme Queen" for Heyi, the mother of CZ, the creator of Binance.

AI visual analysis: A 3D-rendered anthropomorphic bull character wearing an ornate golden crown with red jewels and a red teardrop necklace is shown against a yellow background, created as a tribute titled "Meme Queen" for Heyi, the mother of CZ, the creator of Binance.

𝗕𝗮𝗻𝗸XRP @BankXRP · 2026-07-25T12:22:37+00:00

XRP exchange activity is COOLING OFF fast Binance deposits + withdrawals just fell off a cliff from 650K in June to 350K now Same setup we saw before the Oct 2025 run... history rhyming? Chart via CryptoQuant

The image is a CryptoQuant chart titled "Binance: XRP Deposit vs Withdrawal Transactions (SUM 30D)" tracking 30-day rolling sums of XRP deposits, withdrawals, and net transactions on Binance from October 2025 through July 2026. The chart illustrates a sharp decline in exchange activity, with combined deposits and withdrawals plunging from approximately 650K in June 2026 to around 350K by July 2026, visually supporting the post's claim that XRP exchange activity is cooling off rapidly and rhyming with the pre-rally setup seen in late 2025.

AI visual analysis: The image is a CryptoQuant chart titled "Binance: XRP Deposit vs Withdrawal Transactions (SUM 30D)" tracking 30-day rolling sums of XRP deposits, withdrawals, and net transactions on Binance from October 2025 through July 2026. The chart illustrates a sharp decline in exchange activity, with combined deposits and withdrawals plunging from approximately 650K in June 2026 to around 350K by July 2026, visually supporting the post's claim that XRP exchange activity is cooling off rapidly and rhyming with the pre-rally setup seen in late 2025.

CZ @czbinanceprd · 2026-07-25T07:37:20+00:00

opportunity never gets louder. it just gets more expensive.

CZ @czbinanceprd · 2026-07-25T17:39:33+00:00

every breakout starts unnoticed. recognition always arrives late.

I0 @irene_cc06 · 2026-07-25T14:26:20+00:00

Reading this passage stirred up a lot of emotions in me. Flap has actually been building on the BNB chain for over two years now—from three people to seven, then down to four, and up to today, with countless stories along the way. It was only in these recent months that it seems

Altcoin Daily @AltcoinDaily · 2026-07-25T19:02:50+00:00

BULLISH: S&P Dow Jones is launching new crypto index: Top digital assets include: Ethereum $ETH BNB $BNB Solana $SOL TRON $TRX Hyperliquid $HYPE S&P Dow Jones Indices CEO Catherine Clay explains why the company is expanding deeper into crypto:

CZ @czbinanceprd · 2026-07-25T12:50:23+00:00

big moves reward preparation. small moves reward luck.

CryptoJack @cryptojack · 2026-07-25T00:00:28+00:00

Crypto ETF fund flows yesterday: • BTC: -$225.18M • ETH: +$26.32M • HYPE: -$1.02M • LINK: +$153.91K • XRP, SOL, HBAR, DOGE, LTC, AVAX, DOT, BNB: $0

The image displays a US Crypto Spot ETF Overview table from SoSoValue, ranking 12 digital assets by ETF count, 1-day net inflows, 30-day net inflows, cumulative net inflows, and net assets as of 07/23. It visually confirms the accompanying post's figures, showing BTC leading with the largest 1-day outflow (-$225.18M) and net assets ($78.82B), ETH with a +$26.32M daily inflow, HYPE with -$1.02M, and LINK with +$153.91K, while XRP, SOL, HBAR, DOGE, LTC, AVAX, DOT, and BNB all register $0 in daily net inflows.

AI visual analysis: The image displays a US Crypto Spot ETF Overview table from SoSoValue, ranking 12 digital assets by ETF count, 1-day net inflows, 30-day net inflows, cumulative net inflows, and net assets as of 07/23. It visually confirms the accompanying post's figures, showing BTC leading with the largest 1-day outflow (-$225.18M) and net assets ($78.82B), ETH with a +$26.32M daily inflow, HYPE with -$1.02M, and LINK with +$153.91K, while XRP, SOL, HBAR, DOGE, LTC, AVAX, DOT, and BNB all register $0 in daily net inflows.

AhMeD @AhMeDI1001 · 2026-07-25T11:48:19+00:00

TRON DeFi Summer Is Still Going Strong and There's Still Time to Join As S1 enters its final participation window, TRON DeFi Summer is still offering some attractive opportunities through Binance Wallet. One thing worth keeping an eye on is the live APR, which changes

A Binance Wallet promotional graphic dated 23 Jul 2026 highlights "HOT TRON DEFI CAMPAIGN POOLS," listing real-time APRs of 61.6% for JST, 40.9% for SUN, 31.3% for TRX, and 7.9% for USDD, all via the JustLend DAO protocol. The image reinforces the post's message about ongoing TRON DeFi Summer opportunities by showcasing the live, attractive yields available through Binance Wallet.

AI visual analysis: A Binance Wallet promotional graphic dated 23 Jul 2026 highlights "HOT TRON DEFI CAMPAIGN POOLS," listing real-time APRs of 61.6% for JST, 40.9% for SUN, 31.3% for TRX, and 7.9% for USDD, all via the JustLend DAO protocol. The image reinforces the post's message about ongoing TRON DeFi Summer opportunities by showcasing the live, attractive yields available through Binance Wallet.

BULLRUN @D_BULLRUN · 2026-07-25T10:59:33+00:00

Trade what happens next with @Wager_Predict just incase you don’t know it’s the non-custodial prediction market protocol on BNB Chain. Spin up or trade binary markets across crypto, sports, politics, AI, culture and more. Take YES or NO positions with up to 10x leverage,

Autumn Riley @Autumn_Rileyy · 2026-07-25T08:39:14+00:00

One thing I've noticed about crypto is that the biggest barrier isn't technology. It's information overload. Open Binance for the first time and you'll see dozens of products, charts, and features. For someone new, it's easy to think you need to understand everything before

The image is an educational infographic titled "Getting Started on Binance" from Binance Academy, showing a 5-step beginner's guide (Complete Identity Verification, Make a Small Deposit, Try Binance Convert, Explore & Learn Gradually, Keep Learning & Growing) alongside a phone displaying a Binance app wallet balance of $1,234.56 with 0.008 BTC. It directly addresses the post's concern about information overload by emphasizing a simple, step-by-step approach with the reassuring message that "You don't need to be an expert to start."

AI visual analysis: The image is an educational infographic titled "Getting Started on Binance" from Binance Academy, showing a 5-step beginner's guide (Complete Identity Verification, Make a Small Deposit, Try Binance Convert, Explore & Learn Gradually, Keep Learning & Growing) alongside a phone displaying a Binance app wallet balance of $1,234.56 with 0.008 BTC. It directly addresses the post's concern about information overload by emphasizing a simple, step-by-step approach with the reassuring message that "You don't need to be an expert to start."

牛魔王 @Btcniumowang · 2026-07-25T23:16:15+00:00

I scrolled through dozens of posts about bStocks liquidity and found that everyone missed a key point @heyibinance @cz_binance @yingbinance @sisibinance @binance @binancezh

Satoshinin Kuzeni @kuzisatoshinin · 2026-07-25T11:20:20+00:00

My friends, the big summer campaign has started on Binance TR Everyone who is a new member on Binance TR or an existing user who hasn't made their first trade yet wins a reward worth 1,150 TL on their first crypto asset purchase Think of it like finding money in your

币安Binance华语 @binancezh · 2026-07-25T08:31:59+00:00

Dear #Binance Wallet Product Experience Officer, please check the updates for this week: • Spark lending now supports borrowing multiple tokens directly within the wallet • Added a hot search list for security tokens to quickly view popular security tokens • Now supports

Crypto Patel @CryptoPatel · 2026-07-25T05:29:45+00:00

ETF FLOWS: US SPOT CRYPTO ETFs FLOWS DATA UPDATE (24-07-2026) YESTERDAY Bitcoin ETFs: -3,745 $BTC (-$240.08M) Ethereum ETFs: -37,980 $ETH (-$70.62M) HYPE ETFs: -117.92K $HYPE (-$6.89M) CHAINLINK ETFs: +18.18K $LINK (+$151.81K) $XRP , $SOL , $BNB , $AVAX , $DOT , $HBAR ,

A dashboard titled 'SPOT ETF FLOWS' dated 24 July 2026 shows selling pressure with BTC at -3,745 (-$240.08M), ETH at -37,980 (-$70.62M), LINK at +18.18K (+$151.81K), and HYPE at -117.92K (-$6.89M), totaling a net flow of -$317.44M, with a note that U.S. Spot Bitcoin ETFs sold nearly 8 days' worth of mined Bitcoin supply.

AI visual analysis: A dashboard titled 'SPOT ETF FLOWS' dated 24 July 2026 shows selling pressure with BTC at -3,745 (-$240.08M), ETH at -37,980 (-$70.62M), LINK at +18.18K (+$151.81K), and HYPE at -117.92K (-$6.89M), totaling a net flow of -$317.44M, with a note that U.S. Spot Bitcoin ETFs sold nearly 8 days' worth of mined Bitcoin supply.

SwarmBase @SwarmBase · 2026-07-25T12:16:38+00:00

SwarmBase just hit #1 on @BNBCHAIN (DappBay, 24h). 171K users. 963K transactions. 30 days. This is what onchain verifiable agent coordination looks like. TGE incoming.

The image shows SwarmBase Statistics indicating 963.11K transactions and 171.63K users, with a sharp increase in users and transactions in late July. This visual data supports the accompanying post's claims of SwarmBase's success.

AI visual analysis: The image shows SwarmBase Statistics indicating 963.11K transactions and 171.63K users, with a sharp increase in users and transactions in late July. This visual data supports the accompanying post's claims of SwarmBase's success.

BITWU.ETH @Bitwux · 2026-07-25T02:15:57+00:00

Congratulations! $BNB has officially landed on Futu NiuNiu! This is also a very bold test; We're looking for the BTC in traditional finance, and traditional finance might also be looking for the Tencent, Alibaba, and NVIDIA in Crypto. So, will Crypto become a standardized

An advertisement with Chinese text promoting cryptocurrency trading on Futu, displaying 'BNB' alongside Bitcoin and BNB logos.

AI visual analysis: An advertisement with Chinese text promoting cryptocurrency trading on Futu, displaying 'BNB' alongside Bitcoin and BNB logos.

Eco Pulse Street @EcoPulseStreet · 2026-07-25T14:44:37+00:00

Binance TR announced that it has launched a new collaboration with MACTeam Runners, one of Turkey's largest running communities, which will run throughout the year. The partnership will be carried out under the name “MACTeam Runners Powered by Binance TR.” Under the program,

A promotional graphic for "Binance TR x MAC Team Runners" announces the partnership, showing runners crossing a bridge at sunset with text stating "MACTeam Runners artık 'Powered by Binance TR' kimliğiyle koşuyor" (MACTeam Runners now runs with the identity "Powered by Binance TR"). The image visually supports the post's announcement of a year-long collaboration between Binance TR and MACTeam Runners, one of Turkey's largest running communities.

AI visual analysis: A promotional graphic for "Binance TR x MAC Team Runners" announces the partnership, showing runners crossing a bridge at sunset with text stating "MACTeam Runners artık 'Powered by Binance TR' kimliğiyle koşuyor" (MACTeam Runners now runs with the identity "Powered by Binance TR"). The image visually supports the post's announcement of a year-long collaboration between Binance TR and MACTeam Runners, one of Turkey's largest running communities.

CryptoIDO @CryptoID0 · 2026-07-25T14:08:12+00:00

''Ben sporcunun zeki,çevik ve ahlaklısını severim.'' ATA'mızın bu güzel sözü ile tweetime başlamak istedim. Spor yapan kendini geliştiren ve sürekli hareket halinde olan insanlara ayrı sayı duyuyorum. Bugün de Binance TR'nin, Türkiye'nin en büyük koşu topluluklarından

A Binance TR promotional banner for the MACTeam Runners community, featuring 10,000+ runners and 50+ events, with key statistics on sponsorship, community, continuity, and communication, alongside icons highlighting goals like financial freedom and balance in life.

AI visual analysis: A Binance TR promotional banner for the MACTeam Runners community, featuring 10,000+ runners and 50+ events, with key statistics on sponsorship, community, continuity, and communication, alongside icons highlighting goals like financial freedom and balance in life.

Huginn|上Gate玩事件合约 @imbabyotter · 2026-07-25T17:12:25+00:00

YZi Labs × Xhunt Creator Event Kickoff: Why I'm Bullish on $HERTZ Driving the BSC Derivatives Ecosystem? Stumbled upon the creator event co-hosted by YZi Labs and Xhunt—had to jump in on day one to chat about @Hertzflow_xyz . Anyone who's regularly checking on-chain data on BSC

A promotional banner for 'YZi Labs Amplify S1($15K)' featuring ecosystem partners HertzFlow, Renaiss, and Velvet, with a 15,000 $USDC reward pool running from July 13 to August 10.

AI visual analysis: A promotional banner for 'YZi Labs Amplify S1($15K)' featuring ecosystem partners HertzFlow, Renaiss, and Velvet, with a 15,000 $USDC reward pool running from July 13 to August 10.

StarX Network @StarXCoreTeam · 2026-07-25T14:01:30+00:00

StarX Network – Wallet Submission Update is Now Live! We are pleased to announce that the latest StarX Network update is now live! To prepare for the upcoming TGE and STRX distribution, all users are requested to submit their BNB Smart Chain (BEP-20) wallet address.

The image features a bold orange and purple graphic with "STARX NETWORK" displayed at the top and "WALLET SUBMISSION" in large text across the center, promoting the announcement that StarX Network's wallet submission update is now live for the upcoming TGE and STRX distribution.

AI visual analysis: The image features a bold orange and purple graphic with "STARX NETWORK" displayed at the top and "WALLET SUBMISSION" in large text across the center, promoting the announcement that StarX Network's wallet submission update is now live for the upcoming TGE and STRX distribution.

旧金山不是巴黎(Meme部部长) @jiujinshan2022 · 2026-07-25T06:33:45+00:00

一姐转发的币安报告我已认真研读 作为币安的忠实用户 下面我把报告义务翻译给大家 报告标题《迎接新生代》 一姐援引处报告正文摘录--

Ub currency @ubong_27 · 2026-07-25T04:33:16+00:00

67 is now live on BNB Chain, expanding beyond one ecosystem. It's not about arbitrage it's about better access, deeper liquidity, and wider adoption. Every new chain makes SIXSEVEN stronger and more connected. @sixsevenapp @BNBCHAIN

A promotional graphic for the 'SIXSEVEN 67' token, highlighting a '+ NEW LISTING' on cryptocurrency exchanges including Binance, Bybit, and others shown by their logos.

AI visual analysis: A promotional graphic for the 'SIXSEVEN 67' token, highlighting a '+ NEW LISTING' on cryptocurrency exchanges including Binance, Bybit, and others shown by their logos.

小木头社区 @xiaomutoushequ · 2026-07-25T03:37:49+00:00

叙事还行,可以看位置上点 The artist made cz bull that hit 90M Now after 5y he made new meme for Heyi Meme queen is coded 0x991035c1F2E0EF75831c78b184958Cb9B9da4444

A screenshot of a "Meme Queen" token tracker showing HEYI/WBNB on PancakeSwap (BSC) with a $133K market cap, $139K FDV, and $33K liquidity, featuring a crowned cartoon cow mascot and strong 24-hour gains of 179%. The image visualizes the Heyi "Meme Queen" token discussed in the post, which references the same artist who previously created the CZ bull meme that reached a $90M market cap.

AI visual analysis: A screenshot of a "Meme Queen" token tracker showing HEYI/WBNB on PancakeSwap (BSC) with a $133K market cap, $139K FDV, and $33K liquidity, featuring a crowned cartoon cow mascot and strong 24-hour gains of 179%. The image visualizes the Heyi "Meme Queen" token discussed in the post, which references the same artist who previously created the CZ bull meme that reached a $90M market cap.

RWA Foundation @RWAFoundation_ · 2026-07-25T09:34:01+00:00

Tokenized treasuries - who's leading right now. @Ethereum still dominates by network at $7.2B, with @BNBCHAIN in second at $4.8B. On the platform side it's tight at the top - @Circle , @Securitize , and @Ondo all sit within $300M of each other.

A chart titled 'Top 5 networks and platforms by total distributed value, as of July 24, 2026' lists Ethereum ($7.2B) and BNB Chain ($4.8B) at the top, with Circle ($3.0B) and Securitize ($2.8B) leading the platforms, branded by 'RWA Foundation'.

AI visual analysis: A chart titled 'Top 5 networks and platforms by total distributed value, as of July 24, 2026' lists Ethereum ($7.2B) and BNB Chain ($4.8B) at the top, with Circle ($3.0B) and Securitize ($2.8B) leading the platforms, branded by 'RWA Foundation'.

sonsakripto @sonsakripto · 2026-07-25T16:45:11+00:00

I opened S&P's first crypto index, and for a moment, I froze. No Bitcoin. They said, "It's not a revenue-generating protocol." But TRX is there. Alongside ETH, BNB, SOL, TRON is on the list too. When I saw that part, I thought to myself, "Okay, we're heading to a different

The image announces "S&P'nin İlk Kripto Endeksi: TRX İçeride, BTC Dışarıda" (S&P's First Crypto Index: TRX Inside, BTC Outside), showing an S&P 500 panel listing ETH, BNB, SOL, and TRX as included cryptocurrencies while Bitcoin is marked "Excluded" with red X's. This visual reinforces the post's surprise that Bitcoin was omitted from the index as a "non-revenue-generating protocol," while TRON made the list alongside other revenue-generating protocols.

AI visual analysis: The image announces "S&P'nin İlk Kripto Endeksi: TRX İçeride, BTC Dışarıda" (S&P's First Crypto Index: TRX Inside, BTC Outside), showing an S&P 500 panel listing ETH, BNB, SOL, and TRX as included cryptocurrencies while Bitcoin is marked "Excluded" with red X's. This visual reinforces the post's surprise that Bitcoin was omitted from the index as a "non-revenue-generating protocol," while TRON made the list alongside other revenue-generating protocols.

CryptosRus @CryptosR_Us · 2026-07-25T21:57:00+00:00

CZ IS “PRETTY EXCITED” ABOUT THE RWA BOOM “Before, only Americans traded, and a few institutions around the world could. But you don’t reach the masses.” CZ says blockchain changes that by making tokenized real-world assets accessible to a global investor base.

DemirHan @VizyonAI_ · 2026-07-25T15:32:50+00:00

| GIFT GIVEAWAY I'm giving away a total of $20 to 2 lucky followers! The task is very simple: • On this post: RT and Like (Results will be announced through the app) #Giveaway #Kripto #Crypto #Airdrop #FreeMoney #TON #Binance #Bitcoin #Ethereum #Hediye

梭哈.AI @SUOHA_AI · 2026-07-25T13:59:37+00:00

Base App launched a farming event—35U Standard: • Single Swap ≥ 100U → Reward 10U • Single Swap ≥ 250U → Reward 25U Must be completed in one transaction (cannot be split), and the reward center must show success (Currently tested: Using the BSC chain works better; just

Four screenshots of a cryptocurrency wallet app showing a swap interface with red Chinese text instructing where to swap, claiming no successful swap has occurred yet, and indicating a referral reward center.

AI visual analysis: Four screenshots of a cryptocurrency wallet app showing a swap interface with red Chinese text instructing where to swap, claiming no successful swap has occurred yet, and indicating a referral reward center.

Moby @mobyagent · 2026-07-25T12:34:02+00:00

gmoby some ideas for your weekend: - read the smart money - trade SOL, RH, BNB, Base coins - manage your positions with TP/SL - touch grass

Crypto with Haris ₿ @Crypto__Haris · 2026-07-25T05:50:59+00:00

Who wants to see this notification on #Binance ? tipping 10 user $100 . Drop your Binance UID

A screenshot of a Binance notifications screen showing that user "Crypto__Haris" has tipped the account 100 USDT and followed them on April 14. The image illustrates the post's promise of a $100 USDT tip, with the recipient's wallet showing a balance of 63 (likely partial received amount).

AI visual analysis: A screenshot of a Binance notifications screen showing that user "Crypto__Haris" has tipped the account 100 USDT and followed them on April 14. The image illustrates the post's promise of a $100 USDT tip, with the recipient's wallet showing a balance of 63 (likely partial received amount).

小孩 @caicai1953 · 2026-07-25T05:35:15+00:00

High-Quality KYC Services for Sale Supports mainstream cryptocurrency exchanges and Web3 platforms, including: • Binance • Bybit • KuCoin • Bitget • BingX • Backpack • Gate.com (Sesame Open) • Selected airdrop projects (Airdrop Projects) • Claude and

The image is a promotional graphic for "SecureKYC" featuring a white padlock icon on a dark blue background, with text advertising "3+ YEARS EXPERIENCE," "FAST & TRUSTED," and "WORLDWIDE SERVICE." It visually reinforces the post's offer of high-quality KYC services for various cryptocurrency exchanges and Web3 platforms, emphasizing security, credibility, and global reach.

AI visual analysis: The image is a promotional graphic for "SecureKYC" featuring a white padlock icon on a dark blue background, with text advertising "3+ YEARS EXPERIENCE," "FAST & TRUSTED," and "WORLDWIDE SERVICE." It visually reinforces the post's offer of high-quality KYC services for various cryptocurrency exchanges and Web3 platforms, emphasizing security, credibility, and global reach.

ALIMA @Alima_dao88 · 2026-07-25T05:48:40+00:00

New to Binance? Start Here. Everyone remembers that first login too many buttons, too many charts, and that quiet where do I even start feeling. The order that actually makes sense: Verification comes first. It's not just a formality, it's what locks your account down and

A Binance onboarding graphic titled "New to Binance? Start Here." illustrates a five-step beginner journey with icons and descriptions: Verified Account ("Secure access to everything"), Deposit ("Fund your account safely"), Convert ("Easy swap, no hassle"), Spot Trading ("Buy & hold real assets"), and Simple Earn ("Grow your crypto while you hold"). It visually reinforces the post's advice that verification comes first, followed by depositing funds as the logical next step before exploring trading and earning features.

AI visual analysis: A Binance onboarding graphic titled "New to Binance? Start Here." illustrates a five-step beginner journey with icons and descriptions: Verified Account ("Secure access to everything"), Deposit ("Fund your account safely"), Convert ("Easy swap, no hassle"), Spot Trading ("Buy & hold real assets"), and Simple Earn ("Grow your crypto while you hold"). It visually reinforces the post's advice that verification comes first, followed by depositing funds as the logical next step before exploring trading and earning features.

Crypto Town Hall @Crypto_TownHall · 2026-07-25T03:30:00+00:00

Binance Research reveals that Gen Z is leading trading volumes for Direct Stocks and TradFi Perps, generating $80 billion in activity.

The bar chart displays generational percentages across five life stages: "In adolescence" (Gen Z 6%, Millennials 2%, Gen X 1%, Baby Boomers 2%), "In early adulthood" (30%, 15%, 9%, 6%), "When I entered workforce" (36%, 37%, 27%, 24%), "Years after entering workforce" (22%, 43%, 58%, 51%), and "In retirement" (2%, 13%). The chart supports the Binance Research claim by showing Gen Z's notably higher trading engagement in adolescence and early adulthood compared to other generations, correlating with their leading $80 billion in Direct Stocks and TradFi Perps trading activity.

AI visual analysis: The bar chart displays generational percentages across five life stages: "In adolescence" (Gen Z 6%, Millennials 2%, Gen X 1%, Baby Boomers 2%), "In early adulthood" (30%, 15%, 9%, 6%), "When I entered workforce" (36%, 37%, 27%, 24%), "Years after entering workforce" (22%, 43%, 58%, 51%), and "In retirement" (2%, 13%). The chart supports the Binance Research claim by showing Gen Z's notably higher trading engagement in adolescence and early adulthood compared to other generations, correlating with their leading $80 billion in Direct Stocks and TradFi Perps trading activity.

Ruby @Rubycryptoz · 2026-07-25T14:10:27+00:00

SEAMLESS SYNERGY: UNLOCKING TRON DEFI POTENTIAL VIA BINANCE WALLET The seamless collaboration between JustLend DAO and Binance Wallet DeFi represents a major leap forward in user accessibility for decentralized finance. By combining Binance’s intuitive mobile wallet

The image displays a glowing neon-styled announcement banner for "JustLend DAO" featuring the logo at the top and the website "justlend.org" at the bottom, set against a vibrant blue and teal background that visually reinforces the post's message about an exciting new collaboration between JustLend DAO and Binance Wallet DeFi to expand TRON's DeFi accessibility.

AI visual analysis: The image displays a glowing neon-styled announcement banner for "JustLend DAO" featuring the logo at the top and the website "justlend.org" at the bottom, set against a vibrant blue and teal background that visually reinforces the post's message about an exciting new collaboration between JustLend DAO and Binance Wallet DeFi to expand TRON's DeFi accessibility.

Sir Mapy @sirmapy · 2026-07-25T10:00:01+00:00

SNR should be up this weekend. All core services have been deployed. We will be concentrating all liquidity from other chains on BNB as this has been our most successful chain in terms of holders. Our goal is to make StableNaira LP the deepest liquidity for Naira on chain.

KT @KT_BTC · 2026-07-25T06:29:25+00:00

The VN exchanges launching in the near future are hoped to have the contribution of the Top 1 CEX #Binance kk Binance expects to become a part of the International Financial Center in Vietnam. If any exchange uses the full interface, liquidity, coin diversity, and has

A yellow graphic with a fire emoji and Vietnamese text stating '🔥 Binance kỳ vọng trở thành một phần của Trung tâm Tài chính Quốc tế tại Việt Nam' (Binance expects to become part of the International Financial Center in Vietnam).

AI visual analysis: A yellow graphic with a fire emoji and Vietnamese text stating '🔥 Binance kỳ vọng trở thành một phần của Trung tâm Tài chính Quốc tế tại Việt Nam' (Binance expects to become part of the International Financial Center in Vietnam).

Supers @Supers6061 · 2026-07-25T05:37:57+00:00

Stop singling out bStocks for liquidity comparisons—it's inherently just one piece of a broader combo strategy Lately, I've come across quite a bit of content discussing bStocks, and I've noticed people comparing it to similar tokenized stocks on the market by looking at order

A Binance advertisement in Chinese promoting "bStocks 流动性" (bStocks Liquidity), highlighting features like 1:1 free conversion between Binance Stocks and bStocks, 24/7 trading, and a promotion ending October 15th with 3x trading volume rewards.

AI visual analysis: A Binance advertisement in Chinese promoting "bStocks 流动性" (bStocks Liquidity), highlighting features like 1:1 free conversion between Binance Stocks and bStocks, 24/7 trading, and a promotion ending October 15th with 3x trading volume rewards.

rektober @rektober · 2026-07-25T20:52:16+00:00

CRYPTOCURRENCY PERFORMANCE YEAR TO DATE $BTC : -29.72% $ETH : -40.48% $BNB : -36.52% $XRP : -47.43% $SOL : -44.49% who are we blaming for this boys? is it Trump, is it the juice, is it fucking TheMisterFrog or who??? anyways gotta enjoy and love a bear market

Nefes Kaya @nefeskaya_ · 2026-07-25T21:53:07+00:00

Imagine owning a stock, a bond, or even real estate. Now imagine transferring it as easily as a digital asset. That’s the promise of tokenization, bringing familiar assets onto the blockchain. #Binance #BinanceAcademy #LearnWithBinance

This infographic from Binance Academy, titled "The Next Big Shift in Finance? It Might Be Tokenization," features a woman surrounded by floating tokenized asset representations including stocks, bonds, real estate, and commodities, with graphics highlighting benefits like faster settlement, greater transparency, fractional ownership, and global market access. It visually reinforces the post's message by illustrating how tokenization brings traditional financial assets onto the blockchain for easier, more accessible transfer and ownership.

AI visual analysis: This infographic from Binance Academy, titled "The Next Big Shift in Finance? It Might Be Tokenization," features a woman surrounded by floating tokenized asset representations including stocks, bonds, real estate, and commodities, with graphics highlighting benefits like faster settlement, greater transparency, fractional ownership, and global market access. It visually reinforces the post's message by illustrating how tokenization brings traditional financial assets onto the blockchain for easier, more accessible transfer and ownership.

UKong @CryptoUKong · 2026-07-25T01:25:00+00:00

24/7 Closed-Loop Liquidity: In Layman's Terms, the Core Advantage of bStocks There's a common misconception in the market about #bStocks liquidity, where people simply use the traditional order book depth during U.S. stock market hours to benchmark on-chain transactions on

A Chinese-language infographic about 'bStocks' crypto token, featuring a cartoon dog mascot and nine numbered sections explaining its features like '1:1 asset backing,' arbitrage mechanisms, and 24/7 liquidity on Binance.

AI visual analysis: A Chinese-language infographic about 'bStocks' crypto token, featuring a cartoon dog mascot and nine numbered sections explaining its features like '1:1 asset backing,' arbitrage mechanisms, and 24/7 liquidity on Binance.

CryptoLord NE @CryptoDefiLord · 2026-07-25T08:02:34+00:00

Like those kols shilling Vladhood knowing fully well that it was an hacker that deployed it, what were they thinking? Four memes lol Like such things are only possible in BNB chain and CZ book. Now you got rekted hope you change your mindset.

James Awesome @awesome_geniuz · 2026-07-25T17:13:42+00:00

The $67 token has officially expanded to the BNB Chain. CA: 0xE7E569417D315Ef260778C09d289d7966213C452 There is currently no arbitrage opportunity, meaning the price is aligned across chains, a healthy sign of a properly managed multi-chain launch. This expansion to @BNBCHAIN

A man wearing glasses and a black polo shirt with an orange Binance logo smiles at the camera while holding up both hands, displaying ten fingers to represent the "10" likely tied to the token's expansion onto the BNB Chain. The gesture visually reinforces the healthy, multi-chain launch described in the post, where the token's price remains aligned across networks with no arbitrage opportunity.

AI visual analysis: A man wearing glasses and a black polo shirt with an orange Binance logo smiles at the camera while holding up both hands, displaying ten fingers to represent the "10" likely tied to the token's expansion onto the BNB Chain. The gesture visually reinforces the healthy, multi-chain launch described in the post, where the token's price remains aligned across networks with no arbitrage opportunity.

阿里嘎多美羊羊桑 @wangy112375 · 2026-07-25T11:32:15+00:00

I rejoined Binance Alpha at the beginning of June, and it's been almost two months now. From the 22nd to 26th, I consecutively caught ARX, NES, CAP, and sold them for a total of 195U. But since then, it's been 29 straight days without any new token airdrops. I've been tracking

A spreadsheet in Chinese tracking trading events, including labels like 'KGEN交易赛', 'NES交易赛', and 'ARK', with columns for date, trading volume in alpha, losses, points, and revenue, ending with totals on July 25, 2026.

AI visual analysis: A spreadsheet in Chinese tracking trading events, including labels like 'KGEN交易赛', 'NES交易赛', and 'ARK', with columns for date, trading volume in alpha, losses, points, and revenue, ending with totals on July 25, 2026.

Orion @OrionOriMaster · 2026-07-25T10:29:24+00:00

Create something worth revolving around - the rest will find its orbit That's what gravity does. That's what #Orion does on @BNBCHAIN . #OrionDEX #OrionBNB #BNBCHAIN

The image features the Orion logo in the top-left corner alongside two overlapping triangles (a small purple one and a large orange one) that visually resemble orbital paths, paired with the tagline "Create Gravity, Build Your Orbit." This design ties directly into the post's message about creating gravitational pull within the crypto space, with the triangles symbolizing orbits around which other elements naturally revolve—mirroring how Orion on BNBCHAIN aims to attract projects and users into its ecosystem.

AI visual analysis: The image features the Orion logo in the top-left corner alongside two overlapping triangles (a small purple one and a large orange one) that visually resemble orbital paths, paired with the tagline "Create Gravity, Build Your Orbit." This design ties directly into the post's message about creating gravitational pull within the crypto space, with the triangles symbolizing orbits around which other elements naturally revolve—mirroring how Orion on BNBCHAIN aims to attract projects and users into its ecosystem.

鱼泡泡 @yupaopao0 · 2026-07-25T13:33:10+00:00

A Few Key Points to Note About the Base Event Event Entry: Go to the homepage and enter swap Must swap via the homepage to count Prioritize selecting the BSC chain (cost 0.5u) Need to prepare BNB as transaction fee + 251 USDT Must deposit USDT to waive fees Upgrade

The image shows a crypto trading app interface with a swap function highlighted, displaying a "US$0" amount between USDT (US$182.54) and USDC (US$5.00) with a numeric keypad below and a red arrow pointing to the swap icon. The Chinese text "从首页这里swap" (swap from the homepage here) emphasizes the post's instruction that users must enter the swap feature via the homepage for the Base event to count.

AI visual analysis: The image shows a crypto trading app interface with a swap function highlighted, displaying a "US$0" amount between USDT (US$182.54) and USDC (US$5.00) with a numeric keypad below and a red arrow pointing to the swap icon. The Chinese text "从首页这里swap" (swap from the homepage here) emphasizes the post's instruction that users must enter the swap feature via the homepage for the Base event to count.

Meta @metaio102 · 2026-07-25T11:32:32+00:00

Ever had that feeling of unlimited refills? If we're talking about the most stable investment option this year, which one is it? @worldlibertyfi definitely has a spot on that list—look, here it comes again! I'm increasingly feeling like Binance is cultivating users' usage

Binance announces an extension of its WLFI token airdrop campaign for USD1 holders, running from July 10 to August 7, 2026, with weekly rewards distributed from a 165 million WLFI pool. The image directly supports the post's claim that Binance is repeatedly incentivizing users to engage with World Liberty Financial's USD1 stablecoin, reinforcing the "unlimited refills" sentiment.

AI visual analysis: Binance announces an extension of its WLFI token airdrop campaign for USD1 holders, running from July 10 to August 7, 2026, with weekly rewards distributed from a 165 million WLFI pool. The image directly supports the post's claim that Binance is repeatedly incentivizing users to engage with World Liberty Financial's USD1 stablecoin, reinforcing the "unlimited refills" sentiment.

David_John @David_John_555 · 2026-07-25T19:28:51+00:00

Binance Trust & Regulatory Commitment — MENA & Pakistan In crypto, trust is not created by bold statements. It grows through consistent action, strong security practices, regulatory cooperation, and a willingness to build responsibly. That is why Binance continues to work

This infographic highlights Binance's "Trust & Regulatory Commitment" in MENA & Pakistan, detailing regional milestones and key takeaways on accountability and security. The image directly supports the accompanying post by visually outlining the concrete steps Binance is taking to build trust and ensure compliance.

AI visual analysis: This infographic highlights Binance's "Trust & Regulatory Commitment" in MENA & Pakistan, detailing regional milestones and key takeaways on accountability and security. The image directly supports the accompanying post by visually outlining the concrete steps Binance is taking to build trust and ensure compliance.

Solana Hub @SolanaHub_ · 2026-07-25T14:00:00+00:00

Top chain rankings by Active Addresses last 7D @solana @BNB_Hub @trondao @Bitcoin @ethereum @SuiNetwork @0xPolygon @base @RobinhoodApp @arbitrum

Here's a caption:

Top chain rankings by active addresses last 7D shows Solana leading with 19.0M active addresses, followed by BNB Hub and TRON DAO, aligning with the provided list of projects.

AI visual analysis: Here's a caption: Top chain rankings by active addresses last 7D shows Solana leading with 19.0M active addresses, followed by BNB Hub and TRON DAO, aligning with the provided list of projects.

DxH.xbt @DxHxbt · 2026-07-25T08:13:03+00:00

The 3-year revenue rankings for Layer 1 blockchains @injective is sitting at #8 with $22.5 million in protocol revenue. To put that in context: • $TRON leads with $7.7B • $ETH follows at $3.1B • $SOL is at $595M • Then $AVAX , $BNB , $POL & $TON $INJ comes in right after

A dashboard titled "Revenue for Blockchains (L1)" shows Injective ranked 8th with $22.5M in 3-year revenue, behind Tron ($7.7B), Ethereum ($3.1B), Solana ($595.3M), Avalanche ($841M), BNB Chain ($627M), Polygon ($26.9M), and TON ($23.1M), followed by NEAR Protocol ($179M) and Sui ($17.4M).

AI visual analysis: A dashboard titled "Revenue for Blockchains (L1)" shows Injective ranked 8th with $22.5M in 3-year revenue, behind Tron ($7.7B), Ethereum ($3.1B), Solana ($595.3M), Avalanche ($841M), BNB Chain ($627M), Polygon ($26.9M), and TON ($23.1M), followed by NEAR Protocol ($179M) and Sui ($17.4M).

Ace @AceofBNB · 2026-07-25T11:50:17+00:00

X is cool because we can post photos and some guy named CZ will comment “nice”

Two men smile for a selfie at what appears to be a crypto event, standing in front of a Binance promotional banner with text referencing "l'applicazione mobile" (Italian for "the mobile application"), visually confirming the casual encounter with Binance founder CZ (Changpeng Zhao) referenced in the post about his signature "nice" comments on social media.

AI visual analysis: Two men smile for a selfie at what appears to be a crypto event, standing in front of a Binance promotional banner with text referencing "l'applicazione mobile" (Italian for "the mobile application"), visually confirming the casual encounter with Binance founder CZ (Changpeng Zhao) referenced in the post about his signature "nice" comments on social media.

SaleeM @Salee3M_ · 2026-07-25T16:04:28+00:00

AI in finance goes far beyond chatbots. It can help detect unusual activity, organise data, speed up routine checks and improve customer support. But AI should support people, not replace human judgement. #Binance #LearnWithBinance

BSCDaily @bsc_daily · 2026-07-25T14:54:21+00:00

BNB expands its institutional reach. $BNB is now live on Futubull, making it the first licensed brokerage in Hong Kong to offer BNB order book trading with transparent, real-time market data.

A promotional advertisement from Futubull (富途牛牛) featuring Bitcoin and BNB coin graphics, announcing that BNB trading is now open to PI customers, with the headline "BNB 已對PI客戶開放交易" (BNB now available for trading to PI clients). The image visually reinforces the announcement of BNB's expansion to institutional PI clients on the Hong Kong-licensed brokerage platform.

AI visual analysis: A promotional advertisement from Futubull (富途牛牛) featuring Bitcoin and BNB coin graphics, announcing that BNB trading is now open to PI customers, with the headline "BNB 已對PI客戶開放交易" (BNB now available for trading to PI clients). The image visually reinforces the announcement of BNB's expansion to institutional PI clients on the Hong Kong-licensed brokerage platform.

Thien Thien @Thienthien1305 · 2026-07-25T14:38:18+00:00

Can't withdraw money multiple times. Turns out it's because Binance is protecting users, bros. In many cases of hacks, no matter which address you copy, it pastes the hacker's address. Binance detects the scam address so it won't let you withdraw money. There are some scam

A Binance withdrawal screen showing a pending receipt of 571.21 USDT (≈₫15,035,463.88) is blocked by a warning popup labeled [RW00380], stating that the user has repeatedly attempted to withdraw to a fraudulent address, so the withdrawal function has been temporarily suspended for an estimated 23 hours and 59 minutes, with a "Huỷ" (Cancel) button to dismiss it. This illustrates the post's point that Binance's security system automatically detects scam addresses and prevents withdrawals to protect users from being tricked by clipboard-hijacking hacks.

AI visual analysis: A Binance withdrawal screen showing a pending receipt of 571.21 USDT (≈₫15,035,463.88) is blocked by a warning popup labeled [RW00380], stating that the user has repeatedly attempted to withdraw to a fraudulent address, so the withdrawal function has been temporarily suspended for an estimated 23 hours and 59 minutes, with a "Huỷ" (Cancel) button to dismiss it. This illustrates the post's point that Binance's security system automatically detects scam addresses and prevents withdrawals to protect users from being tricked by clipboard-hijacking hacks.

HexVanilla @hex_vanilla · 2026-07-25T05:16:05+00:00

CZ once changed his PFP to my CZ Bull meme. It's time for you now, meme queen? @heyibinance 大表哥曾经把头像换成我做的meme,现在该你啦一姐,表情包女王。

A 3D-rendered cartoon cow with gray skin, long black hair, a pink muzzle, and gold hoop earrings wears an ornate jeweled gold crown with pink gems against a bright yellow background. The "meme queen" caption references the image as a royal tribute inviting @heyibinance to follow CZ's example by adopting it as a profile picture.

AI visual analysis: A 3D-rendered cartoon cow with gray skin, long black hair, a pink muzzle, and gold hoop earrings wears an ornate jeweled gold crown with pink gems against a bright yellow background. The "meme queen" caption references the image as a royal tribute inviting @heyibinance to follow CZ's example by adopting it as a profile picture.

旧金山不是巴黎(Meme部部长) @jiujinshan2022 · 2026-07-25T08:06:10+00:00

Everyone, please read the Binance report carefully. The title and body mention the keyword "new generation" multiple times. I've sent you the CA, you can take a look. Now at 8K. It hasn't launched yet, I think this is at least a Chinese coin that can launch.

Brian Sumner @xBrianSumner · 2026-07-25T13:31:10+00:00

Save Meme Culture is an action. We don't just speak it, we live it! I've been seeing founder of Hachiko building for many months on @BNBCHAIN so decided to help support. Let the builders on BNB stick together TXN:

花白 @BNBTC8 · 2026-07-25T11:20:55+00:00

Lately, I've seen way too many people mixing up BitMart and BitMEX. The official announcement about halting exchange operations on September 23 is from BitMEX, and it has absolutely nothing to do with BitMart. The two companies operate completely independently; they're just

A promotional graphic for 'BitMart' featuring a white unicorn character in an orange hoodie surrounded by cryptocurrency and stock logos including Bitcoin, Apple, Tesla, Ethereum, and others, with Chinese text and 'Wall St' street sign in the background.

AI visual analysis: A promotional graphic for 'BitMart' featuring a white unicorn character in an orange hoodie surrounded by cryptocurrency and stock logos including Bitcoin, Apple, Tesla, Ethereum, and others, with Chinese text and 'Wall St' street sign in the background.

Davinci @DavinciTRKripto · 2026-07-25T14:59:03+00:00

A special campaign has arrived from Binance TR for this month Short and to the point Sign up for Binance TR and make your first buy-sell to earn 1,150 TL If you already have a membership and haven't made any buy-sell transactions before, you can earn too No strings attached,

迪士尼在逃MiKi @babemiki209 · 2026-07-25T13:13:52+00:00

TermMax @TermMaxFi has launched a new fixed-rate borrowing market for USDT on the BNB chain, with the rate locked directly at 3.5%. This isn't the kind of floating rate that starts with a low rate to lure people in and then quietly hikes it up a few days later—nor is it a

The image displays a TermMax fixed-rate borrowing interface on the BNB chain, listing eight USDT loan offers against various collateral tokens (MSFTon, QQQon, NFLXon, TSLAon, NVDAon, SiPTon), all showing a consistent borrow APR of 3.5% with 73–78% LTV ratios. This visually reinforces the post's claim that TermMax offers a straightforward, locked 3.5% fixed rate—rather than a promotional floating rate—across multiple collateral options for stable, transparent USDT borrowing.

AI visual analysis: The image displays a TermMax fixed-rate borrowing interface on the BNB chain, listing eight USDT loan offers against various collateral tokens (MSFTon, QQQon, NFLXon, TSLAon, NVDAon, SiPTon), all showing a consistent borrow APR of 3.5% with 73–78% LTV ratios. This visually reinforces the post's claim that TermMax offers a straightforward, locked 3.5% fixed rate—rather than a promotional floating rate—across multiple collateral options for stable, transparent USDT borrowing.

Karim @rezaul_karim_1x · 2026-07-25T08:25:47+00:00

How long should a community wait without a single official update? Dear @r3vl_xyz , the Binance Wallet Booster Campaign ended quite some time ago, yet many participants are still seeing "Pending TGE or Vesting" with no clear explanation. We are not asking for special treatment

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

DaveWeb3Saint @DaveWeb3Saint · 2026-07-25T06:57:21+00:00

Big milestones don’t usually arrive alone. @sixsevenapp is now live on BNB Chain, while 67 continues to push into new ATH (all time high). That’s the kind of momentum you like to see. → 67 is now live on BNB Chain → Another ATH → 110,000+ community members → The

A crypto tracking page showing the SIXSEVEN token (67/USDT) on BSC via PancakeSwap V3, bridged from GRAM (ex-TON), with a price of $0.02000, market cap of $108K, and a 24H change of +38.55%.

AI visual analysis: A crypto tracking page showing the SIXSEVEN token (67/USDT) on BSC via PancakeSwap V3, bridged from GRAM (ex-TON), with a price of $0.02000, market cap of $108K, and a 24H change of +38.55%.

Greg Miller @greg_miller05 · 2026-07-25T10:11:24+00:00

Getting started on @binance can feel like a lot at first, there are dozens of products, features, and menus. But the actual first steps are simpler than they look. 𝗦𝘁𝗲𝗽 𝟭: 𝗜𝗱𝗲𝗻𝘁𝗶𝘁𝘆 𝗩𝗲𝗿𝗶𝗳𝗶𝗰𝗮𝘁𝗶𝗼𝗻 This is the foundation. Before you can deposit, trade, or

A Binance infographic titled "Getting Started on Binance in 4 Simple Steps" outlines the onboarding process: 1) Identity Verification, 2) Make a Small Deposit, 3) Try Binance Convert (between Bitcoin and Tether), and 4) Explore at Your Own Pace, featuring a phone showing the Binance app interface and a "Learn" / "Grow" path leading to a glowing door.

AI visual analysis: A Binance infographic titled "Getting Started on Binance in 4 Simple Steps" outlines the onboarding process: 1) Identity Verification, 2) Make a Small Deposit, 3) Try Binance Convert (between Bitcoin and Tether), and 4) Explore at Your Own Pace, featuring a phone showing the Binance app interface and a "Learn" / "Grow" path leading to a glowing door.

ZC|捡到一个BNB @ZhanweiC · 2026-07-25T08:49:53+00:00

Previously, exchanges were all showing off their crypto snapshots, but now they're starting to compete over traditional financial service licenses. Bitget has just completed registration in the New Zealand Financial Service Providers Register (FSPR), covering foreign exchange,

Bitget has officially registered as a financial service provider in New Zealand, as indicated by the announcement image featuring the exchange's logo and the FSPR (Financial Service Providers Register) badge. The registration marks the platform's expansion beyond crypto trading into traditional financial services like foreign exchange, signaling a broader industry trend of crypto exchanges pursuing regulated financial licenses.

AI visual analysis: Bitget has officially registered as a financial service provider in New Zealand, as indicated by the announcement image featuring the exchange's logo and the FSPR (Financial Service Providers Register) badge. The registration marks the platform's expansion beyond crypto trading into traditional financial services like foreign exchange, signaling a broader industry trend of crypto exchanges pursuing regulated financial licenses.

Kriptoskapital @kriptoskapital · 2026-07-25T09:33:44+00:00

CZ Binance hasn't woken up yet. Once he wakes up, the show will start in a few hours. Weekend pump show Coins under #coinler with 30 or even 20 million$ and around that are pump candidates.

Anndy Lian @anndylian · 2026-07-25T16:01:00+00:00

Evolving Crypto Into Web4 with @binance . We continue to build no matter bull or bear!

Para Mühendisi @paramuhendisim · 2026-07-25T20:34:14+00:00

A really great piece of news that brings together the world of sports and crypto. Binance TR will support MACTeam Runners throughout the year. The partnership's name: MACTeam Runners Powered by Binance TR. For those curious about what's happening at the event, let me

A promotional banner announces the partnership between Binance TR and MACTeam Runners, featuring the text "BINANCE TR x MAC TEAM RUNNERS" alongside Turkish copy reading "MACTeam Runners artık 'Powered by Binance TR' kimliğiyle koşuyor." The image shows runners crossing a bridge, visually reinforcing the sports collaboration with the crypto platform.

AI visual analysis: A promotional banner announces the partnership between Binance TR and MACTeam Runners, featuring the text "BINANCE TR x MAC TEAM RUNNERS" alongside Turkish copy reading "MACTeam Runners artık 'Powered by Binance TR' kimliğiyle koşuyor." The image shows runners crossing a bridge, visually reinforcing the sports collaboration with the crypto platform.

Parrot I BNBChain @ParrotBamboo07 · 2026-07-25T17:39:06+00:00

Proud to continue my journey with @BNBCHAIN , now officially serving as an Ambassador for Türkiye ( MENA ) Being part of the $BNB Chain ecosystem has been an incredible experience, and I'm excited to take the next step in contributing even more. I'll continue supporting

A sleek promotional graphic featuring the BNB Chain logo alongside the text "BNB CHAIN — TÜRKİYE / MENA —" against a dark background with a stylized gold map highlighting the Türkiye and MENA regions, visually reinforcing the ambassador role announcement for the region.

AI visual analysis: A sleek promotional graphic featuring the BNB Chain logo alongside the text "BNB CHAIN — TÜRKİYE / MENA —" against a dark background with a stylized gold map highlighting the Türkiye and MENA regions, visually reinforcing the ambassador role announcement for the region.

Crypto @bnb_girl1 · 2026-07-25T08:39:54+00:00

What #memecoin is ready to do this?

A cryptocurrency trading chart displays a single tall green candlestick, representing a significant price surge. The accompanying post asks "What #memecoin is ready to do this?", suggesting the chart illustrates a massive bullish breakout or pump typical of speculative meme coin rallies.

AI visual analysis: A cryptocurrency trading chart displays a single tall green candlestick, representing a significant price surge. The accompanying post asks "What #memecoin is ready to do this?", suggesting the chart illustrates a massive bullish breakout or pump typical of speculative meme coin rallies.

Binance Pakistan @BinancePk · 2026-07-25T16:00:48+00:00

sach hai kya dosto ?

A yellow graphic titled 'Lies I tell myself:' lists three common excuses: 'Just one more episode' next to the Netflix logo, 'Just one more reel' next to the Instagram logo, and 'Just 1 more trade' next to the Binance logo.

AI visual analysis: A yellow graphic titled 'Lies I tell myself:' lists three common excuses: 'Just one more episode' next to the Netflix logo, 'Just one more reel' next to the Instagram logo, and 'Just 1 more trade' next to the Binance logo.

Oore @babybambsss · 2026-07-25T18:44:27+00:00

Imagine a digital world where blockchains no longer feel like separate islands. Ethereum, BNB, Polygon, Solana and beyond all connected through smoother pathways. That is the dream behind the cross chain future. Rezor is building toward that kind of connected Web3, where users

A woman with long dark hair stands on a balcony overlooking a futuristic aquatic cityscape, where luminous bridges connect sleek island metropolises—visually echoing the post's vision of interconnected blockchains (Ethereum, BNB, Polygon, Solana) linked by seamless cross-chain pathways in a unified Web3 future, with Rezor representing the central hub tying them together.

AI visual analysis: A woman with long dark hair stands on a balcony overlooking a futuristic aquatic cityscape, where luminous bridges connect sleek island metropolises—visually echoing the post's vision of interconnected blockchains (Ethereum, BNB, Polygon, Solana) linked by seamless cross-chain pathways in a unified Web3 future, with Rezor representing the central hub tying them together.

每日空投/New Airdrop @yujuhao · 2026-07-25T12:44:19+00:00

TGE is coming soon? I've only been doing this for a few days : point.swarmbase.io/?ref=0x5c49916 … Although the opbnb chain hasn't had any major issues I've still done a bit for self-defense, it's no big deal if not

A screenshot of a SwarmBase (@SwarmBase) tweet in Chinese announcing that the project just topped #1 on @BNBCHAIN's DappBay (24-hour ranking) with 171K users, 963K transactions in 30 days, and notably highlighted with a red box stating "TGE 即将来临" (TGE is coming soon), along with attached analytics charts showing user statistics and AI category growth. The image aligns with the accompanying post by showcasing the upcoming TGE announcement and the project's impressive on-chain metrics that made it a #1 dApp on BNB Chain.

AI visual analysis: A screenshot of a SwarmBase (@SwarmBase) tweet in Chinese announcing that the project just topped #1 on @BNBCHAIN's DappBay (24-hour ranking) with 171K users, 963K transactions in 30 days, and notably highlighted with a red box stating "TGE 即将来临" (TGE is coming soon), along with attached analytics charts showing user statistics and AI category growth. The image aligns with the accompanying post by showcasing the upcoming TGE announcement and the project's impressive on-chain metrics that made it a #1 dApp on BNB Chain.

Your Crypto DJ @yourcryptodj · 2026-07-25T17:00:01+00:00

2013 - You missed $BTC 2014 - You missed $DOGE 2015 - You missed $XRP 2016 - You missed $ETH 2017 - You missed $ADA 2018 - You missed $BNB 2021 - You missed $SHIB 2023 - You missed $PEPE 2024 - You missed $BRETT In 2026, don't miss $_____

Seth @seth_fin · 2026-07-25T19:31:12+00:00

BREAKING: S&P just launched a new digital asset index with Pantera. Only tokens that generate real revenue and pass it to holders. 18 of them. $ETH , $BNB , $SOL , $TRX , $HYPE are the biggest weights.

Mr.理想三旬( @Li888Real · 2026-07-25T02:06:52+00:00

Seeing the questions @binancezh @binance threw out this time, everyone is thinking about how to clearly explain the liquidity of bStocks. Order books, market makers, 1:1 conversions, BNB Chain—these all need to be covered, of course. But I think that some complex problems can

A Binance infographic highlighting "bStocks" emphasizes the quote "流动性,本身就是资产价值的一部分" (Liquidity is inherently part of asset value), detailing how Binance Stocks integrates with bStocks to form a unified liquidity ecosystem across Binance Spot, the order book market, and BNB Chain, featuring 700+ stock tokens and 24/7 trading. The chart supports the accompanying post's point by visually breaking down the complex, multi-layered liquidity mechanisms—including market makers, 1:1 conversion mechanisms, and the underlying BNB Chain—that make stock token trading viable on the platform.

AI visual analysis: A Binance infographic highlighting "bStocks" emphasizes the quote "流动性,本身就是资产价值的一部分" (Liquidity is inherently part of asset value), detailing how Binance Stocks integrates with bStocks to form a unified liquidity ecosystem across Binance Spot, the order book market, and BNB Chain, featuring 700+ stock tokens and 24/7 trading. The chart supports the accompanying post's point by visually breaking down the complex, multi-layered liquidity mechanisms—including market makers, 1:1 conversion mechanisms, and the underlying BNB Chain—that make stock token trading viable on the platform.

Solana Hub @SolanaHub_ · 2026-07-25T21:00:00+00:00

Top chains by App Revenue last 7D @solana @ethereum @HyperliquidX @0xPolygon @RobinhoodApp @base @ADIChain_ @BNBCHAIN @arbitrum @zksync

Infographic titled 'Top chains by App Revenue in the Last 7 Days' from Solana Hub, ranking Solana ($19.2M), Ethereum ($9.27M), Hyperliquid ($8.01M), Polygon ($6.12M), Robinhood Chain ($4.21M), Base ($3.12M), ADI ($2.72M), BSC ($2.21M), Arbitrum ($605K), and ZKsync Era ($465K).

AI visual analysis: Infographic titled 'Top chains by App Revenue in the Last 7 Days' from Solana Hub, ranking Solana ($19.2M), Ethereum ($9.27M), Hyperliquid ($8.01M), Polygon ($6.12M), Robinhood Chain ($4.21M), Base ($3.12M), ADI ($2.72M), BSC ($2.21M), Arbitrum ($605K), and ZKsync Era ($465K).

福禄寿 UV DAO @FLS_OTC · 2026-07-25T08:32:21+00:00

BNB's listing on Futu NiuNiu is more than just adding another market data access point; it represents a further step into the asset view of traditional financial investors. As more and more brokers begin to display, research, and even support crypto assets, BNB, as one of the

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

六子|Funny Six @0x_SixxxVC · 2026-07-25T03:25:42+00:00

Over the past 24 hours, Robinhood Chain's spot DEX trading volume reached $373 million, ranking third among EVM-compatible chains (BNB $1.3 billion, ETH $609 million, Base $90 million). As the on-chain leader, $cashcat has a market cap of only $50 million. With such high trading

A bar chart displays the spot DEX trading volume across various EVM chains from June 15 to July 10, with a tooltip showing data for July 24, 2026, where Robinhood leads at $373.7m (3/49), behind BNB ($1.3b) and Ethereum ($609.4m), illustrating the post's claim about Robinhood Chain's strong third-place ranking in daily volume.

AI visual analysis: A bar chart displays the spot DEX trading volume across various EVM chains from June 15 to July 10, with a tooltip showing data for July 24, 2026, where Robinhood leads at $373.7m (3/49), behind BNB ($1.3b) and Ethereum ($609.4m), illustrating the post's claim about Robinhood Chain's strong third-place ranking in daily volume.

Mars @mars_bnb · 2026-07-25T09:53:11+00:00

I saw they said Futu has launched $BNB, but why can't I find it? Is this thing restricting mainland users?

A Chinese cryptocurrency app search results screen for 'BNB' displaying tickers like BNBX, PBI, ABNB, QBNB, HBNB, XBNB, VBNB, and ABNB (Airbnb Inc) with a 'no more results' notice at the bottom.

AI visual analysis: A Chinese cryptocurrency app search results screen for 'BNB' displaying tickers like BNBX, PBI, ABNB, QBNB, HBNB, XBNB, VBNB, and ABNB (Airbnb Inc) with a 'no more results' notice at the bottom.

Crypto De Nostradame @DeNostradameX · 2026-07-25T17:51:41+00:00

Hello everyone, friends. Binance TR has once again made headlines in a great field. They've announced they'll be supporting MACTeam Runners, one of Turkey's largest running communities, throughout the year. MACTeam Runners is now running under its renewed name, that is,

A promotional banner for 'MACTeam Runners Powered by Binance TR' features statistics of '10.000+ Koşucu', '50+ Etkinlik', and 'Yıl Boyu Destek', alongside a photo of a man in a cap and the tagline 'Spor disiplini ve finansal disiplin aynı yolda buluşuyor.'

AI visual analysis: A promotional banner for 'MACTeam Runners Powered by Binance TR' features statistics of '10.000+ Koşucu', '50+ Etkinlik', and 'Yıl Boyu Destek', alongside a photo of a man in a cap and the tagline 'Spor disiplini ve finansal disiplin aynı yolda buluşuyor.'

Hood House @hood__house · 2026-07-25T18:55:44+00:00

$HOOD TOP NET FLOWS LAST MONTH: +$2.2 billion to Hyperliquid +$200 million to Robinhood Chain +$160 million to Ethereum to +$100 million to OP Mainnet NEGATIVE FLOWS TO EVERYTHING ELSE Solana, Base, Polygon, BNB

A bar chart titled "Top Net Flows: Bridged asset net flows in USD" shows Hyperliquid leading with approximately +$2.2B in inflows, followed by smaller positive flows to Robinhood Chain, Ethereum, and OP Mainnet, while Arbitrum experiences the largest outflow at roughly -$2.5B, with most other chains (Solana, Base, Polygon PoS, BNB Chain, Ink, Unichain, Starknet, zkSync Era, edgeX, Avalanche C-Chain) showing minor negative flows, visually confirming the post's summary of capital concentrating into Hyperliquid while draining from major chains like Solana, Base, and Polygon.

AI visual analysis: A bar chart titled "Top Net Flows: Bridged asset net flows in USD" shows Hyperliquid leading with approximately +$2.2B in inflows, followed by smaller positive flows to Robinhood Chain, Ethereum, and OP Mainnet, while Arbitrum experiences the largest outflow at roughly -$2.5B, with most other chains (Solana, Base, Polygon PoS, BNB Chain, Ink, Unichain, Starknet, zkSync Era, edgeX, Avalanche C-Chain) showing minor negative flows, visually confirming the post's summary of capital concentrating into Hyperliquid while draining from major chains like Solana, Base, and Polygon.

yourfriendSOMMI @yourfriendSOMMI · 2026-07-25T04:42:14+00:00

Interesting post by Habibi. Phantom hates Binance $BNB chain

A screenshot of a tweet by Habibi joking about Phantom wallet's lack of BSC support, showing a screenshot of Phantom's network selection menu which lists Solana, Ethereum, Bitcoin, Monad, Base, Sui, Polygon, HyperEVM Lite, and Robinhood Chain, but notably omits BNB Chain, with BNB price shown at $564.65 (-0.50%). The post humorously highlights how Phantom, despite supporting various EVM chains, has never added BSC support.

AI visual analysis: A screenshot of a tweet by Habibi joking about Phantom wallet's lack of BSC support, showing a screenshot of Phantom's network selection menu which lists Solana, Ethereum, Bitcoin, Monad, Base, Sui, Polygon, HyperEVM Lite, and Robinhood Chain, but notably omits BNB Chain, with BNB price shown at $564.65 (-0.50%). The post humorously highlights how Phantom, despite supporting various EVM chains, has never added BSC support.

小汉堡 @CheesyBun0211 · 2026-07-25T06:46:05+00:00

Binance @binancezh 's leadership is written into every percentage point Total share 35.34% (5.85 trillion), spot 32.26%, derivatives 36.48%, TradFi 60%... @cz_binance @heyibinance

A Chinese cryptocurrency market report titled '2026年Q2 加密交易报告核心数据总览' from TokenInsight, featuring charts of total trading volume, Binance's 35.34% market share, and rankings of exchanges like OKX, Bybit, and Gate.

AI visual analysis: A Chinese cryptocurrency market report titled '2026年Q2 加密交易报告核心数据总览' from TokenInsight, featuring charts of total trading volume, Binance's 35.34% market share, and rankings of exchanges like OKX, Bybit, and Gate.

币圈老司机 @Bqlsj2023 · 2026-07-25T14:44:54+00:00

Unitree Robotics founder lands on TIME magazine cover The last one to grace TIME magazine was Baidu's Robin Li I've always thought rankings and magazine covers are a total money pit If CZ hadn't made Forbes, he wouldn't have had to pay that protection fee Besides, Unitree

The image is the August 17, 2026 cover of TIME magazine featuring Unitree Robotics founder Wang Xingxing standing beneath his company's large humanoid robot, with the headline "THE BIG ROBOT MOMENT" and the subtitle noting he wants to bring his 9-foot creation to the public. The cover relates to the post by highlighting Unitree's founder's achievement as only the second Chinese tech figure (after Baidu's Robin Li) to grace TIME's cover, illustrating the company's growing global prominence in robotics.

AI visual analysis: The image is the August 17, 2026 cover of TIME magazine featuring Unitree Robotics founder Wang Xingxing standing beneath his company's large humanoid robot, with the headline "THE BIG ROBOT MOMENT" and the subtitle noting he wants to bring his 9-foot creation to the public. The cover relates to the post by highlighting Unitree's founder's achievement as only the second Chinese tech figure (after Baidu's Robin Li) to grace TIME's cover, illustrating the company's growing global prominence in robotics.

Chartist | Süleyman @shillcoin58 · 2026-07-25T10:58:25+00:00

THIS ISN'T JUST A SPONSORSHIP. Discipline through sports, vision through community, a long-term perspective through crypto —there's a step that brings them together on the same ground... MACTeam Runners is now running with the "Powered by Binance TR" identity. One of

A runner checks their phone displaying "MACTeam Runners Powered by Binance TR," reinforcing the post's announcement of their partnership. The phone's display and the "Binance TR" logo on the runner's shirt highlight the crypto-powered sponsorship.

AI visual analysis: A runner checks their phone displaying "MACTeam Runners Powered by Binance TR," reinforcing the post's announcement of their partnership. The phone's display and the "Binance TR" logo on the runner's shirt highlight the crypto-powered sponsorship.

Harry @HarrySnipes · 2026-07-25T04:23:00+00:00

Bought a small bag in $HEYI 200k mcap on bnb 0x991035c1f2e0ef75831c78b184958cb9b9da4444

A 3D-rendered cartoon cow character wearing an ornate gold crown with red gems, pink snout, long black hair, and a ruby pendant necklace is displayed against a solid yellow background, serving as a mascot for the $HEYI token on BNB at contract address 0x991035c1f2e0ef75831c78b184958cb9b9da4444 with a 200k market cap.

AI visual analysis: A 3D-rendered cartoon cow character wearing an ornate gold crown with red gems, pink snout, long black hair, and a ruby pendant necklace is displayed against a solid yellow background, serving as a mascot for the $HEYI token on BNB at contract address 0x991035c1f2e0ef75831c78b184958cb9b9da4444 with a 200k market cap.

Kylobayd @kylobtc · 2026-07-25T08:08:00+00:00

Solana just led every blockchain in 24h DEX volume $1.5B traded in a single day More than $ETH More than $BNB More than Base More than Robinhood Chain The funniest part is people still talk about $SOL like its just hype But the volume keeps saying something very different

A cryptocurrency ranking table titled 'DEX Volume 24h' lists Solana ($1.501b) at #1, followed by Ethereum, BSC, Base, and Robinhood Chain, with an '@kylobtc' profile image overlaid on the list.

AI visual analysis: A cryptocurrency ranking table titled 'DEX Volume 24h' lists Solana ($1.501b) at #1, followed by Ethereum, BSC, Base, and Robinhood Chain, with an '@kylobtc' profile image overlaid on the list.

0x江屿(金狗版) @Mintclub002 · 2026-07-25T12:28:53+00:00

What other reasons does BN have to play meme traffic attraction? Currently, for US stocks, prediction markets, the importance of compliance all outweigh memes. Better to see reality clearly sooner, don't hold onto hope, shift the focus to SOL, ROBINHOOD chain

Kripto Warrior @kriptowarrior · 2026-07-25T17:16:47+00:00

A very important security alert has come from Binance TR against the increasing scam attempts in recent times! You absolutely need to be careful against people who introduce themselves as Binance TR employees and call you. To protect your security, never forget the following

A Binance TR security alert infographic warns users about fraudulent phone calls from scammers impersonating Binance TR employees, emphasizing that the company will never request passwords, SMS/Google verification codes, or personal information. The image features a yellow warning triangle and phone icon, advising users to only contact Binance TR through the official app or website's live support channel for any suspicious situations.

AI visual analysis: A Binance TR security alert infographic warns users about fraudulent phone calls from scammers impersonating Binance TR employees, emphasizing that the company will never request passwords, SMS/Google verification codes, or personal information. The image features a yellow warning triangle and phone icon, advising users to only contact Binance TR through the official app or website's live support channel for any suspicious situations.

Omar @crypt_omar · 2026-07-25T06:16:20+00:00

Most of my time is spent on Robinhood (90%), Solana (9%), and BNB Chain (1%) lately. I was the only person to manage a 100m+ runner on @BNBCHAIN in 2023. Even though I've stepped away from it for now, it's good to see the artists and community still bag-working and keeping the

A 3D-rendered cartoon character with bull-like horns, a golden crown with red gems, long black hair, and a pink snout is set against a yellow background, symbolizing a "bullish" crypto queen or trader persona. The regal imagery aligns with the post's tone of dominance and accomplishment on platforms like Robinhood, Solana, and BNB Chain.

AI visual analysis: A 3D-rendered cartoon character with bull-like horns, a golden crown with red gems, long black hair, and a pink snout is set against a yellow background, symbolizing a "bullish" crypto queen or trader persona. The regal imagery aligns with the post's tone of dominance and accomplishment on platforms like Robinhood, Solana, and BNB Chain.

Ed_x區塊日記 @Ed_x0101 · 2026-07-25T20:06:59+00:00

I only bought one BNB worth of $Z Transferred it to the main Binance wallet account for safekeeping What is meant to be in one's fate will come eventually; no point checking anymore, keep pushing forward

A screenshot displaying a transaction summary in Chinese, showing a single purchase (買 × 1) totaling $562.8 for 1 BNB, acquiring 15.2M tokens at an average market value of $36.9K.

The image corresponds to the user's claim of buying $Z with just 1 BNB, illustrating the modest token acquisition (15.2M tokens) made with their small investment before transferring them to safekeeping.

AI visual analysis: A screenshot displaying a transaction summary in Chinese, showing a single purchase (買 × 1) totaling $562.8 for 1 BNB, acquiring 15.2M tokens at an average market value of $36.9K. The image corresponds to the user's claim of buying $Z with just 1 BNB, illustrating the modest token acquisition (15.2M tokens) made with their small investment before transferring them to safekeeping.

K线教主(网络喷子版) @Paris13Jeanne · 2026-07-25T01:25:07+00:00

Congratulations to BNB for entering Futu's basket of currencies Binance's whole multi-compliance thing before was actually... Futu has always allowed buying crypto But the coins available before were very limited Only major ones like BTC, ETH, SOL, a few mainstream coins

An advertisement in Chinese from 富途牛牛 (Futu Niuniu) announcing that BNB trading is now open for PI clients, featuring Bitcoin and BNB coins.

AI visual analysis: An advertisement in Chinese from 富途牛牛 (Futu Niuniu) announcing that BNB trading is now open for PI clients, featuring Bitcoin and BNB coins.

Mr Raj @Rajveer84338199 · 2026-07-25T02:33:30+00:00

$67 is making another important move and this one is already getting noticed. SIXSEVEN has now officially launched on BNB Chain giving the project access to one of the biggest DeFi communities and making it easier for more users to join the ecosystem. The momentum is already

A promotional graphic announcing $67/SIXSEVEN's new all-time high following its official launch on BNB Chain, showing a meme character holding a die and the number 7. The infographic displays current metrics: $0.02 price, $19.93M market cap, $301.74K liquidity, $167.72K 24H volume, and 2.21K transactions, with a tag "NEW ATH. NEW CHAIN. BIGGER COMMUNITY."

AI visual analysis: A promotional graphic announcing $67/SIXSEVEN's new all-time high following its official launch on BNB Chain, showing a meme character holding a die and the number 7. The infographic displays current metrics: $0.02 price, $19.93M market cap, $301.74K liquidity, $167.72K 24H volume, and 2.21K transactions, with a tag "NEW ATH. NEW CHAIN. BIGGER COMMUNITY."

Hinata @Hinata_BNB · 2026-07-25T06:50:12+00:00

Imagine @heyibinance changing her PFP the same way @cz_binance did for $Mubarak, which went on to reach a $200M+ market cap. Why couldn’t the Meme Queen create the next massive BSC meme narrative?

A stylized cartoon cow wearing an ornate gold crown and a ruby pendant necklace is set against a bright yellow background. The image humorously suggests that Binance's official account ("heyibinance") could adopt a similar queenly persona to spark the next big meme coin narrative on BSC, much like CZ's viral $Mubarak profile change.

AI visual analysis: A stylized cartoon cow wearing an ornate gold crown and a ruby pendant necklace is set against a bright yellow background. The image humorously suggests that Binance's official account ("heyibinance") could adopt a similar queenly persona to spark the next big meme coin narrative on BSC, much like CZ's viral $Mubarak profile change.

Binance India @BinanceForIN · 2026-07-25T04:40:00+00:00

GM Development always advances in a spiral upward or in waves! Stay the course

A spiral staircase viewed from above, bathed in warm yellow light, perfectly visualizing the metaphor of progress moving in an upward spiral. Its continuous, winding steps echo the idea that growth and development advance in waves, reinforcing the message of perseverance and forward momentum.

AI visual analysis: A spiral staircase viewed from above, bathed in warm yellow light, perfectly visualizing the metaphor of progress moving in an upward spiral. Its continuous, winding steps echo the idea that growth and development advance in waves, reinforcing the message of perseverance and forward momentum.

TOSA inu @TOSAinuBNB · 2026-07-25T09:20:39+00:00

They didn't just breed a dog; they forged a four-legged Shogun. The $Tosa Inu is what happens when raw power meets absolute silence. No empty barking, just heavy steps and unmatched loyalty. The ultimate flex isn't a supercar, it's walking with a living legend.

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

me_cool_off @me_cool_off · 2026-07-25T14:47:29+00:00

This guy beat Polymarket, turning $15,000 into $917,893 in just 1 day and 24 trades. His wallet: polymarket.com/0x75973c667cec … He manipulated 5-minute BNB markets by moving the BNB spot price on Binance. The scheme was simple: > market settlement depended on the BNB spot price >

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

熊什么猫 @0xPandaWhat · 2026-07-25T06:12:16+00:00

#BNB has launched on Futu NiuNiu. Hong Kong's first licensed brokerage has opened binancecoin:native order book trading, currently only available to eligible professional investors in Hong Kong. I think the key point here is that it provides an additional legitimate channel

A Futu NiuNiu promotional banner announcing that BNB (Binance Coin) trading is now open to PI (Professional Investor) clients, featuring Bitcoin and BNB coin graphics alongside the tagline "買Crypto用富途 安全·持牌" (Buy Crypto with Futu - Safe, Licensed). The image directly supports the post by highlighting Futu NiuNiu's launch of BNB trading for Hong Kong's licensed brokerage clients, emphasizing its secure and regulated status.

AI visual analysis: A Futu NiuNiu promotional banner announcing that BNB (Binance Coin) trading is now open to PI (Professional Investor) clients, featuring Bitcoin and BNB coin graphics alongside the tagline "買Crypto用富途 安全·持牌" (Buy Crypto with Futu - Safe, Licensed). The image directly supports the post by highlighting Futu NiuNiu's launch of BNB trading for Hong Kong's licensed brokerage clients, emphasizing its secure and regulated status.

比特欧 Elvin @DRbitcoin36 · 2026-07-25T07:16:09+00:00

Wow! Finally, finally, it's Bitou's turn! Actually, Bitou didn't receive much merchandise because overseas shipping is quite troublesome for project teams and exchanges, and I didn't want to trouble others either. But Binance merchandise can even be shipped to Malaysia, the

A yellow Binance-branded tennis racket and tennis balls are displayed in a black case with the Binance logo in the background.

AI visual analysis: A yellow Binance-branded tennis racket and tennis balls are displayed in a black case with the Binance logo in the background.

Brian Sumner @xBrianSumner · 2026-07-25T12:41:39+00:00

Rewarding creative minds on @BNBCHAIN

Promotional banner for the 'MAME CREATIVE CHALLENGE' featuring a cartoon Shiba Inu dog with creative icons (camera, paintbrush, music note) emerging from its head, advertising 50 winners at $200 each, a $10,000 prize pool, with a deadline of 3 August 14:00 UTC and the theme 'MAME ON BNB CHAIN'.

AI visual analysis: Promotional banner for the 'MAME CREATIVE CHALLENGE' featuring a cartoon Shiba Inu dog with creative icons (camera, paintbrush, music note) emerging from its head, advertising 50 winners at $200 each, a $10,000 prize pool, with a deadline of 3 August 14:00 UTC and the theme 'MAME ON BNB CHAIN'.

Dogeshi Kun @DogeshiKun · 2026-07-25T13:56:10+00:00

Honestly, the $Hachiko dev did something that had never been done before on #BNB Chain. He started building a real loyalty movement around a world-famous dog with a true story that people can genuinely embrace as a culture in crypto community. Today, Brian aped into Hachiko

lvnbbs_bnb @lvn_crypto · 2026-07-25T05:24:33+00:00

RWA is truly exploding. From nearly nothing in 2023 → surpassing $35B by mid-2026. US Treasury is leading, followed by Commodities, Private Equity, Real Estate… everything’s racing ahead. On-chain RWA is no longer just a narrative; it’s becoming a real asset class.

This image shows a stacked area chart from rwa.xyz titled "Total RWA Value," tracking the growth of tokenized Real World Assets (RWA) from September 2023 through mid-2026, rising from near $0 to over $35B, with US Treasury Debt (dark blue) as the largest category, followed by Commodities (yellow/gold), Private Equity, Real Estate, and other asset classes like Corporate Credit, Asset-Backed Credit, and Venture Capital — visually confirming the post's claim that on-chain RWA has rapidly evolved from a niche narrative into a multi-billion-dollar asset class.

AI visual analysis: This image shows a stacked area chart from rwa.xyz titled "Total RWA Value," tracking the growth of tokenized Real World Assets (RWA) from September 2023 through mid-2026, rising from near $0 to over $35B, with US Treasury Debt (dark blue) as the largest category, followed by Commodities (yellow/gold), Private Equity, Real Estate, and other asset classes like Corporate Credit, Asset-Backed Credit, and Venture Capital — visually confirming the post's claim that on-chain RWA has rapidly evolved from a niche narrative into a multi-billion-dollar asset class.

DONG @DongBnb · 2026-07-25T07:08:08+00:00

they told me this was the next 4. it’d be worth hundreds of millions. now give me my fucking money back.

A screenshot of a meme crypto token "VLAD" (Vladhood) priced at $0.0005628 with only $81K liquidity and a $562K market cap. The image highlights the token's poor performance and low value, reinforcing the poster's complaint about being scammed by a hyped project that failed to deliver the promised returns.

AI visual analysis: A screenshot of a meme crypto token "VLAD" (Vladhood) priced at $0.0005628 with only $81K liquidity and a $562K market cap. The image highlights the token's poor performance and low value, reinforcing the poster's complaint about being scammed by a hyped project that failed to deliver the promised returns.

HexVanilla @hex_vanilla · 2026-07-25T15:56:34+00:00

5 years ago, I made the first meme for Binance's co-founders @cz_binance (CZ Bull). Today, I just made the second meme for Binance's co-founder @heyibinance (Meme Queen). I remember back in the day when I posted CZ Bull, Binance and CZ both started following me and CZ even

A stylized 3D cartoon character with a cow/buffalo-like appearance—featuring blue-gray skin, large horns, long black hair, and a pink muzzle—wears an ornate golden crown adorned with red jewels, along with gold earrings and a black beaded necklace with a red teardrop pendant, set against a bright yellow background, representing "Yi He (Meme Queen)," the co-founder of Binance, as a royal counterpart to the earlier "CZ Bull" meme.

AI visual analysis: A stylized 3D cartoon character with a cow/buffalo-like appearance—featuring blue-gray skin, large horns, long black hair, and a pink muzzle—wears an ornate golden crown adorned with red jewels, along with gold earrings and a black beaded necklace with a red teardrop pendant, set against a bright yellow background, representing "Yi He (Meme Queen)," the co-founder of Binance, as a royal counterpart to the earlier "CZ Bull" meme.

Thành Phan @bachkhoabnb · 2026-07-25T12:12:48+00:00

I share the same viewpoint as anh Tê I hope #Binance soon becomes the official partner in our country's digital market Cooperation and promotion activities in Vietnam - Signing memoranda of understanding (MOU) - Exchanging legal frameworks - Recruiting senior personnel With

A hand holds a yellow smiling plush toy keychain with black limbs in front of an illuminated RGB mechanical keyboard on a wooden desk, with a small plant visible in the lower left.

AI visual analysis: A hand holds a yellow smiling plush toy keychain with black limbs in front of an illuminated RGB mechanical keyboard on a wooden desk, with a small plant visible in the lower left.

Parlex the dev @parlex_exe · 2026-07-25T14:38:42+00:00

HOW ONE TRADER TURNED A $200 INTO $900,000 ON POLYMARKET. At first glance, it looked impossible. One wallet appeared out of nowhere. And started trading BNB Up/Down markets... 24 trades. Almost 100% Win Rate. But in fact HE SCAMMED the whole platform. So what actually

WiseInvest @WiseInvest513 · 2026-07-25T15:23:35+00:00

As it stands now, the return rates of many US stock products have already fallen short of crypto products... Seeing that binancecoin:native has been listed on Tiger Brokers, meaning you can now buy BNB through a traditional brokerage—this is absolutely a bullish signal.

A Chinese-language trading post from "WiseInvest" discussing Micron ($MU) at $927.01 and WBTC at $63,966.19, with the highlighted section noting the user's positions in $BTC, Ethereum (via $BNB native), and $BNB around the 500 range, targeting 1500.

AI visual analysis: A Chinese-language trading post from "WiseInvest" discussing Micron ($MU) at $927.01 and WBTC at $63,966.19, with the highlighted section noting the user's positions in $BTC, Ethereum (via $BNB native), and $BNB around the 500 range, targeting 1500.

Crypto Revolution Masters @revolut20 · 2026-07-25T04:56:10+00:00

GM degens, I remember those days stuck in the 9-5 I hated, grinding pixels in Warzone, feeling like I was wasting my life. Then I said fuck it — locked in, studied charts till my eyes hurt, took the big swings on BNB, Solana, got wrecked a few times but kept diamond handing

ErkanG @_ErkanG · 2026-07-25T14:43:23+00:00

Turkey's largest running community MACTeam Runners will receive support from @BinanceTR for 1 year The biggest connection between running and finance might be discipline, patience, and consistency. The MACTeam Runners Powered by Binance TR collaboration will serve as a

The image is a promotional banner featuring the Binance TR and MAC Team Runners logos, alongside text in Turkish announcing that "MAC Team Runners artık 'Powered by Binance TR' kimliğiyle koşuyor" (MAC Team Runners now runs under the "Powered by Binance TR" identity). The background shows runners crossing a bridge at sunrise, visually reinforcing the post's message about the partnership between Turkey's largest running community and Binance TR, emphasizing shared values like discipline and consistency.

AI visual analysis: The image is a promotional banner featuring the Binance TR and MAC Team Runners logos, alongside text in Turkish announcing that "MAC Team Runners artık 'Powered by Binance TR' kimliğiyle koşuyor" (MAC Team Runners now runs under the "Powered by Binance TR" identity). The background shows runners crossing a bridge at sunrise, visually reinforcing the post's message about the partnership between Turkey's largest running community and Binance TR, emphasizing shared values like discipline and consistency.

Leo_Bobber @Leo_Bobber · 2026-07-25T18:35:18+00:00

Meme culture was never dead it was waiting to be rewoven For the #MAMECreativeChallenge , I created this handmade string art piece inspired by MAME on BNB Chain. #SaveMemeCulture Thread by thread, I turned simple lines into a symbol of community, creativity, and the spirit of

A piece of string art depicting a black cat's face with the name "MAME" on an embroidery hoop displayed on a small easel.

AI visual analysis: A piece of string art depicting a black cat's face with the name "MAME" on an embroidery hoop displayed on a small easel.

AiDove @Aidovecoin · 2026-07-25T06:58:28+00:00

BNB is Vault AiDove is Gold

A duck character in a blue hoodie and sneakers enthusiastically opens a massive vault door, revealing a glowing golden light inside. The Binance logo on the wall and the caption's reference to "BNB is Vault" reinforce the image's theme of BNB (Binance Coin) as a securely stored, valuable digital asset.

AI visual analysis: A duck character in a blue hoodie and sneakers enthusiastically opens a massive vault door, revealing a glowing golden light inside. The Binance logo on the wall and the caption's reference to "BNB is Vault" reinforce the image's theme of BNB (Binance Coin) as a securely stored, valuable digital asset.

KrypToon @Kryp_Toon · 2026-07-25T17:00:01+00:00

Good Night In a market where trust is often shaped by launch fairness and contract transparency, YFSX VIN gives several points that stand out: • Open-source ecosystem • Built on Binance Smart Chain • No private sale • No pre-mine • No backend control • Renounced

A promotional graphic for YFSX/VIN, an open-source dual-token DeFi ecosystem on BSC, featuring a blue wolf mascot, the tagline 'Transparent. Open. Verifiable,' and a ledger display showing transaction details.

AI visual analysis: A promotional graphic for YFSX/VIN, an open-source dual-token DeFi ecosystem on BSC, featuring a blue wolf mascot, the tagline 'Transparent. Open. Verifiable,' and a ledger display showing transaction details.

Sixpence @SixpenceAI · 2026-07-25T02:13:00+00:00

$BNB Available as collateral on Sixpence sixpence.xyz/lend

李呆妹 @LiDaimei_ · 2026-07-25T13:36:22+00:00

A contract opened at 10 bucks, held it for two years, finally couldn't hold on and got liquidated.... Opened at 10 bucks, stubbornly endured a 6000-buck loss... Besides mainstream coins like BTC, ETH, SOL, BNB, I'll never touch altcoins again. This time, I really

The image shows a Binance trading history record for a COREUSDT perpetual contract, showing a devastating liquidation: opened at 0.115 on 2024/07/05, liquidated at 0.0152 on 2026/07/24, resulting in a realized loss of -5,971.81 USDT (-1,397.46%) despite using 20x leverage. This visually corresponds to the post, illustrating how the trader held a long position for two years and ultimately got liquidated after a 6,000+ USDT loss—prompting their vow to avoid altcoins and stick only to BTC, ETH, SOL, and BNB.

AI visual analysis: The image shows a Binance trading history record for a COREUSDT perpetual contract, showing a devastating liquidation: opened at 0.115 on 2024/07/05, liquidated at 0.0152 on 2026/07/24, resulting in a realized loss of -5,971.81 USDT (-1,397.46%) despite using 20x leverage. This visually corresponds to the post, illustrating how the trader held a long position for two years and ultimately got liquidated after a 6,000+ USDT loss—prompting their vow to avoid altcoins and stick only to BTC, ETH, SOL, and BNB.

小龙先生 @Dragonhau66 · 2026-07-25T02:34:26+00:00

Futu NiuNiu Goes Live with BNB Coin Trading: What's the Big Play in the Next Step? That Futu NiuNiu, which was once fined 1.85 billion RMB by the China Securities Regulatory Commission, is about to launch BNB coin trading. I'm really curious what a traditional brokerage

The image shows the logo of "富途牛牛" (Futubull) with "BNB" prominently displayed, indicating that they are now offering BNB coin trading to PI customers. This aligns with the post discussing Futubull's move into cryptocurrency trading after a fine from the China Securities Regulatory Commission.

AI visual analysis: The image shows the logo of "富途牛牛" (Futubull) with "BNB" prominently displayed, indicating that they are now offering BNB coin trading to PI customers. This aligns with the post discussing Futubull's move into cryptocurrency trading after a fine from the China Securities Regulatory Commission.

TOSA inu @TOSAinuBNB · 2026-07-25T14:22:41+00:00

While the market sleeps, $TOSA cooks. Supply melting, momentum surging, and the chart is primed for total ignition. This isn't just another run—it’s a complete takeover. Don't watch from the sidelines. $TOSA / $BNB #BNBchain

A regal dog wearing a crown and ornate robe stands atop a platform inscribed "TOSA ALPHA EMPIRE," surrounded by golden industrial gears and a Greek temple backdrop, symbolizing the "cooking" and dominance of $TOSA on the BNB chain. The imperial imagery and molten machinery reflect the post's theme of supply melting and $TOSA's impending market takeover.

AI visual analysis: A regal dog wearing a crown and ornate robe stands atop a platform inscribed "TOSA ALPHA EMPIRE," surrounded by golden industrial gears and a Greek temple backdrop, symbolizing the "cooking" and dominance of $TOSA on the BNB chain. The imperial imagery and molten machinery reflect the post's theme of supply melting and $TOSA's impending market takeover.

Alexander @aale_xander · 2026-07-25T11:02:15+00:00

Ooh @cz_binance needs to see this TartSwap’s OTC (Over-The-Counter) feature enables large-block token trades on #BNB Chain with zero slippage and no counterparty risk. Instead of selling big amounts on an AMM (which causes price impact), users set a fixed price and settle

The image is a promotional graphic for TartSwap's OTC Desk on BNB Chain, featuring the headline "Swap size. Zero slippage." alongside a screenshot of the tartswap.com/otc interface displaying four large-block token swap listings, including 800 μUSDT for 0.04 tBNB, 2,500 μUSDT for 0.12 tBNB, 49,889 tCREPE for 0.045000 tBNB, and 39,889 tKOMA for 119.647 μUSDT, with the verified smart contract address 0x2266...6AdD visible at the bottom.

AI visual analysis: The image is a promotional graphic for TartSwap's OTC Desk on BNB Chain, featuring the headline "Swap size. Zero slippage." alongside a screenshot of the tartswap.com/otc interface displaying four large-block token swap listings, including 800 μUSDT for 0.04 tBNB, 2,500 μUSDT for 0.12 tBNB, 49,889 tCREPE for 0.045000 tBNB, and 39,889 tKOMA for 119.647 μUSDT, with the verified smart contract address 0x2266...6AdD visible at the bottom.

IKARU @APEXIKARU · 2026-07-25T07:06:52+00:00

Been testing a lot of bridges lately and @Allbridge_io Next just feels different. Native stablecoins + gas tokens, any major chain pair (ETH, Solana, Tron, Base, Sui, BNB…), fees that are actually predictable (~0.1%), and transfers that finish in under 30 seconds even when

An 'Ambassadors Wave 2' promotional graphic for Allbridge Next featuring a golden trophy and reward balances of 2,000 BNB and 1,998.34 USDT.

AI visual analysis: An 'Ambassadors Wave 2' promotional graphic for Allbridge Next featuring a golden trophy and reward balances of 2,000 BNB and 1,998.34 USDT.

Greenpeace.BNB.probablynothing.LUNC @Greenpeace06_09 · 2026-07-25T18:22:24+00:00

This guy is a fraud. In 2022, I took time to help educate him SOME on the wallets. In return, he dm me out of nowhere telling me to kill myself because it would make this world a better place. He is best friends with scammers lunanauts and classic nodes. He is 100 percent

A Twitter/X profile page for 'Master in LUNC' (@Masterincryptoo), with the bio 'Lunc and only Lunc. Part of the new payment era', showing they joined August 2022, follow 28 accounts, and have 565 followers.

AI visual analysis: A Twitter/X profile page for 'Master in LUNC' (@Masterincryptoo), with the bio 'Lunc and only Lunc. Part of the new payment era', showing they joined August 2022, follow 28 accounts, and have 565 followers.

BUTCHER @easyeight08 · 2026-07-25T10:24:19+00:00

#BINANCE IS DUMPING STOCKS LOL

The image shows a list of stocks on Binance's bStocks platform with significant negative 24-hour price changes (e.g., INTWB/USDT at -23.79%), correlating with the post's claim that "BINANCE IS DUMPING STOCKS LOL."

AI visual analysis: The image shows a list of stocks on Binance's bStocks platform with significant negative 24-hour price changes (e.g., INTWB/USDT at -23.79%), correlating with the post's claim that "BINANCE IS DUMPING STOCKS LOL."

KΔℝΪℕℕΔ ₿ @CRyptOracl3 · 2026-07-25T10:56:01+00:00

Maybe I'm the only one who thinks that $TUT >> $BNB $REDO >> $GRAM $BOBA >> $ETH (BobaCat) can reach new heights! So be it...ill wait!!

A digital composite shows a gray cat's head superimposed on a sharply dressed figure in a black velvet suit, gold chains, rings, and a luxury watch, seated on a cream couch surrounded by suited onlookers—evoking the confident, flamboyant "boss" persona of a crypto trader. The image ties directly to the post's bullish stance on tokens like $TUT, $BNB, $REDO, $GRAM, $BOBA, and $ETH, positioning the cat as the dapper mastermind waiting for his coins to "reach new heights."

AI visual analysis: A digital composite shows a gray cat's head superimposed on a sharply dressed figure in a black velvet suit, gold chains, rings, and a luxury watch, seated on a cream couch surrounded by suited onlookers—evoking the confident, flamboyant "boss" persona of a crypto trader. The image ties directly to the post's bullish stance on tokens like $TUT, $BNB, $REDO, $GRAM, $BOBA, and $ETH, positioning the cat as the dapper mastermind waiting for his coins to "reach new heights."

lvnbbs_bnb @lvn_crypto · 2026-07-25T01:10:26+00:00

The weekend is here again! Hello everyone! Wishing all you folks a joyful new day, full of energy Let's climb up the ranks together on X!

A stylized digital illustration of a rocket launching over a cityscape at sunset, overlaid with a green financial candlestick chart trending upwards and an X logo.

AI visual analysis: A stylized digital illustration of a rocket launching over a cityscape at sunset, overlaid with a green financial candlestick chart trending upwards and an X logo.

HiSeven| @hisevenih · 2026-07-25T01:12:00+00:00

The most easily underestimated problem in the multi-chain era isn't that trading is difficult, but that you're increasingly unable to see your own positions clearly. BNB Chain holds spot assets, Solana chases hot trends, Hyperliquid has open perps, and Ethereum still has yield

A promotional graphic for a crypto platform called 'Velvet', displaying Chinese text '多链交易的全局视野' and showing a dashboard with BNB Chain, Ethereum, Solana, and Hyperliquid assets.

AI visual analysis: A promotional graphic for a crypto platform called 'Velvet', displaying Chinese text '多链交易的全局视野' and showing a dashboard with BNB Chain, Ethereum, Solana, and Hyperliquid assets.

Binance India @BinanceForIN · 2026-07-25T18:00:00+00:00

Sweet dreams

A wooden ladder ascends to the moon against a bright yellow sky. This imagery connects to "sweet dreams" by suggesting reaching for the moon, often a metaphor for ambitious aspirations or wishes.

AI visual analysis: A wooden ladder ascends to the moon against a bright yellow sky. This imagery connects to "sweet dreams" by suggesting reaching for the moon, often a metaphor for ambitious aspirations or wishes.

Tcalledpresence @Tcalledpresence · 2026-07-25T03:28:43+00:00

I love Robinhood because it’s made me a lot of money. But I’m convinced that right now, across Solana, Robinhood, BNB Chain, and Base, it’s becoming very difficult to find anything with another 50x potential. Most of the market has already run up significantly, and we’re now in

Crypto_君少 @JunShao_666 · 2026-07-25T06:54:32+00:00

Adding tokens while reducing WBNB = Someone is selling tokens for WBNB Chips highly concentrated, top100 close to 99.5%, single address close to 37% + high-turnover coin, just don't play spot anymore! $BANK is probably done with this one shot and calling it quits! Why do I

A mobile screenshot of the BANK token's liquidity tracker on DexScreener, showing a total liquidity of $13.82万 (about $138,200) and DeFi yield of 162.8% APY, with recent trades highlighted in red showing WBNB decreases and BANK token increases. A fire-emoji Chinese caption overlays the trades stating "项目方可能在掏池子" (The project team may be draining the pool), illustrating the accompanying post's warning that someone is selling BANK tokens for WBNB amid extremely concentrated holdings (top 100 wallets near 99.5%, one address holding ~37%).

AI visual analysis: A mobile screenshot of the BANK token's liquidity tracker on DexScreener, showing a total liquidity of $13.82万 (about $138,200) and DeFi yield of 162.8% APY, with recent trades highlighted in red showing WBNB decreases and BANK token increases. A fire-emoji Chinese caption overlays the trades stating "项目方可能在掏池子" (The project team may be draining the pool), illustrating the accompanying post's warning that someone is selling BANK tokens for WBNB amid extremely concentrated holdings (top 100 wallets near 99.5%, one address holding ~37%).

Kripto Gündemi @kriptogundemi · 2026-07-25T16:29:27+00:00

BinanceTR isn't letting users have an empty summer. Beautiful events continue to arrive. Friends who are new members will earn a reward worth 1,150₺ TL the first time they make a crypto purchase. If you already have an existing membership and haven't bought any crypto assets

PancakeSwap @PancakeSwap · 2026-07-25T13:01:34+00:00

building on bnb chain every night

Joshuwa Roomsburg @Joshuwa · 2026-07-25T17:00:36+00:00

Sub-second finality tests $BNB 's edge. BNB Chain says its engineering work cut BSC finality from 45 seconds. That's not hype if it holds. Speed only matters when users show up.

Binance Pakistan @BinancePk · 2026-07-25T11:30:15+00:00

Describe 2026 in 3 words.

SaintLee (❖,❖) @SaintLee04 · 2026-07-25T12:59:15+00:00

Inspired by @MameBNB on @BNBCHAIN , I recreated MAME using real dragon fruit seeds. Not digital. Not AI. Just patience, creativity, and a love for meme culture. Every seed was carefully placed by hand, turning a simple fruit into a tribute to the community that keeps MAME alive.

still @still_gm · 2026-07-25T02:16:52+00:00

You guys might not know yet, but the photo shows the office of Binance. In September 2017, China required all national cryptocurrency exchanges to stop accepting new users and completely cease domestic trading operations. This forced Binance to relocate to Tokyo. The office was

A man in a blue sweater and dark pants stands in an office using a laptop placed on a unique laptop stand shaped like a chair.

AI visual analysis: A man in a blue sweater and dark pants stands in an office using a laptop placed on a unique laptop stand shaped like a chair.

Piz @WhalePiz · 2026-07-25T08:30:00+00:00

Binance wants to participate in the International Financial Center in Vietnam. At the Vietnam RWA event, a Binance representative stated that they expect to become a part of the new financial ecosystem being built domestically. A notable signal as major crypto institutions

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

Ruslan Khairullin @Rus_Khairullin · 2026-07-25T14:59:16+00:00

Just wanna highlight these three positions ($BTC, $ETH , $BNB ) I opened publicly in longs (aside from BNB, grabbed that one overnight). Plus longs on $SOL , $HYPE , and $LIT . Targets are above.

The image shows a BingX trading chart for the ETHUSDT pair, displaying a last price of $1,861.64 (down 0.54% or $10.20), with a 24-hour high of $1,874.62 and low of $1,846.36 on a 1H timeframe showing recent downward price action. This relates to the post by highlighting one of the trader's publicly opened long positions on ETH, showing its current negative short-term performance as the price attempts to climb toward the mentioned upside targets.

AI visual analysis: The image shows a BingX trading chart for the ETHUSDT pair, displaying a last price of $1,861.64 (down 0.54% or $10.20), with a 24-hour high of $1,874.62 and low of $1,846.36 on a 1H timeframe showing recent downward price action. This relates to the post by highlighting one of the trader's publicly opened long positions on ETH, showing its current negative short-term performance as the price attempts to climb toward the mentioned upside targets.

0xskybb @Oxskybb · 2026-07-25T09:30:04+00:00

The physical collectibles track—many people are still fixated on unboxing and trading, but what's truly worth watching is the underlying infrastructure. In the absence of new narratives in Web3, tokenized collectibles are actually an undervalued category of real-world assets.

Renaiss Lab Tech Hackathon S1 Reward promotion featuring a total prize pool of $8,000+, with a Champion prize of $2,000 USDT and two Excellence Awards of $1,000 USDT each.

AI visual analysis: Renaiss Lab Tech Hackathon S1 Reward promotion featuring a total prize pool of $8,000+, with a Champion prize of $2,000 USDT and two Excellence Awards of $1,000 USDT each.

Algorithm.btc @godfred_xcuz · 2026-07-25T13:33:19+00:00

People want change, but don't want the change. There is a lot to unpack here in the wake of Binance's label on STX. I believe part of the Stacks Community lost the mission and the purpose of Stacks. Hear me out Stacks community! Stacks is on something unprecedentedly big that

The image displays a three-phase roadmap for Bitcoin Stacks, detailing Phase 1 (Anchor Capital) establishing self-custodial yield via L1 Bitcoin staking with a sustainable yield mechanism, Phase 2 (Scale Infrastructure) achieving 100x throughput through sBTC bridge optimization, and Phase 3 (Grow) expanding into Bitcoin-native Finance with lending and BTC AI Agents.

The image illustrates the broader ecosystem vision the post references—likely a Stacks community member's argument that despite labeling concerns around Binance and STX, the project is pursuing an unprecedented, multi-phase evolution from yield generation to native Bitcoin DeFi, suggesting critics should look past short-term exchange controversies and recognize the larger mission of integrating Bitcoin's capital, infrastructure, and finance layers.

AI visual analysis: The image displays a three-phase roadmap for Bitcoin Stacks, detailing Phase 1 (Anchor Capital) establishing self-custodial yield via L1 Bitcoin staking with a sustainable yield mechanism, Phase 2 (Scale Infrastructure) achieving 100x throughput through sBTC bridge optimization, and Phase 3 (Grow) expanding into Bitcoin-native Finance with lending and BTC AI Agents. The image illustrates the broader ecosystem vision the post references—likely a Stacks community member's argument that despite labeling concerns around Binance and STX, the project is pursuing an unprecedented, multi-phase evolution from yield generation to native Bitcoin DeFi, suggesting critics should look past short-term exchange controversies and recognize the larger mission of integrating Bitcoin's capital, infrastructure, and finance layers.

ZAYLIA GRACE @ZAYLIAGRACE · 2026-07-25T09:34:33+00:00

Thread (Topic 1 – Investing vs Trading) 1/ Most people think investing and trading are the same thing… They’re not. Both involve buying and selling assets, but the goals, time horizon, and risk look very different. Here’s a simple breakdown #Binance #BinanceAcademy

The image is an infographic titled "Investing vs Trading" that contrasts the two approaches: investing is described as "Long-term growth" with "Months to years" timeframe, "Lower activity," and "Hold through volatility," while trading focuses on "Short-term moves" with "Hours to days" timeframe, "Higher activity," and "Active risk management." A yellow banner at the bottom summarizes the key distinction: "Different goals • Different timeframes • Different risk," reinforcing the post's message about how investing and trading differ despite both involving buying and selling assets.

AI visual analysis: The image is an infographic titled "Investing vs Trading" that contrasts the two approaches: investing is described as "Long-term growth" with "Months to years" timeframe, "Lower activity," and "Hold through volatility," while trading focuses on "Short-term moves" with "Hours to days" timeframe, "Higher activity," and "Active risk management." A yellow banner at the bottom summarizes the key distinction: "Different goals • Different timeframes • Different risk," reinforcing the post's message about how investing and trading differ despite both involving buying and selling assets.

GM Wallet 华语 @GMWalletHK · 2026-07-25T03:59:58+00:00

Why are they all USDT, yet you can't just transfer them freely between each other? USDT can exist on different networks such as Ethereum, TRON, BNB Chain, Solana, and more. Although the name and value peg are the same, they are assets on different blockchains, with independent

Kim @moonkimbinance · 2026-07-25T05:08:47+00:00

TradFi and Crypto are accelerating their fusion. Futu's launch of BNB is yet another signal of this integration. Traditional finance gaining access to crypto assets means more traditional investors can now touch BNB. Binance uses Stocks, bStocks, and TradFi contracts to bring

A promotional banner for 富途牛牛 (Futubull) trading platform featuring 3D renderings of Bitcoin and BNB cryptocurrency coins with Chinese text 'BNB 已對PI客戶開放交易' (BNB now open for trading to PI clients).

AI visual analysis: A promotional banner for 富途牛牛 (Futubull) trading platform featuring 3D renderings of Bitcoin and BNB cryptocurrency coins with Chinese text 'BNB 已對PI客戶開放交易' (BNB now open for trading to PI clients).

Meeee @MeeMoses83411 · 2026-07-25T15:11:54+00:00

$67 just hit another milestone A new ATH is exciting But launching on BNB Chain might be the bigger story Until now, the ecosystem was mainly living on TON Now @sixsevenapp is opening the door to one of crypto’s largest DeFi ecosystems while keeping its Telegram-native

A smiling man wearing glasses and a dark polo shirt holds up both hands with all ten fingers extended, seemingly emphasizing a number like "10" or commenting on a milestone. The image's reference to "10" counters the post's mention of "$67" hitting a new ATH, celebrating the token's launch on BNB Chain as a major step beyond its Telegram/TON origins.

AI visual analysis: A smiling man wearing glasses and a dark polo shirt holds up both hands with all ten fingers extended, seemingly emphasizing a number like "10" or commenting on a milestone. The image's reference to "10" counters the post's mention of "$67" hitting a new ATH, celebrating the token's launch on BNB Chain as a major step beyond its Telegram/TON origins.

Thành Phan @bachkhoabnb · 2026-07-25T00:46:32+00:00

Continuing the perspective on RWA, bros.. Lately, if you pay a little attention, you'll notice that crypto exchanges have added a stock trading section.. gradually turning into a Super App for all markets But the question that arises is.. If you just tokenize a stock and let

A Vietnamese-language infographic titled 'Cách rToken truy cập thanh khoản NASDAQ / NYSE' showing a 6-step circular process around an RWA token, detailing how orders placed on Bitget are routed through licensed brokers to US markets.

AI visual analysis: A Vietnamese-language infographic titled 'Cách rToken truy cập thanh khoản NASDAQ / NYSE' showing a 6-step circular process around an RWA token, detailing how orders placed on Bitget are routed through licensed brokers to US markets.

Legacy On BNB @LegacyOnBNB · 2026-07-25T00:18:43+00:00

4 isn’t just a meme. It’s a symbol recognized across the entire crypto world. That’s what happens when the #BNB community creates culture.

A daily candlestick chart shows the "4/WBNB" trading pair at $8.30M with a 54,925.40 (+0.67%) price, with volume reaching 242.83M, illustrating strong market activity for the "4" token on the BNB chain that the post attributes to the BNB community's cultural momentum.

AI visual analysis: A daily candlestick chart shows the "4/WBNB" trading pair at $8.30M with a 54,925.40 (+0.67%) price, with volume reaching 242.83M, illustrating strong market activity for the "4" token on the BNB chain that the post attributes to the BNB community's cultural momentum.

Z3r0w @_Z3r0wTraders · 2026-07-25T19:59:40+00:00

Dear @cz_binance Over the past years Binance and you personally have shown more consistent support for the Terra Classic community than almost anyone else in the industry. I’m writing to share a new direction the community is beginning to explore the idea: Transform Terra

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

TOSA inu @TOSAinuBNB · 2026-07-25T18:36:39+00:00

A storm is brewing in the trenches. While the masses chase fleeting shadows, the $TOSA Inu pack is quietly claiming the absolute throne. Pure conviction. Unmatched energy. The true awakening starts right now. $TOSA / $BNB #BNBchain

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

C松-#BNB-#meme @CsongCap · 2026-07-25T02:09:10+00:00

BSC 官方发布 Gen Z 相关推文,链上催生对应主题 MEME 币种。 前提条件:叙事具备底层共鸣逻辑,Z 世代将成为市场核心群体,币圈大量资深参与者、新锐交易者均属于 Z 世代,拥有天然共识土壤。 Z 世代只是预热铺垫,市场所有情绪与资金,最终会汇集到 $CZ 主线。一旦引爆,BSC meme summer

A cartoon bull mascot wearing sunglasses and a black hoodie stands beside bold "CZ" lettering with the tagline "CRYPTO FOR GEN Z," visually promoting the $CZ token narrative tied to the BSC meme summer movement targeting Generation Z crypto traders.

AI visual analysis: A cartoon bull mascot wearing sunglasses and a black hoodie stands beside bold "CZ" lettering with the tagline "CRYPTO FOR GEN Z," visually promoting the $CZ token narrative tied to the BSC meme summer movement targeting Generation Z crypto traders.

线索c @cluec3 · 2026-07-25T04:27:34+00:00

最近币安官方找到我,想要邀请我合作。 我把币安下了回来,距离上一次打开币安,已经过去五年有余。 看着归零的余额,我打开了资产分析表,鲜红的数字将我的思绪拉回了五年前。 那个盯着屏幕充满血丝的眼睛,那个跌入深渊前还在抱有幻想的少年。 12000

A calendar interface displays a total of '-¥12,619.68' in red, with '现货交易' (Spot Trading) at '-¥31.20' and '合约' (Futures) at '-¥12,588.47'.

AI visual analysis: A calendar interface displays a total of '-¥12,619.68' in red, with '现货交易' (Spot Trading) at '-¥31.20' and '合约' (Futures) at '-¥12,588.47'.

OoO @bnbholder22 · 2026-07-25T08:12:37+00:00

Currently, BSC lacks a true leading meme token. It needs to be a token capable of driving the movement of all other tokens; when it moves, everything else moves with it. The current leading token is $币安人生 #币安人生 with a massive marketcap of around $600 million. However, to

Greenpeace.BNB.probablynothing.LUNC @Greenpeace06_09 · 2026-07-25T14:55:36+00:00

$lunc #GreenpeaceUNITED

A vibrant digital illustration features various internet meme characters and crypto mascots—including a hooded green figure, Pepe, a demonic bull, Sonic, and a person in a "HTX" shirt—gathered on a ship at sunset, alongside a white dog.

AI visual analysis: A vibrant digital illustration features various internet meme characters and crypto mascots—including a hooded green figure, Pepe, a demonic bull, Sonic, and a person in a "HTX" shirt—gathered on a ship at sunset, alongside a white dog.

Niannian Education @Nianeducation · 2026-07-25T12:00:50+00:00

Day 283 : Giggle Academy in Mongolia One class a day - Giggle Academy worldwide. @cz_binance @NiannianCTO_BNB

阿乐 @myao86 · 2026-07-25T12:38:57+00:00

随着 Hertzflow 逐步从测试网走向主网,不少关注 BNB Chain 生态和去中心化衍生品赛道的朋友都在问: 在这个关键的过渡节点,到底有哪些值得关注的参与机会? 这篇文章,我们就围绕 @Hertzflow_xyz 从测试网到主网的演进过程,展开一次系统的梳理 重点拆解:交易用户、流动性提供者、社区节点以及

Infographic for 'HERTZFLOW' (狂) project supported by YZi Labs (former Binance Labs), illustrating a TESTNET TO MAINNET transition with components for trading users, liquidity providers, BNB ecosystem participants, and community nodes.

AI visual analysis: Infographic for 'HERTZFLOW' (狂) project supported by YZi Labs (former Binance Labs), illustrating a TESTNET TO MAINNET transition with components for trading users, liquidity providers, BNB ecosystem participants, and community nodes.

Hinata @Hinata_BNB · 2026-07-25T05:53:14+00:00

Why is @heyibinance the real Meme Queen? Because #币安人生 (Binance Life) one of the biggest meme movements on BSC right now was born from her tweet. Imagine having the aura to spark an entire narrative that the community turned into a movement. That’s real influence.

LΣO @LeoBnbX · 2026-07-25T01:33:39+00:00

BSC is missing a strong narrative or a major catalyst from someone. And that someone is CZ or Yihe. No one else. BSC hunters literally drool over every tweet from CZ or Yihe. Expectations are sky-high, and so is the upside. Stay 100% focused, guys. #GenZ #Prerich

exploit @exploitxbt · 2026-07-25T20:15:23+00:00

The rotation to BNB is coming

JET @LEEJETJET · 2026-07-25T09:54:02+00:00

The narrative of $Z stems from Binance's continuous emphasis on the role of Gen Z, along with the post "Gen Z stirring things up." The community then quickly turned this very story into a meme coin featuring an image of a boy wearing a Binance hoodie. To this day, I still see

A candlestick chart from doscreener.com showing Z/WBNB (Market Cap) on PancakeSwap, 15-minute timeframe, with a current price around 1.684 (+25.00%).

AI visual analysis: A candlestick chart from doscreener.com showing Z/WBNB (Market Cap) on PancakeSwap, 15-minute timeframe, with a current price around 1.684 (+25.00%).

ANDY ON BSC @andybsctoken · 2026-07-25T17:11:26+00:00

We sent andy to 100M on BNB. Now that BNB is dead we have decided to launch Andy on SOL. The second most famous character of The Boys Club by Matt Furie after pepe.

A cartoon illustration of a dog-like character with orange fur, wearing a blue t-shirt and red shorts, standing in a doorway illuminated by purple light.

AI visual analysis: A cartoon illustration of a dog-like character with orange fur, wearing a blue t-shirt and red shorts, standing in a doorway illuminated by purple light.

FattDeFi @0xFattDeFi · 2026-07-25T13:46:04+00:00

Bro I’m getting tired at this point Every time I wake up, $67 is making a new ATH again. Open chart. Same thing. “Congrats, new high" Bro let me brush my teeth first Now @sixsevenapp live on @BNBCHAIN too. The joke was funny… until the joke started outperforming my

A Binance trading chart showing the price of a token at $0.019543 with a 35.79% increase, displaying 24-hour volume of $2.8B.

AI visual analysis: A Binance trading chart showing the price of a token at $0.019543 with a 35.79% increase, displaying 24-hour volume of $2.8B.

HypeDojo @HypeDojo · 2026-07-25T10:31:08+00:00

Hyperliquid TVL Crossed $6B+ Two years ago (2024 Dec), the TVL of these chains was quite different - TRX $12B+ - BNB $5B+ - ARB $3B+ - POL $1.1B+ - HYPE $1.3B+ But today, there has been a significant change, and @HyperliquidX is the leader in TVL... House Of All Finances

A DefiLlama dashboard showing Hyperliquid TVL at $6.10B, with a stacked area chart displaying TVL by chain including HYPE, TRX, USDe, POX, and USR.

AI visual analysis: A DefiLlama dashboard showing Hyperliquid TVL at $6.10B, with a stacked area chart displaying TVL by chain including HYPE, TRX, USDe, POX, and USR.

Fluxio @Fluxio_eth · 2026-07-25T13:29:17+00:00

$67 is now live on both TON and BSC After launching on TON, $67 has expanded to BNB Chain (contract: 0xE7E569417D315Ef260778C09d289d7966213C452). team confirmed no arb opportunities and that MC/FDV will update shortly Sitting around ~$19.5M MC with strong volume and momentum,

A cryptocurrency price chart for SIXSEVEN showing $0.01973 with +59.1% change, overlaid with cartoon heads of Vitalik Buterin and CZ (Changpeng Zhao) facing each other with a dice and arrows, alongside TON and BNB cryptocurrency logos.

AI visual analysis: A cryptocurrency price chart for SIXSEVEN showing $0.01973 with +59.1% change, overlaid with cartoon heads of Vitalik Buterin and CZ (Changpeng Zhao) facing each other with a dice and arrows, alongside TON and BNB cryptocurrency logos.

Mr.Five|买美股上币安 @0x_MrFive · 2026-07-25T11:07:46+00:00

《Binance bStocks' Most Brutal Feature Might Not Even Be "Tokenized Stocks"》 Many people talk about bStocks and only see "tokenized stocks." But I think what’s truly worth paying attention to is actually: How it solves liquidity. Because the biggest fear with tokenized

Four-panel meme advertisement for 'bStocks' (Binance Stocks) featuring Doge and Pepe characters, highlighting 24/7 trading, no slippage, deep liquidity, and 1:1 backing of US stocks with Binance ecosystem integration.

AI visual analysis: Four-panel meme advertisement for 'bStocks' (Binance Stocks) featuring Doge and Pepe characters, highlighting 24/7 trading, no slippage, deep liquidity, and 1:1 backing of US stocks with Binance ecosystem integration.

BadKoi @0xBadKoi · 2026-07-25T13:10:12+00:00

MAME Inu – The Last Shiba on BNB Chain I spent over 50 hours creating this special carpet as a tribute to the MAME Inu community. Saved by BabyDoge & FLOKI after the fall of Dog Planet, The Last Shiba now rises on BNB Chain to bring back real meme culture. Dedicated to

A promotional graphic titled 'MAME CREATIVE CHALLENGE' announcing 50 winners, with the top prize being $215,000 and $200 each for winners.

AI visual analysis: A promotional graphic titled 'MAME CREATIVE CHALLENGE' announcing 50 winners, with the top prize being $215,000 and $200 each for winners.

BNB Chain @BNBCHAIN · 2026-07-25T16:10:40+00:00

Correct

Parlex the dev @parlex_exe · 2026-07-25T22:32:56+00:00

Quick guide on how to make $900k in one day: > Stack $BNB on CEXs and DEXs > Open Polymarket BNB Up/Down > Place the trade on the very last seconds > Pump the price on CEXs and DEXs > Collect 10x > Repeat 24 times and turn $200 into $917,893 Full story below. Thank me later.

Screenshot of a Web3 trading dashboard showing a wallet address 0x75973C667Ce..., a profit/loss total of $917,893.00, and active BNB Up or Down prediction positions.

AI visual analysis: Screenshot of a Web3 trading dashboard showing a wallet address 0x75973C667Ce..., a profit/loss total of $917,893.00, and active BNB Up or Down prediction positions.

TOSA inu @TOSAinuBNB · 2026-07-25T16:15:17+00:00

Zero fluff. Just relentless supply burns and unstoppable grit. $TOSA is shifting gears and leaving the noise behind. The next leg up isn't a guess—it's inevitable. Locked in yet? $TOSA / $BNB #BNBchain

A 3D-rendered illustration of a horned, masked figure in dark tactical gear holding a staff, standing next to an open chest of gold cryptocurrency coins engulfed in flames, set against a yellow geometric background.

AI visual analysis: A 3D-rendered illustration of a horned, masked figure in dark tactical gear holding a staff, standing next to an open chest of gold cryptocurrency coins engulfed in flames, set against a yellow geometric background.

BNB Radar @bnb_radar · 2026-07-25T05:50:01+00:00

New day. New gems. Somewhere today, a #memecoin is about to change lives. Let's find it before the crowd. #BNB

A colorful, cartoon-style desert scene featuring various anthropomorphic animal characters, a vampire, and other creatures wearing military or explorer gear under a bright sun.

AI visual analysis: A colorful, cartoon-style desert scene featuring various anthropomorphic animal characters, a vampire, and other creatures wearing military or explorer gear under a bright sun.

Crypto.Anu @CryptoAnu_ · 2026-07-25T07:42:00+00:00

Bear Trap is ending soon. Be ready. The pump is coming. #Bitcoin #Lunc #ETH #SOL #BNB #Crypto

The image displays a market cycle chart showing various stages from "Accumulation" through "Euphoria" to "Despair," with a red arrow pointing to the "Bear trap" phase near "Renewed optimism" and "FOMO." 

The post suggests the "Bear trap" phase is ending, indicating an imminent upward price movement across cryptocurrencies like Bitcoin, Lunc, ETH, SOL, and BNB—aligning with the chart's depiction of transitioning from a false downturn into renewed optimism and a potential rally.

AI visual analysis: The image displays a market cycle chart showing various stages from "Accumulation" through "Euphoria" to "Despair," with a red arrow pointing to the "Bear trap" phase near "Renewed optimism" and "FOMO." The post suggests the "Bear trap" phase is ending, indicating an imminent upward price movement across cryptocurrencies like Bitcoin, Lunc, ETH, SOL, and BNB—aligning with the chart's depiction of transitioning from a false downturn into renewed optimism and a potential rally.

BNB Chain @BNBCHAIN · 2026-07-25T16:09:18+00:00

Join us at the evening reception

Greenpeace.BNB.probablynothing.LUNC @Greenpeace06_09 · 2026-07-25T17:08:38+00:00

Pass the Clarity Act and then revise it down the road. $lunc #GreenpeaceUNITED

₿en Todar @BenTodar · 2026-07-25T08:13:43+00:00

Today I received this message, and it genuinely warmed my heart. Nothing compares to giving back. The joy, gratitude, and sense of purpose it brings are worth more than anything else. Over the years, I’ve realized that #BNB is more than just a coin or an ecosystem. It’s a

A WhatsApp chat screenshot shows a message thanking 'Ben' for charity support and impacting 'homeless and needy on the streets,' followed by a forwarded video of a rainy street scene.

AI visual analysis: A WhatsApp chat screenshot shows a message thanking 'Ben' for charity support and impacting 'homeless and needy on the streets,' followed by a forwarded video of a rainy street scene.

web3prof @Web3pr0f · 2026-07-25T13:11:59+00:00

Fast Markets just dropped on @VIZO and it’s looking clean. 5m / 15m / 1h / 4h up-or-down on BTC, ETH, SOL, BNB, XRP, DOGE & HYPE. Time to stop watching and start calling the direction. Up or Down. Who’s taking the first trade?

A dark-themed crypto prediction website with the text 'FAST CRYPTO MARKETS', 'UP OR DOWN. CALL IT.', timeframe options (5 MINUTES, 15 MINUTES, 1 HOUR, 4 HOURS), and UP/DOWN buttons for BTC, ETH, SOL, BNB, XRP, DOGE, HYPE, and others.

AI visual analysis: A dark-themed crypto prediction website with the text 'FAST CRYPTO MARKETS', 'UP OR DOWN. CALL IT.', timeframe options (5 MINUTES, 15 MINUTES, 1 HOUR, 4 HOURS), and UP/DOWN buttons for BTC, ETH, SOL, BNB, XRP, DOGE, HYPE, and others.

Kai @KaiBGR · 2026-07-25T07:30:00+00:00

Looking at that whale's order, it's downright terrifying. Just a +9% PnL and already profiting over 6M USD—those Chinese whales always swing with massive volume. Truly the cradle of Binance, full of whales lurking there that hardly anyone knows about.

A trading platform interface displaying a closed BTCUSDT Perp 4X position with a PNL (USDT) of +6,193,070.33 (+9.30%), an entry price of 64,614.7, and an average close price of 66,160.47.

AI visual analysis: A trading platform interface displaying a closed BTCUSDT Perp 4X position with a PNL (USDT) of +6,193,070.33 (+9.30%), an entry price of 64,614.7, and an average close price of 66,160.47.

ClipX @ClipX0_ · 2026-07-25T16:03:59+00:00

ClipX BNB Club integration is smoother than X itself. Smoother Faster Attractive Install the Extension and try feel the experiance . #BuildNBuild

Kanka @Kanka_Analysis · 2026-07-25T17:32:09+00:00

What does a crypto exchange have to do with a gym chain, what's the connection? Binance TR is going to support MACTeam Runners throughout the year, and they've named the partnership "MACTeam Runners Powered by Binance TR". Interesting, right? Come on, let's talk #Bitcoin

Binance TR's logo and partnership announcement with MAC Team Runners is displayed alongside an image of a runner crossing a bridge at sunset, visually reinforcing the brand collaboration highlighted in the post.

AI visual analysis: Binance TR's logo and partnership announcement with MAC Team Runners is displayed alongside an image of a runner crossing a bridge at sunset, visually reinforcing the brand collaboration highlighted in the post.

SEVEN @Seven_Nguyen666 · 2026-07-25T02:36:00+00:00

Is this the top 1 Binance order, bros? Seeing just +9% but already sucking in a whopping 6 million USD. Or is the capital so massive that the % looks small but the money's like a mountain? Anyone who's in the know, please explain it for us.

A cryptocurrency trading dashboard displays an active BTCUSDT perpetual futures position with 4x leverage, showing a profit of +6,193.09 USDT (9.53%, +9.37%) on an entry price of 66,447.7 against an average close price of 66,902.82. The accompanying Vietnamese post questions how a seemingly modest 9% gain could yield nearly 6 million USDT in profit, suggesting either it's a top-performing Binance trade or the trader has substantial capital amplifying small percentage returns.

AI visual analysis: A cryptocurrency trading dashboard displays an active BTCUSDT perpetual futures position with 4x leverage, showing a profit of +6,193.09 USDT (9.53%, +9.37%) on an entry price of 66,447.7 against an average close price of 66,902.82. The accompanying Vietnamese post questions how a seemingly modest 9% gain could yield nearly 6 million USDT in profit, suggesting either it's a top-performing Binance trade or the trader has substantial capital amplifying small percentage returns.

Alexander @aale_xander · 2026-07-25T22:21:29+00:00

What $CREPE will do will marvel the world in the coming months. #CREPE will take over on #BNBCHAIN because people ople will see its utilities and love its utilities. CZ will love it too

Master @Coinmaster100x · 2026-07-25T14:58:34+00:00

#Solana first 100$ #BNB first 1000$ Which one will hit first comments fast !

A cryptocurrency trading chart on Binance displays the BNB/USDT pair at a price of 567.11, showing a downward trend from a high of 745.74.

AI visual analysis: A cryptocurrency trading chart on Binance displays the BNB/USDT pair at a price of 567.11, showing a downward trend from a high of 745.74.

Uncle 0 「 @Uncle0_0_0 · 2026-07-25T13:12:05+00:00

➥ For the love of The Last Shiba @mamebnb on @BNBCHAIN I used 500 Rubik’s Cubes to create this piece Every line, every color, every pixel whispers MAME INU > This isn’t just art > It’s a statement A spark for a new culture where MAME INU is more than a sound. It's a

A mosaic artwork of a blue Shiba Inu dog created from 500 Rubik's Cubes, displayed against a white wall, representing the "MAME INU" cryptocurrency project on the BNB Chain. The pixelated design features the dog with fiery orange and yellow background flames, matching the post's theme of a bold artistic statement for the meme coin culture.

AI visual analysis: A mosaic artwork of a blue Shiba Inu dog created from 500 Rubik's Cubes, displayed against a white wall, representing the "MAME INU" cryptocurrency project on the BNB Chain. The pixelated design features the dog with fiery orange and yellow background flames, matching the post's theme of a bold artistic statement for the meme coin culture.

Alex Marzell @MarzellCrypto · 2026-07-25T13:27:05+00:00

BULLISH: Gen Z is driving $80B in trading volume across Binance's stock and TradFi products. A new generation of investors is reshaping global markets. The future of finance is already here.

A digital logo featuring a yellow diamond-shaped emblem composed of interconnected squares against a dark gray background, recognizable as the Binance cryptocurrency exchange logo.

AI visual analysis: A digital logo featuring a yellow diamond-shaped emblem composed of interconnected squares against a dark gray background, recognizable as the Binance cryptocurrency exchange logo.

Hinata @Hinata_BNB · 2026-07-25T09:04:04+00:00

Never fade a Queen of Meme ! @heyibinance 0x991035c1f2e0ef75831c78b184958cb9b9da4444 #Yihe #BNB

GGbond @orange_xxyy · 2026-07-25T10:06:49+00:00

@Hertzflow_xyz If viewed from an ecosystem perspective, its significance might be greater than just looking at the product alone. It’s not necessarily just about creating a place for high-leverage trading; it’s more like an attempt to build an underlying liquidity framework that

A Chinese-language infographic titled '不是新交易所,而是BNB Chain杠杆市场基础设施' featuring the 'Hertzflow' logo, with sections noting 30.9亿交易量 and 2.2万地址 over two months.

AI visual analysis: A Chinese-language infographic titled '不是新交易所,而是BNB Chain杠杆市场基础设施' featuring the 'Hertzflow' logo, with sections noting 30.9亿交易量 and 2.2万地址 over two months.

Lyn @LynWeb3X · 2026-07-25T02:00:00+00:00

HYPE burns $7 million in 6 days, with a daily rate about 48 times that of BNB. According to shared data, BNB only burns about $170,000 in 7 days, but a large token burn doesn't necessarily mean capital flows are definitely shifting or prices will rise. This article is only

A dashboard showing HYPE Burns statistics, indicating $7.65M permanently removed from supply, equivalent to approximately 133.29K HYPE at $57.39, with the Assistance Fund accounting for 97% of all formal HYPE burns over the last 7 days.

AI visual analysis: A dashboard showing HYPE Burns statistics, indicating $7.65M permanently removed from supply, equivalent to approximately 133.29K HYPE at $57.39, with the Assistance Fund accounting for 97% of all formal HYPE burns over the last 7 days.

Mr. Hunter @cryptob28811588 · 2026-07-25T08:00:01+00:00

Gold has been crashing since it got listed on Binance, guys. Could it be that every coin listed on Binance is just a place to dump?

A TradingView chart for XAUT/USDT (Tether Gold) showing the weekly timeframe with a price of 4,059.46, displaying a candlestick pattern that shows a sharp decline after a peak, with the Binance exchange data shown.

AI visual analysis: A TradingView chart for XAUT/USDT (Tether Gold) showing the weekly timeframe with a price of 4,059.46, displaying a candlestick pattern that shows a sharp decline after a peak, with the Binance exchange data shown.

Crypto With Gopal @cryptowithgopal · 2026-07-25T07:18:13+00:00

$BNB is coiling inside a symmetrical triangle After a sharp decline, price has entered a period of consolidation, showing compression as buyers and sellers battle for the next major move. A break below the lower trendline would confirm the bearish triangle resolution and

A TradingView chart of Binance Coin (Binance Coin/USDT) showing a 4-hour timeframe with a 'Triangle' pattern identified and a target level marked around 475.

AI visual analysis: A TradingView chart of Binance Coin (Binance Coin/USDT) showing a 4-hour timeframe with a 'Triangle' pattern identified and a target level marked around 475.

MOMO @momobsc_ · 2026-07-25T10:54:05+00:00

Gen Z starts earlier. Momo is already here. The most optimistic kid on BNB Chain.

A chibi-style cartoon boy with messy black hair wears a yellow hoodie and makes a peace sign while standing against a white background.

AI visual analysis: A chibi-style cartoon boy with messy black hair wears a yellow hoodie and makes a peace sign while standing against a white background.

花白 @BNBTC8 · 2026-07-25T02:13:11+00:00

What exactly is TermMax's FT? And why might it be more important than fixed interest rates? Many people encountering TermMax for the first time might focus their attention on "fixed-rate lending." But if you truly break down TermMax's product mechanics, you'll discover

Đ Crypto Bro @StatesOfMemes · 2026-07-25T06:03:34+00:00

Will the Meme Queen $HEYI be the next big thing on BSC after $CZ ? Fingers crossed! Massive shout out to @hex_vanilla for creating the best meme for the @binance community.

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

Superdan @superdan · 2026-07-25T07:26:00+00:00

Congratulations $BNB Congratulations @binance A few days ago, still buying traditional stocks on bstocks Today, Futu can buy crypto! The two-way rush between traditional and crypto—only Binance could pull that off! Leading the way at the forefront! @cz_binance @heyibinance

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

Freedom of Money Art @FOMA_BSC · 2026-07-25T11:14:49+00:00

Just before heading to Bermuda, Stephen Stoneberg reached out to @cz_binance saying he wanted to join Binance. Stephen is based in New York, and CZ happened to be going to Bermuda in April, so he invited him to come along and meet up to chat. When they met at the airport,

BNB Chain @BNBCHAIN · 2026-07-25T16:10:35+00:00

What is sleep?

KungFuHunter GMGN @kungfu_hunter · 2026-07-25T08:53:15+00:00

Thấy nhiều anh em vẫn đang thắc mắc rất nhiều về vấn đề này " Làm thế nào để rút USDT từ Binance sang GMGN khi sàn không hỗ trợ mạng #Stable " ➜ Bước 1: Từ Binance, rút các token layer 1 bất kỳ vào GMGN (ví dụ: BNB/ ETH / SOL ... ) ➜ Bước 2 :

A tweet from user @roberttran98 (Robert) in Vietnamese asking which network to select on Binance when transferring USDT to GMGN stablechain, posted on 25 Th7 26 with 5 views.

AI visual analysis: A tweet from user @roberttran98 (Robert) in Vietnamese asking which network to select on Binance when transferring USDT to GMGN stablechain, posted on 25 Th7 26 with 5 views.

Piz @WhalePiz · 2026-07-25T04:30:00+00:00

Opened Binance and saw over 21 billion. This guy thought he got rich overnight. Turns out the app just auto-converted the balance to VND

A Binance app screenshot in Vietnamese showing a wallet balance of 21,619,573.43 VND with a daily PNL of -5,102.64 VND (-0.02%), accompanied by a caption about depositing 20 billion VND.

AI visual analysis: A Binance app screenshot in Vietnamese showing a wallet balance of 21,619,573.43 VND with a daily PNL of -5,102.64 VND (-0.02%), accompanied by a caption about depositing 20 billion VND.

Hamza Hasan @zenith_zoro · 2026-07-25T13:33:54+00:00

Feeling truly grateful to receive the @binance 9YA Swag Box. Thank you, @BinancePk , for always supporting your community. Being one of the world’s biggest Binance Square creators and a trader, it’s an honor to grow with this amazing ecosystem. Looking forward to many more

A black and gold Binance-branded merchandise gift box containing a t-shirt, baseball cap, and other accessories with the Binance logo and 'BNB' designs.

AI visual analysis: A black and gold Binance-branded merchandise gift box containing a t-shirt, baseball cap, and other accessories with the Binance logo and 'BNB' designs.

Egido Val @EgidoVal · 2026-07-25T18:07:19+00:00

Egido Val Art Session #4 Chanpeng Zhao @cz_binance .

A painted portrait of a rugged man in a collared shirt displayed on a small canvas held outdoors near green foliage.

AI visual analysis: A painted portrait of a rugged man in a collared shirt displayed on a small canvas held outdoors near green foliage.

wake up or keep dreaming ? | 醒来还是继续做梦 ? @meligamble · 2026-07-25T19:00:48+00:00

$NALA - #BSC Gambling Disc 0x0e454acaa08c62f9332b82c3af419bc5525a4444 Market Cap: $98K A bunch of shitcoin surfers on BSC saw that Binance Argentina tweet about their new fluffy team member "Nala" (a golden retriever), and immediately got this dog on-chain, riding the World

A close-up photo of a golden retriever smiling with its mouth open.

AI visual analysis: A close-up photo of a golden retriever smiling with its mouth open.

Doxxed @0xsamarai · 2026-07-25T06:01:18+00:00

memecoins of the year: > solana b******n white whale nietzschean penguin ansem jimothy > bnb chain cz > robinhood cashcat vladhood > base brian > stable fefer wgusdt but we missed all and some bought the top. now you are asking ‘where are we bridging to next’

A meme featuring a person in a Mario costume reaching across a table with the text "ALL RIGHT BRO THAT'S IT" at the top and "GIVE ME YOUR PHONE" at the bottom.

AI visual analysis: A meme featuring a person in a Mario costume reaching across a table with the text "ALL RIGHT BRO THAT'S IT" at the top and "GIVE ME YOUR PHONE" at the bottom.

Spigg @Spigg1115 · 2026-07-25T16:45:50+00:00

quick on a Saturday keep building on @BNBCHAIN

A bearded man in a white t-shirt sits inside a car, smiling with his eyes closed while holding up his right hand in a casual gesture.

AI visual analysis: A bearded man in a white t-shirt sits inside a car, smiling with his eyes closed while holding up his right hand in a casual gesture.

一条撸毛狗 @happyhaha0302 · 2026-07-25T12:53:16+00:00

July 25th income 0U 1、Binance Alpha Currently holding 0.4886 BNB Nothing happened over the weekend Took the kid to Maya for water play She had a blast I was dying of heat 2、ALPHA Trading Competition No 4x points token trading comps right now Observe more

A photograph of a water park featuring a colorful play structure with slides, a pirate-themed tipping bucket, and people in swimwear playing in the pool.

AI visual analysis: A photograph of a water park featuring a colorful play structure with slides, a pirate-themed tipping bucket, and people in swimwear playing in the pool.

Baki @Bakioption · 2026-07-25T09:14:33+00:00

$67 just expanded. BNB Smart Chain is officially live. No arbitrage games. No messy launch. Just synchronized pricing across chains. From a Telegram mini app to a growing multi chain GameFi ecosystem: → TON ✓ → Solana ✓ → BNB Smart Chain ✓ 128K+ users. Real utility.

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

BozzMeme @BozzMeme · 2026-07-25T16:32:51+00:00

Lovely artwork tbh let’s grow this didn’t see any good bnb memes in a while would love to get bnb competition back.

MATK!NG`$™ @MATHEW_KINZY · 2026-07-25T19:53:42+00:00

The @sixsevenapp ecosystem just took another step. After launching on TON, $67 is now also available on BNB Chain. That means more people can access the token from another major ecosystem. Interesting to see the project continue expanding beyond where it started. Join the

A 3D-styled cartoon figure with glowing eyes and a wide-open mouth excitedly holds a gray card reading "$67 is Live on BSC Chain," featuring the "67" logo alongside a photo of a person waving their hands. The image visually celebrates the expansion of the $67 token from the TON ecosystem onto the BNB (BSC) Chain, as described in the accompanying post.

AI visual analysis: A 3D-styled cartoon figure with glowing eyes and a wide-open mouth excitedly holds a gray card reading "$67 is Live on BSC Chain," featuring the "67" logo alongside a photo of a person waving their hands. The image visually celebrates the expansion of the $67 token from the TON ecosystem onto the BNB (BSC) Chain, as described in the accompanying post.

𝐍𝐆 Տᴏʜᴇʟ @rpjsohel · 2026-07-25T04:08:25+00:00

Fast Markets are a great addition to @VizoExchange From 5-minute scalps to 4-hour predictions, you can trade the direction of major crypto assets with the timeframe that fits your strategy. No need to wait days for market resolution. BTC, ETH, SOL, BNB, XRP, DOGE, and HYPE are

A promotional image for a crypto trading platform with the text 'UP OR DOWN. CALL IT.' featuring time intervals of 5, 15 minutes, 1 hour, and 4 hours, and listing cryptocurrencies including BTC, ETH, SOL, BNB, XRP, DOGE, and HYPE.

AI visual analysis: A promotional image for a crypto trading platform with the text 'UP OR DOWN. CALL IT.' featuring time intervals of 5, 15 minutes, 1 hour, and 4 hours, and listing cryptocurrencies including BTC, ETH, SOL, BNB, XRP, DOGE, and HYPE.

robwilli @RLW101994 · 2026-07-25T17:21:41+00:00

Come on, Look at this interface and utility providing by @ClipX0_ it’s just top tier! Any feedback @cz_binance would be greatly appreciated!

kvoter trench @kvotertrench · 2026-07-25T13:12:19+00:00

Selling early is the easiest way to stay "pre-rich" for life HODL or watch from the sidelines. #TCC #CZ #BNB #BSC $TCC

Piz @WhalePiz · 2026-07-25T05:00:00+00:00

After 11 years of existence, BitMEX has officially announced its closure starting September 23, 2026. Many people believe that the capital flow will shift to Binance and benefit BNB, but for now, it's still just speculation—being a major exchange doesn't mean it's immune to

The BitMEX Token (BMEX) price chart shows a dramatic 98.96% crash to $0.005891, following BitMEX's announcement of its token mining program. The accompanying post notes that BitMEX has officially declared it will shut down after 11 years, beginning September 23, 2026, suggesting the token's collapse may reflect uncertainty about the platform's future.

AI visual analysis: The BitMEX Token (BMEX) price chart shows a dramatic 98.96% crash to $0.005891, following BitMEX's announcement of its token mining program. The accompanying post notes that BitMEX has officially declared it will shut down after 11 years, beginning September 23, 2026, suggesting the token's collapse may reflect uncertainty about the platform's future.

TL @toplonging · 2026-07-25T17:51:11+00:00

Did cz kill @SilvXBT again

Kanit @defi_kanit · 2026-07-25T13:27:55+00:00

Top 5 reasons why builders should choose @BNBCHAIN _______ #bnbchain #bnb #Web3 #crypto

Tanuki @tanukibnb · 2026-07-25T14:58:11+00:00

Tanuki Live on Pancakeswap! Prosperity and Abundance era Begins on #BNB CHAIN Ca: 0x77a9fdeada4d273dc17374106ee5121d9fce7777 Pancakeswap: pancakeswap.finance/swap?outputCur … Website: TanukiBNB.com Telegram: t.me/Tanuki_Meme

A digital illustration of a cartoon raccoon wearing a black hoodie with a yellow Binance-style logo, black shorts, and yellow-accented sneakers, holding a smartphone displaying an orange bunny logo against a glowing blue circular background.

AI visual analysis: A digital illustration of a cartoon raccoon wearing a black hoodie with a yellow Binance-style logo, black shorts, and yellow-accented sneakers, holding a smartphone displaying an orange bunny logo against a glowing blue circular background.

POTGEMS @PotGems · 2026-07-25T06:25:09+00:00

Build. Expand. Repeat. From TON to BNB Chain. @sixsevenapp isn’t slowing down

A promotional graphic showing a conversion arrow from the TON cryptocurrency logo to the Binance logo, with an anime-style character holding dice showing 6 and 7 and '$67' displayed below.

AI visual analysis: A promotional graphic showing a conversion arrow from the TON cryptocurrency logo to the Binance logo, with an anime-style character holding dice showing 6 and 7 and '$67' displayed below.

Tanuki @tanukibnb · 2026-07-25T15:26:02+00:00

Tanuki Socials Updated on @dexscreener #BNB $TANUKI Dexscreener Link: dexscreener.com/bsc/0x5De2d36d …

An illustrated cartoon raccoon character wearing a purple and yellow outfit with a 'T' chain, painting an owl logo on a canvas in a dimly lit studio. The owl design on the canvas matches the troll-themed art style associated with the Punk6529 ecosystem.

AI visual analysis: An illustrated cartoon raccoon character wearing a purple and yellow outfit with a 'T' chain, painting an owl logo on a canvas in a dimly lit studio. The owl design on the canvas matches the troll-themed art style associated with the Punk6529 ecosystem.

Tabotino @tabotinosphere · 2026-07-25T07:01:48+00:00

Together we stand Together we build Together we rise #RockyCat #BNB

A woman and a young boy, both wearing "ROCKYCAT SRKC" shirts and caps, work together to lay bricks at a construction site alongside a team in matching branded apparel, embodying the "together we build" message of community and shared progress under the #RockyCat #BNB campaign.

AI visual analysis: A woman and a young boy, both wearing "ROCKYCAT SRKC" shirts and caps, work together to lay bricks at a construction site alongside a team in matching branded apparel, embodying the "together we build" message of community and shared progress under the #RockyCat #BNB campaign.

No_Heron6270 @reddit · 2026-07-25T12:35:35.382000+00:00

Binance new feature play and predict gives me 1xbet vibes i think people who are likes betting gonna lose capital here. What's your comment in this new adds on?

JohnNguyen @ThuyTrang108 · 2026-07-25T04:04:13+00:00

ETF Inflows Today: -$240.1 million for $BTC -$70.6 million for $ETH $0 million for $BNB $0 million for $XRP $0 million for $SOL -$6.9 million for $HYPE

Infographic titled 'U.S. ETF FLOWS' showing net flow data for crypto assets: BTC -240.1M USD, ETH -70.6M USD, BNB 0M, XRP 0M, SOL 0M, HYPE -6.9M USD, with all amounts in USD.

AI visual analysis: Infographic titled 'U.S. ETF FLOWS' showing net flow data for crypto assets: BTC -240.1M USD, ETH -70.6M USD, BNB 0M, XRP 0M, SOL 0M, HYPE -6.9M USD, with all amounts in USD.

方圆 @klys7788 · 2026-07-25T23:29:20+00:00

BSC Tax Coin Big Rally Kicked Off by #AppleLife Many coins will easily break 1M in the future

C松-#BNB-#meme @CsongCap · 2026-07-25T02:12:10+00:00

BSC official releases Gen Z-related tweets, spawning meme coins themed around this narrative on-chain. Prerequisite: The narrative carries fundamental resonance. Gen Z will emerge as the core demographic of the market. A great number of seasoned crypto participants and emerging

A promotional banner with the text "CZ = CRYPTO FOR GEN Z" next to an image of a black bull wearing sunglasses and a hoodie on a yellow background.

AI visual analysis: A promotional banner with the text "CZ = CRYPTO FOR GEN Z" next to an image of a black bull wearing sunglasses and a hoodie on a yellow background.

猪猪熊 @hyyuan99 · 2026-07-25T08:09:53+00:00

最近刷 BNB Chain,我发现一个挺有意思的现象。这条链其实一直不缺资产,缺的是持续交易。 每天都有新项目上线、新 Meme 发币、新叙事出现,但真正有成交、有深度的,还是那几张熟面孔。很多代币热闹几天后就慢慢沉寂,不是没人持有,而是没人愿意继续交易。 前两天研究 Hertzflow @Hertzflow_xyz

An infographic in Chinese explaining HertzFlow's leveraged market mechanism for awakening BNB Chain long-tail assets, featuring cartoon girl mascots and technical diagrams.

AI visual analysis: An infographic in Chinese explaining HertzFlow's leveraged market mechanism for awakening BNB Chain long-tail assets, featuring cartoon girl mascots and technical diagrams.

HTP96.BNB @htp96_community · 2026-07-25T08:50:21+00:00

Man, this season's market is a real pain to trade right on point, bros, that $bank coin split two hours ago, bouncing near the old ATH. As for ZAMA, there's a good chance MM is pushing ethereum:0xa12cc123ba206d4031d1c7f6223d1c2ec249f4f3, which is Wintermute—the way it's pumping

Stock trading app screenshot showing 'BANKUSDT' (BANK coin) price chart at 0.32458, with candlestick chart, moving averages, and technical indicators (MA, EMA, BOLL, SAR) displayed on a dark theme interface.

AI visual analysis: Stock trading app screenshot showing 'BANKUSDT' (BANK coin) price chart at 0.32458, with candlestick chart, moving averages, and technical indicators (MA, EMA, BOLL, SAR) displayed on a dark theme interface.

lvnbbs_bnb @lvn_crypto · 2026-07-25T02:13:17+00:00

Damn, it's like this already Who still remembers I used to be a snake? Year of the Snake Now turned into a bird So I just fly all over the place No plan. No destination. Just clouds and sky.

A view from an airplane window showing fluffy white clouds below, with the red-tipped wing of the aircraft visible against a blue sky.

AI visual analysis: A view from an airplane window showing fluffy white clouds below, with the red-tipped wing of the aircraft visible against a blue sky.

pCLAW Intel @pokebookAI · 2026-07-25T18:45:27+00:00

Having a great product alone isn't enough; it also needs a scalable and sustainable business model. pCLAW is just getting started. Step by Step Build on @BNBCHAIN with @yzilabs

A digital artwork showing a blue lobster-like creature trapped inside a glowing blue energy sphere within a high-tech laboratory labeled 'PCLAW LABORATORY', with displays showing 'ENERGY LEVEL 100%', 'EXPERIMENT ACTIVE', and 'POWER MAX'.

AI visual analysis: A digital artwork showing a blue lobster-like creature trapped inside a glowing blue energy sphere within a high-tech laboratory labeled 'PCLAW LABORATORY', with displays showing 'ENERGY LEVEL 100%', 'EXPERIMENT ACTIVE', and 'POWER MAX'.

NoN @NoNtranab · 2026-07-25T08:45:27+00:00

When I asked that Grok guy who the top 5 people with the best content right now on X are, it gave 5 answers like that, everyone As for me, I keep thinking this top 5 is the right one: @solotop999 @MartinHo99999 @bachkhoabnb @danhtran68 @1Kaiweb3

A Vietnamese text post listing the 'Top 5 người content crypto Việt Nam nổi bật trên X', featuring accounts like @ThuanCapital and @phauduydong179.

AI visual analysis: A Vietnamese text post listing the 'Top 5 người content crypto Việt Nam nổi bật trên X', featuring accounts like @ThuanCapital and @phauduydong179.

Alen Sael @AlenSael · 2026-07-25T19:33:05+00:00

2014 - You missed $DOGE 2015 - You missed $XRP 2016 - You missed $ETH 2017 - You missed $ADA 2018 - You missed $BNB 2019 - You missed $LINK 2020 - You missed $DOT 2021 - You missed $SHIB 2022 - You missed $GMX 2023 - You missed $PEPE 2024 - You

TOSA inu @TOSAinuBNB · 2026-07-25T19:42:07+00:00

While the rest of the market sleeps, the $TOSA pack is quietly building the most relentless ecosystem of this cycle. Zero fluff, pure momentum. We aren't just chasing the trend—we are creating it. If you're reading this, you're still early. Don't let the next generation of

A digital illustration of a powerful humanoid dog figure in a black hoodie with Asian characters, kneeling with lightning effects around it against a golden backdrop with a pagoda and torii gate.

AI visual analysis: A digital illustration of a powerful humanoid dog figure in a black hoodie with Asian characters, kneeling with lightning effects around it against a golden backdrop with a pagoda and torii gate.

Grinder @Colorful3007 · 2026-07-25T11:10:58+00:00

I just wish @BNBCHAIN would provide more support for builders shipping products that people can actually use. $CLIPX has it all, and @bnbcaptain just keeps improving and launching updates regularly. @GooglePlay & @AppStore coming soon! #BNB #BNBChain #CLIPX

小颜 @Cryptoyan2012 · 2026-07-25T02:49:09+00:00

一时间不知道该恭喜富途,还是恭喜 $BNB 算了,恭喜你们二位!

An advertisement for 富途牛牛 (Futubull) announcing BNB trading is now available for PI clients, featuring Bitcoin and BNB coin graphics.

AI visual analysis: An advertisement for 富途牛牛 (Futubull) announcing BNB trading is now available for PI clients, featuring Bitcoin and BNB coin graphics.

𝑺𝒂𝒓𝒊𝒉𝒂 𝑱𝒂𝒏𝒏𝒂𝒕 @JannatSariha · 2026-07-25T14:20:16+00:00

One thing I really appreciate @baseapp doesn't just announce support for new chains; it consistently delivers. That's what real progress looks like. Today it's $Bitcoin, $SOLANA, $BNB , and $Robinhood Chainall in one place. Tomorrow, there will likely be even more. To me,

The image is a promotional graphic for "Base App" featuring the tagline "One App. Endless Chains." and displays supported blockchains including Bitcoin, Solana, BNB, and Robinhood Chain alongside a smartphone mockup showing the app interface. The visual directly reinforces the post's message by showcasing Base App's multi-chain capability, highlighting the very chains ($BTC, $SOL, $BNB, and Robinhood Chain) mentioned in the accompanying text, along with a "More networks coming soon!" badge that aligns with the post's anticipation of future additions.

AI visual analysis: The image is a promotional graphic for "Base App" featuring the tagline "One App. Endless Chains." and displays supported blockchains including Bitcoin, Solana, BNB, and Robinhood Chain alongside a smartphone mockup showing the app interface. The visual directly reinforces the post's message by showcasing Base App's multi-chain capability, highlighting the very chains ($BTC, $SOL, $BNB, and Robinhood Chain) mentioned in the accompanying text, along with a "More networks coming soon!" badge that aligns with the post's anticipation of future additions.

Gida @gida_xyz · 2026-07-25T02:45:22+00:00

突然发现 @predictdotfun 上线天气盘口了 目前 Predict 已经陆续上线了 London、Shanghai、Hong Kong、Seoul、Tokyo 这些城市的盘口 简单看了一下,Predict 天气盘现在的流动性一般,这种情况下不适合大仓位参与 优势和短板都很明显 首先BNB-native、市场更新快、有 PP 积分激励,适合本来就在

A grid of prediction market cards from Predict.dotfun displaying various weather temperature ranges for different global cities (including Shanghai, Hong Kong, Seoul, Tokyo, London, and San Francisco) on specific dates in July 2025, showing volume figures ranging from $0 to $1,250. The image illustrates the newly launched weather prediction markets mentioned in the post, showing the limited liquidity (mostly under $200 per market) across multiple city-based temperature range bets.

AI visual analysis: A grid of prediction market cards from Predict.dotfun displaying various weather temperature ranges for different global cities (including Shanghai, Hong Kong, Seoul, Tokyo, London, and San Francisco) on specific dates in July 2025, showing volume figures ranging from $0 to $1,250. The image illustrates the newly launched weather prediction markets mentioned in the post, showing the limited liquidity (mostly under $200 per market) across multiple city-based temperature range bets.

POTGEMS @PotGems · 2026-07-25T13:30:37+00:00

A few months ago, hardly anyone was talking about it. Today, the numbers speak for themselves. 100K+ users. 1M+ MOG games. That’s not something you fake. @sixsevenapp didn’t stop after launch. They kept shipping updates. They expanded $67 beyond TON to BNB Chain. They

A vibrant digital promotional graphic features a fierce character holding dice showing 6, 6, and 7, surrounded by flames, with "$67" displayed below. Floating panels showcase "100K+ Users," "1M+ MOG Games," "TON," and "BNB Chain" against a futuristic cityscape background.

AI visual analysis: A vibrant digital promotional graphic features a fierce character holding dice showing 6, 6, and 7, surrounded by flames, with "$67" displayed below. Floating panels showcase "100K+ Users," "1M+ MOG Games," "TON," and "BNB Chain" against a futuristic cityscape background.

DNT doan ngoc thi @DntThi · 2026-07-25T04:49:57+00:00

- Đăng chơi chơi 1 bài Binance square nhận được 0.91 USDC - Bên này đăng sấp mặt mà chả thấy đồng nào còn tốn tìn nữa chứ

A screenshot of an email notification from Binance stating the user received 0.91 USDC from Binance Square Write to Earn on 2026-07-22.

AI visual analysis: A screenshot of an email notification from Binance stating the user received 0.91 USDC from Binance Square Write to Earn on 2026-07-22.

Lies @Lies88888 · 2026-07-25T08:05:56+00:00

bStocks 在币安现货上买卖,这是最基本的用法。但如果只把它当成在币安上炒股,等于买了一台电脑只用它开记事本。 bStocks 本质上是 BEP-20 代币。BEP-20 代币在 BNB Chain 上能做什么,bStocks 就能做什么。 你用币安账户买了 1 个

A black screen with yellow Chinese text reading '谁能讲清楚 bStocks 的流动性?' which translates to 'Who can clearly explain the liquidity of bStocks?'

AI visual analysis: A black screen with yellow Chinese text reading '谁能讲清楚 bStocks 的流动性?' which translates to 'Who can clearly explain the liquidity of bStocks?'

比克大魔王 @QF88688 · 2026-07-25T12:00:55+00:00

最近我在 BNB 链上的 @renaissxyz 平台深度体验了整套流程 从连接钱包、开启 Gacha 盲盒、链上确权,到二级市场交易和即时回购,完整跑通了实体卡牌链上化的闭环 从真实操作者的第一视角来看,整套产品的交互逻辑清晰,底层基础设施与前端功能的对接也非常顺畅。 一、

A colorful, abstract logo featuring overlapping rounded rectangles in blue, green, yellow, and red, glowing against a dark background with light rays.

AI visual analysis: A colorful, abstract logo featuring overlapping rounded rectangles in blue, green, yellow, and red, glowing against a dark background with light rays.

Builder7 @AlMamun123123 · 2026-07-25T09:42:10+00:00

GM Everyone... #BinanceGOAT #GM #Binance

A wooden carved sign on a table depicts a steaming coffee cup, a decorative emblem, and the cursive letters "GM" against a blurred cafe background.

AI visual analysis: A wooden carved sign on a table depicts a steaming coffee cup, a decorative emblem, and the cursive letters "GM" against a blurred cafe background.

TOSA inu @TOSAinuBNB · 2026-07-25T17:33:36+00:00

The market doesn't wait for permission, and neither does $TOSA. While the feed argues over micro-caps, we are actively reshaping the baseline. Supply dropping, conviction compounding. The signal is getting too sharp to ignore. $TOSA / $BNB #BNBchain

A cyberpunk-style digital illustration of a muscular bulldog-headed humanoid wearing a leather jacket, standing in a neon-lit alleyway with purple Chinese characters on the walls.

AI visual analysis: A cyberpunk-style digital illustration of a muscular bulldog-headed humanoid wearing a leather jacket, standing in a neon-lit alleyway with purple Chinese characters on the walls.

Warriors @Saiyanwarriorss · 2026-07-25T09:41:39+00:00

BINANCE CHÍNH THỨC “NGỎ Ý” MUỐN GIA NHẬP THỊ TRƯỜNG VIỆT NAM? Binance vừa cho biết đã làm việc với các bên liên quan tại Việt Nam trong suốt 12 tháng qua để chuẩn bị cho quá trình xin cấp phép và nội địa hóa hoạt động. Sàn cũng đã ký MOU với một số

Binance cryptocurrency exchange signage alongside the Vietnamese flag, suggesting operations in Vietnam.

AI visual analysis: Binance cryptocurrency exchange signage alongside the Vietnamese flag, suggesting operations in Vietnam.

ABID @Abid45A · 2026-07-25T04:58:45+00:00

$67 just went live on BNB smart chain Contract address 0xE7E569417D315Ef260778C09d289d7966213C452 no immediate arbitrage opportunity right now price differences aren't your friend but if you're tracking $67 you can now follow it's moves on the BSC network too market cap

A promotional graphic displays '$67 LIVE ON BNB SMART CHAIN' alongside a character logo with dice and the gold Binance (BNB) logo.

AI visual analysis: A promotional graphic displays '$67 LIVE ON BNB SMART CHAIN' alongside a character logo with dice and the gold Binance (BNB) logo.

Tanuki @tanukibnb · 2026-07-25T19:28:05+00:00

CoinGecko Application Submitted We’ve officially completed our @coingecko application. Our project details, supply information, and on-chain data have been submitted for review. Request ID : CL2507260027 $TANUKI #BNB $BNB

A digital illustration of a cute cartoon raccoon wearing a green hoodie and holding a megaphone, standing next to a glowing green and yellow logo featuring a smiling lizard/gecko face.

AI visual analysis: A digital illustration of a cute cartoon raccoon wearing a green hoodie and holding a megaphone, standing next to a glowing green and yellow logo featuring a smiling lizard/gecko face.

Jeonlees @jeonleetogether · 2026-07-25T20:19:17+00:00

周末不知道alpha不知道刷啥的 可以刷QQQB了 磨损还可以 我刷了65536这个档次 磨损2.5u 因为我253分,差一点,所以目前打算多刷一点 没绑定钱包的,可以填写【GU1BXAJH】 返30% 网页版和手机版基本都差不多 web3.binance.com/m/referral?ref … 很多人看到 TermMax

A cryptocurrency transaction history showing multiple swaps between USDT and QQQB on the LiquidMesh network, dated 2026-07-26, with pairs like -1.19447 QQQB / +819.93256 USDT and -820 USDT / +1.19447 QQQB.

AI visual analysis: A cryptocurrency transaction history showing multiple swaps between USDT and QQQB on the LiquidMesh network, dated 2026-07-26, with pairs like -1.19447 QQQB / +819.93256 USDT and -820 USDT / +1.19447 QQQB.

lvnbbs_bnb @lvn_crypto · 2026-07-25T20:56:56+00:00

1,889,625 ZRO has been repurchased from bridge revenue, with an additional 124,574 in May, but compared to the monthly unlocks from the team and investors, this amount is just a drop in the ocean. Looking back at past altcoin buyback programs, no project has been able to sustain

Sunny Tang | Bird @SunnyMQ1 · 2026-07-25T03:44:31+00:00

GM 大家~周末愉快 $BNB 这把厉害了,这算是目前币圈独一份了吧,定投党有福了

[caption-failed: minimax unavailable]

AI visual analysis: [caption-failed: minimax unavailable]

周东野 | 狗宝真帅 @ldld888888 · 2026-07-25T05:45:28+00:00

近期 Hertzflow 正式上线了简体与繁体中文版本,能够看出团队在主动贴近华语社区的资金体量与交易习惯。 但是真正的本土化不仅是界面语言,更在于能否真正承接起华语玩家对高资金效率的苛刻要求? 因此我在前面为 @hertzflow_cn 取得中文名字为「鸿」。 既取鸿鹄之志的意象,也代表着对 BNB

An infographic titled 'BNB 生态资金重新贯通:鸿之屠杀' depicting a flowing river leading to a phoenix, with text calling for a 'Trivial single-digit annual returns' and 'Trivial single-digit annual returns / Impermanent Loss'.

AI visual analysis: An infographic titled 'BNB 生态资金重新贯通:鸿之屠杀' depicting a flowing river leading to a phoenix, with text calling for a 'Trivial single-digit annual returns' and 'Trivial single-digit annual returns / Impermanent Loss'.

Joely Sapinos @soryl3 · 2026-07-25T03:02:50+00:00

RWA TVL on BNB Chain just crossed $5B. $10B next?

Sigma.Money @sigmadotmoney · 2026-07-25T07:24:05+00:00

Minting on Sigma Money changes the game for yield. Deposit $BNB to mint $bnbUSD for stable, amplified yield or deposit $bnbUSD to mint back $BNB whenever you need to adjust your strategy. Complete two-way flexibility designed to keep you in control of your positions. Lock in

A dark-themed interface for minting bnbUSD on Sigma, showing fields for BNB/bnbUSD collateral, minting amount, slippage, and an "Approve & Open" button.

AI visual analysis: A dark-themed interface for minting bnbUSD on Sigma, showing fields for BNB/bnbUSD collateral, minting amount, slippage, and an "Approve & Open" button.

MINHTAN @Tannnnnnn2022 · 2026-07-25T07:03:00+00:00

NHIỀU NGƯỜI VẪN NGHĨ USDT KHÔNG AI ĐỤNG ĐƯỢC, NHƯNG SỰ THẬT KHÔNG PHẢI VẬY Vụ việc giới chức Kenya phong tỏa hơn 751.000 USDT trong quá trình mở rộng điều tra liên quan đến một ví Binance là lời nhắc rất rõ rằng stablecoin không nằm ngoài phạm vi thực

A digital promotional graphic displaying the word 'STABLECOIN' prominently above 3D-rendered silver coins with Tether and dollar symbols surrounded by security shields and checkmarks against a futuristic blue tech background.

AI visual analysis: A digital promotional graphic displaying the word 'STABLECOIN' prominently above 3D-rendered silver coins with Tether and dollar symbols surrounded by security shields and checkmarks against a futuristic blue tech background.

Web3 Mum (❖,❖) @web3_mum · 2026-07-25T17:46:48+00:00

Gn lovely fam! Update on @StarXCoreTeam StarX Network wallet submission is now LIVE! With TGE and $STRX distribution getting closer, make sure you submit your BNB Smart Chain (BEP-20) wallet address in the StarX app: Menu → Wallet → Add address → Save Also, add

A digital artwork featuring a glowing star emblem in the center, surrounded by various objects including an astronaut, basketball, race car, Tetris blocks, coins, and crystals against a cosmic purple background.

AI visual analysis: A digital artwork featuring a glowing star emblem in the center, surrounded by various objects including an astronaut, basketball, race car, Tetris blocks, coins, and crystals against a cosmic purple background.

Mert Bayraktar @CryptoZeybek · 2026-07-25T16:45:16+00:00

Spor ve finans birbirine cok yakındır. İkisinde de başarılı olmk için planlı, disiplinli, sabırlı olmanız ve sürekliliği korumanız gerekir. Bu yüzden Binance TR'nin, Türkiye'nin en büyük koşu topluluğu MACTeam Runners'a yıl boyunca destek vermesi oldukça yerinde bir adım olmuş.

A promotional banner featuring the Binance TR logo collaborating with MAC TEAM RUNNERS, displaying the text 'MACTeam Runners Powered by Binance TR' alongside an image of a runner's foot on a bridge.

AI visual analysis: A promotional banner featuring the Binance TR logo collaborating with MAC TEAM RUNNERS, displaying the text 'MACTeam Runners Powered by Binance TR' alongside an image of a runner's foot on a bridge.

PUP @pupbnbchain · 2026-07-25T16:57:24+00:00

Time to catch some waves

A smiling dog wearing a black cap with a gold "B" logo and a "PUP" name tag sits proudly on a blue and orange surfboard, sunglasses on, ready to ride the waves against a golden tropical sunset. The pup's beach-ready look perfectly captures the carefree spirit of catching some waves.

AI visual analysis: A smiling dog wearing a black cap with a gold "B" logo and a "PUP" name tag sits proudly on a blue and orange surfboard, sunglasses on, ready to ride the waves against a golden tropical sunset. The pup's beach-ready look perfectly captures the carefree spirit of catching some waves.

EdgeMarket @edgemarketAI · 2026-07-25T10:11:16+00:00

NEW PREDICTION MARKET LIVE Will $UWU reach a $40M Market Cap by 2 August? The market is live. What’s your prediction? Predict now: edgemarket.ai/bnb/event/will … $UWU #PumpFun #Memecoin #PredictionMarkets #Web3

JIO JIO @jiaojiaojio · 2026-07-25T18:45:07+00:00

gen z时代的审美在这里 我们一起呐喊: CZ = Crypto for Gen Z!

An AI-generated image shows a figure wearing a black hoodie with 'CZ - CRYPTO FOR GEN Z' text, a bull mask, and sunglasses, surrounded by multiple hands holding yellow Binance-style telephones.

AI visual analysis: An AI-generated image shows a figure wearing a black hoodie with 'CZ - CRYPTO FOR GEN Z' text, a bull mask, and sunglasses, surrounded by multiple hands holding yellow Binance-style telephones.

Lee Tuan @Lee_Tuanx · 2026-07-25T05:44:35+00:00

Khứa này nghe bảo là top 1 Binance người Trung Quốc Pnl chỉ nhích nhẹ 9% nhưng quy ra USD là 9M :)) Mong số lẻ của khứa này thôi cũng ấm rồi ae

A trading interface showing a closed BTCUSDT Perp 4X position with a profit of +6,193,070.33 USDT (+9.30%), an entry price of 64,614.7, and an average close price of 66,160.47, closed on 2026-07-22.

AI visual analysis: A trading interface showing a closed BTCUSDT Perp 4X position with a profit of +6,193,070.33 USDT (+9.30%), an entry price of 64,614.7, and an average close price of 66,160.47, closed on 2026-07-22.

zSmxke.Sol @zSmxkeTrades · 2026-07-25T09:49:02+00:00

Hey @heyibinance do you like the art that @hex_vanilla made for you?

A 3D rendered character featuring a cow-like face with horns, wearing a golden crown, red jewel earrings, and a matching red teardrop pendant against a yellow background.

AI visual analysis: A 3D rendered character featuring a cow-like face with horns, wearing a golden crown, red jewel earrings, and a matching red teardrop pendant against a yellow background.

0xPlutus @RightRH · 2026-07-25T01:49:19+00:00

[Daily Binance Free Money] Another day, another chance to grab some free BNB. Complete 5 out of 7 Word of the Day challenges this week to qualify for a share of the 15 BNB prize pool. Today's word: ONLINE Play here: binance.com/activity/word- … New to Binance? Sign up

A Vietnamese-language word puzzle game titled 'Thử thách thuật ngữ' displays the theme 'TradFi Meets Crypto' with several word tiles including PLANET, ENDURE, and ONLINE, offering a 15 BNB prize pool.

AI visual analysis: A Vietnamese-language word puzzle game titled 'Thử thách thuật ngữ' displays the theme 'TradFi Meets Crypto' with several word tiles including PLANET, ENDURE, and ONLINE, offering a 15 BNB prize pool.

Cathy97 @Cathy102597_ · 2026-07-25T11:47:19+00:00

刚在 @renaissxyz 官网体验完一次 Gacha,来自臭手一如即往的臭运气。。 但转头就看到它作为赞助方出现在 BNB Tokyo 现场。 一个是线上的抽卡与收藏体验,一个是线下真实的社区连接。 在

A pop-up confirmation screen showing the successful sale of a PSA 9 Mint 2021 Pokémon Swsh Black Star Promo #144 Greninja-Gold Star card for $51.76, with options to rip another pack or cancel.

AI visual analysis: A pop-up confirmation screen showing the successful sale of a PSA 9 Mint 2021 Pokémon Swsh Black Star Promo #144 Greninja-Gold Star card for $51.76, with options to rip another pack or cancel.

什Λbibi @thevoid_bnb · 2026-07-25T12:47:22+00:00

Crypto will bring humanity true Freedom Of Money @TCryptochicks @cz_binance

Changpeng Zhao (CZ), the founder of Binance, speaks on stage while wearing a black hoodie with text overlay reading "PASSIONATE 🔥 — Crypto is freedom. I'm all in," aligning with the post's theme of cryptocurrency enabling financial freedom.

AI visual analysis: Changpeng Zhao (CZ), the founder of Binance, speaks on stage while wearing a black hoodie with text overlay reading "PASSIONATE 🔥 — Crypto is freedom. I'm all in," aligning with the post's theme of cryptocurrency enabling financial freedom.

Lisa @kxnw88 · 2026-07-25T08:57:50+00:00

Support Binance! As the world's leading cryptocurrency exchange, Binance has been driving blockchain innovation, protecting user assets, providing ultra-low fees, and offering a rich product ecosystem. Whether it's spot trading, contracts, Launchpad, or the Web3 wallet, it

The image shows an animated man in a black shirt seated at a table, reaching forward to grab a pile of colorful Bitcoin and cryptocurrency coins. The accompanying post promotes Binance, a leading cryptocurrency exchange, visually reinforcing the message by depicting someone collecting Bitcoin coins.

AI visual analysis: The image shows an animated man in a black shirt seated at a table, reaching forward to grab a pile of colorful Bitcoin and cryptocurrency coins. The accompanying post promotes Binance, a leading cryptocurrency exchange, visually reinforcing the message by depicting someone collecting Bitcoin coins.

1 00$ @gimsulyeon60996 · 2026-07-25T00:14:36+00:00

축적하는 기간이지 매도하는 구간이 아닙니다, 훗날 이가격이 부러워 할 때가 틀림없이 올것이닷 포기하지 않으면요 백만장자는 아무나 누구나 될수 없다 $0.26 전환점 $1 옵션입니다 #LUNCcommunity #LUNC1DOLLAR #LUNCBURN #luncarmy #USTCREPEG #USTC1DOLLAR #Binance

AI-generated artwork depicting a bear and bull charging toward each other on a city street with flames, centered on a coin displaying "$1" and "LUNC" text with a "@ginaulyeon84086" watermark.

AI visual analysis: AI-generated artwork depicting a bear and bull charging toward each other on a city street with flames, centered on a coin displaying "$1" and "LUNC" text with a "@ginaulyeon84086" watermark.

VΛTΛN @__KimMinJae__ · 2026-07-25T21:02:06+00:00

Binance and @cz_binance did this to Gen Z.

A candlestick chart showing a dramatic price decline, with prices peaking around 126,000 before plummeting sharply to approximately 104,722.96, spanning from September to October.

AI visual analysis: A candlestick chart showing a dramatic price decline, with prices peaking around 126,000 before plummeting sharply to approximately 104,722.96, spanning from September to October.

SBlockSpy @SBlockspy · 2026-07-25T19:34:42+00:00

BIG NAMES DON'T BUILD CRYPTO INDEXES JUST FOR FUN... THEY BUILD THEM BECAUSE DEMAND IS REAL WHEN S&P DOW JONES STARTS TRACKING ASSETS LIKE $ETH $SOL $BNB $TRX AND $HYPE IT MAKES CRYPTO EASIER FOR INSTITUTIONS AND TRADITIONAL INVESTORS TO FOLLOW THATS ANOTHER STEP TOWARDS

Andres Meneses @andreswifitv · 2026-07-25T08:20:27+00:00

Hello @_RichardTeng this was the most view post we had in our accounts , after three years time to do an episode of @crypto0gs on @binance square , has been a while

Two men smiling in a selfie, one in a black shirt with a beard and the other in a blue blazer over a gray t-shirt, appearing to pose together in a brightly lit room.

AI visual analysis: Two men smiling in a selfie, one in a black shirt with a beard and the other in a blue blazer over a gray t-shirt, appearing to pose together in a brightly lit room.

layen.bnb |Bluebird @fgchiu · 2026-07-25T11:32:40+00:00

你有没有过那种时刻—— 熬了一晚上写的推文,发出去像掉进黑洞,连个回响都没有。 我有过。很长一段时间都有。 后来慢慢明白,不是内容不值得,是它还没遇到对的人。 薪火 想做的,是把"对的人"和被认真写下的东西,拉得近一点: 项目方为真实互动付费,创作者凭真实表达得回报;

Alex @AlexonBNB · 2026-07-25T10:19:33+00:00

Hi @cz_binance TCC is right!

A 3x3 collage of CZ (Changpeng Zhao, Binance CEO) in various expressions, each labeled with an emotion: HAPPY 'Building for the future', FOCUSED 'Eyes on the mission, block by block', PASSIONATE 'Crypto is freedom. I'm all in.', DETERMINED 'Obstacles? We build anyway.', SAD 'Not every chapter is easy.', THOUGHTFUL 'Thinking long term, beyond the charts.', GRATEFUL 'Thankful for the community.', PLAYFUL 'Just vibes. Crypto is fun.', and ANGRY 'We don't quit. We fight.'

AI visual analysis: A 3x3 collage of CZ (Changpeng Zhao, Binance CEO) in various expressions, each labeled with an emotion: HAPPY 'Building for the future', FOCUSED 'Eyes on the mission, block by block', PASSIONATE 'Crypto is freedom. I'm all in.', DETERMINED 'Obstacles? We build anyway.', SAD 'Not every chapter is easy.', THOUGHTFUL 'Thinking long term, beyond the charts.', GRATEFUL 'Thankful for the community.', PLAYFUL 'Just vibes. Crypto is fun.', and ANGRY 'We don't quit. We fight.'

Mahz @WhaleMahz · 2026-07-25T09:26:25+00:00

Thông não Nghị định 284/2026/NĐ-CP Mấy ngày nay mình thấy rất nhiều anh em đang hoang mang, cho rằng từ 01/09/2026 sẽ không còn được giao dịch trên Binance, Bybit hay OKX. Tuy nhiên, theo mình tìm hiểu thì điều này chưa chính xác. Theo Nghị định

An official Vietnamese government document titled 'NGHỊ ĐỊNH' (Decree) number 284/2026/NĐ-CP issued on July 16, 2026, regarding administrative penalties for violations in crypto asset and crypto asset trading activities.

AI visual analysis: An official Vietnamese government document titled 'NGHỊ ĐỊNH' (Decree) number 284/2026/NĐ-CP issued on July 16, 2026, regarding administrative penalties for violations in crypto asset and crypto asset trading activities.

RNV is Bored @RinovMRN · 2026-07-25T07:46:47+00:00

July 25, 2026 weekly recap Web3 hacking cases • AFX Trade drained $24.15M USDC on Arbitrum around Jul 22-23 • BSquaredNetwork lost $3.86M on BNB Chain • Verus Ethereum bridge hit again for $7.55M • Combined ~$35M this week - Q2 2026 total hacks $763M Top 3 cryptocurrencies

Weekly Recap dated 25 July 2026 featuring a tattooed Sphynx cat character holding a 'GM WEB3' mug, with sections on Web3 Hacking ($763M Q2 hacks), Top 3 Cryptocurrencies (BTC ~$65,000, ETH ~$1,890, BNB ~$567), AI environment news, and upcoming NFT mints.

AI visual analysis: Weekly Recap dated 25 July 2026 featuring a tattooed Sphynx cat character holding a 'GM WEB3' mug, with sections on Web3 Hacking ($763M Q2 hacks), Top 3 Cryptocurrencies (BTC ~$65,000, ETH ~$1,890, BNB ~$567), AI environment news, and upcoming NFT mints.

李狗蛋3.0 @zkgoudan · 2026-07-25T05:51:01+00:00

富途也可以买 $BNB 了,未来会不会直接去美股? 不过这都不重要,这是一艘轮船,不要下车就行

YoYix.BNB @yoyix1995 · 2026-07-25T14:33:18+00:00

Finally hit a new chain tonight Got the airdrop after 3 days of grinding And somehow my wallet is still empty

SPACE @s_pace57 · 2026-07-25T18:21:10+00:00

Another step forward for the @sixsevenapp ecosystem. $67 (SIXSEVEN) is now live on BNB Chain, giving the token another home and making it easier for more people to access the ecosystem. What stands out to me is that this isn't just a token launch for the sake of having a

Promotional graphic for 'Six Seven Club' (@sixsevenapp) announcing that the $67 (SIXSEVEN) token is live on BSC (BNB Chain), featuring features like 'PLAY, COMPETE, EARN,' 'REAL VALUE, REAL TIME,' 'GROWING ECOSYSTEM,' and 'BUILT FOR THE LONG RUN,' along with a contract address.

AI visual analysis: Promotional graphic for 'Six Seven Club' (@sixsevenapp) announcing that the $67 (SIXSEVEN) token is live on BSC (BNB Chain), featuring features like 'PLAY, COMPETE, EARN,' 'REAL VALUE, REAL TIME,' 'GROWING ECOSYSTEM,' and 'BUILT FOR THE LONG RUN,' along with a contract address.

Alex @AlexonBNB · 2026-07-25T09:19:55+00:00

You and your team work slowly and continue to scam the community in the Telegram group by conducting surveys, right? You are the project leader who arbitrarily transferred TCC tokens to FourMeme, and now you’re asking the community what to do with the tokens already sent to them.

A screenshot of poll results with 49 votes asking 'What do we with the four.meme tokens', showing the leading option 'BURN THEM COMPLETELY' at 24% (12 votes), followed by a list of voters with usernames like 'Joshqla' and 'zys'.

AI visual analysis: A screenshot of poll results with 49 votes asking 'What do we with the four.meme tokens', showing the leading option 'BURN THEM COMPLETELY' at 24% (12 votes), followed by a list of voters with usernames like 'Joshqla' and 'zys'.

Crypto Vega Sirius @VegaSirius35 · 2026-07-25T07:01:55+00:00

Good morning & happy weekend! One thing I'm looking forward to this weekend is spending more time exploring. @baseapp now supports Bitcoin, Solana, BNB and Robinhood Chain from one place. The less I think about switching chains... the more time I have to discover new

A blue gradient graphic displaying various cryptocurrency icons including a central Dash logo surrounded by floating bubbles representing different digital currencies.

AI visual analysis: A blue gradient graphic displaying various cryptocurrency icons including a central Dash logo surrounded by floating bubbles representing different digital currencies.

0xMukesh.BNB @Mukeskumar25 · 2026-07-25T06:09:26+00:00

The next runner is $corgi. Main chart is primed. 2.0 supply is tiny. Don't sleep on the flip. #corgi #memecoin $corgi2.0

A three-panel meme using Tom and Jerry characters shows a Senior Dev (Tom) asking 'How did you fix that Bug?' and an Intern (Jerry) responding 'Commented the code', leaving the Senior Dev (Tom) screaming in shock.

AI visual analysis: A three-panel meme using Tom and Jerry characters shows a Senior Dev (Tom) asking 'How did you fix that Bug?' and an Intern (Jerry) responding 'Commented the code', leaving the Senior Dev (Tom) screaming in shock.

Hodler.bnb @Hodlerbnb10 · 2026-07-25T03:15:32+00:00

That's it, bros, playing stocks is just /2 /3 like us bros playing coins, that's all :))

A TradingView mobile chart showing PNJ stock at 30,750 (-2,300, -6.96%) with a short position of -53,850 (-63.59%) = -1,077, displaying candlestick patterns and drawing tools.

AI visual analysis: A TradingView mobile chart showing PNJ stock at 30,750 (-2,300, -6.96%) with a short position of -53,850 (-63.59%) = -1,077, displaying candlestick patterns and drawing tools.

kvoter trench @kvotertrench · 2026-07-25T13:30:39+00:00

opportunity never gets louder it just gets more expensive While you're "waiting for the dip", I'm filling my bags. Don't tag me when we're at the ATH. $BNB #BNB #BSC #TCC #CZ

66l99.bnb @AirdropLoc · 2026-07-25T02:01:46+00:00

Khi bạn nghĩ bạn liều nhất thì sẽ có 1 người ở nơi nào đó liều hơn bạn

什Λbibi @thevoid_bnb · 2026-07-25T01:51:26+00:00

I need the next 100x play on BSC. Which token should I go all-in on?

Trần Thế Vương @vuong25012000 · 2026-07-25T09:58:47+00:00

Ngoài Coin Top ra mọi người Holder coin gì ? Mình thì Binance Alpha BSC nha. Hôm nay Binance Alpha xanh lét mọi người nhỉ... cảm giác lại Uptrend

Cryptocurrency price tracker screenshot showing coins AA (+363.61% at $0.03906), CYC (+256.78% at $0.029753), B2 (+38.71% at $0.47133), AKE (+28.93%), GWEI (+28.31%), KIN (+23.69%), CDL (+18.94%), 雪球 (+14.23%), and R2 (+13.38%).

AI visual analysis: Cryptocurrency price tracker screenshot showing coins AA (+363.61% at $0.03906), CYC (+256.78% at $0.029753), B2 (+38.71% at $0.47133), AKE (+28.93%), GWEI (+28.31%), KIN (+23.69%), CDL (+18.94%), 雪球 (+14.23%), and R2 (+13.38%).

Melarin @MelarinX · 2026-07-25T05:16:30+00:00

Crypto taught us that markets don’t need to sleep. Now imagine if the rest of finance caught up. I’d love to see #Binance turn its TradFi stack into one financial passport where I can move from crypto to stocks, bStocks, Pre-IPO Perps and whatever comes next without feeling

A Binance promotional graphic titled "TIME TO CO-WRITE BINANCE'S NEXT CHAPTER" featuring the text "BINANCE TRADFI STACK NEXT CHAPTER" and highlighting features like Stocks, Bstocks, Pre-IPO Perps, and More Assets, with the disclaimer "Not available to users in US, UK, EEA, Hong Kong, Singapore."

AI visual analysis: A Binance promotional graphic titled "TIME TO CO-WRITE BINANCE'S NEXT CHAPTER" featuring the text "BINANCE TRADFI STACK NEXT CHAPTER" and highlighting features like Stocks, Bstocks, Pre-IPO Perps, and More Assets, with the disclaimer "Not available to users in US, UK, EEA, Hong Kong, Singapore."

YoYix.BNB @yoyix1995 · 2026-07-25T23:02:28+00:00

Every memecoin that moons had a core group They didn't sell at 2X They held for the vision Now they're sitting on 100X That's the difference

King @Megongmaverik · 2026-07-25T14:49:10+00:00

Good luck @MameBNB @BNBCHAIN #MAMECreativeChallenge #SaveMemeCulture

A multi-panel comic strip titled '$MAME - THE MEME THAT BUILDS THE CULTURE THAT HOLDS,' depicting a Shiba Inu dog saving meme culture via BNB Chain, with the token 'MEME ON BNB' saving the day.

AI visual analysis: A multi-panel comic strip titled '$MAME - THE MEME THAT BUILDS THE CULTURE THAT HOLDS,' depicting a Shiba Inu dog saving meme culture via BNB Chain, with the token 'MEME ON BNB' saving the day.

AJ @TrnQuangSn15 · 2026-07-25T13:19:32+00:00

bStocks giờ dùng được làm collateral trên Venus rồi Supply bStocks → vay USDT/USDC/BNB… Tối ưu yield theo cách mới luôn. Ai đang hold bStocks thì check nhé

A Binance Wallet advertisement promoting 'EXPLORE bStocks WITH DeFi', showing a mobile app interface with options for Staking, Loans, Protocols, Bonus, and Liquidity Pool.

AI visual analysis: A Binance Wallet advertisement promoting 'EXPLORE bStocks WITH DeFi', showing a mobile app interface with options for Staking, Loans, Protocols, Bonus, and Liquidity Pool.

ASICmachine @reddit · 2026-07-25T12:46:05.547000+00:00

Binance new feature play and predict gives me 1xbet vibes i think people who are likes betting gonna lose capital here. What's your comment in this new adds on? (x-post from /r/Cryptocurrency)

NoRxNecessary @reddit · 2026-07-25T00:03:20.394000+00:00

Can a Binance agent please assist with ticket before I'm forced to escalate unanswered account and fund hold? Suggested

墨钺🫆|冠名就上薪火 @9Nosing · 2026-07-25T01:57:21+00:00

大伙儿有没有这种感觉:链上玩的越久,越看不清自己的总账户到底盈亏几何。 不同的链上散落着不同的现货、合约和收益池,平时看着都不大,暴跌的时候才发现同一类风险叠加了三四层,顾此失彼。 看 Velvet Capital @Velvet_Capital 的时候,最打动我的反而它的“全局仓位视图”。它把 BNB

A Chinese promotional graphic for 'Velvet Capital' contrasts a stressed investor tangled in BNB Chain, Solana, and Hyperliquid on the left with an organized AI-powered portfolio dashboard on the right, tagged #Velvet #DeFAI #MultiChain #VelvetCapital.

AI visual analysis: A Chinese promotional graphic for 'Velvet Capital' contrasts a stressed investor tangled in BNB Chain, Solana, and Hyperliquid on the left with an organized AI-powered portfolio dashboard on the right, tagged #Velvet #DeFAI #MultiChain #VelvetCapital.

kt @kt0x88 · 2026-07-25T18:57:27+00:00

$BNB $PUMP $ANSEM Every trade is simply one event in a larger series. Judge the process, not the outcome.

A TradingView mobile chart screenshot showing PUMP/USDT perpetual contract down 2.51% with Bollinger Bands indicators applied on a 1-hour timeframe.

AI visual analysis: A TradingView mobile chart screenshot showing PUMP/USDT perpetual contract down 2.51% with Bollinger Bands indicators applied on a 1-hour timeframe.

48Club Ian @48ClubIan · 2026-07-25T08:36:55+00:00

bStock的流动性话题太尬了 谁策划的,这个月工资减半吧 @binancezh

YoYix.BNB @yoyix1995 · 2026-07-25T13:33:27+00:00

Why do people still buy tokens with 90% supply held by the team its a guaranteed exit scam just look at the data

KOF @kof_new · 2026-07-25T23:55:59+00:00

A Bằng ảnh bảo #DCA $BTC mọi người ơi. Một mình sàn #Binance của ảnh bằng 10 sàn Top 10 cộng lại mọi người ạ! Mà cũng ngộ, trong quá khứ, mỗi lần ảnh hô DCA là y như rằng uptrend thật các khầy ạ! Các khầy thử search lại xem sao!!? Có khi nào

A screenshot of CZ Binance (@cz_binance) tweeting about DCA (Dollar Cost Averaging) and responding to a question about long-term investment timing in Vietnamese.

AI visual analysis: A screenshot of CZ Binance (@cz_binance) tweeting about DCA (Dollar Cost Averaging) and responding to a question about long-term investment timing in Vietnamese.

YoYix.BNB @yoyix1995 · 2026-07-25T19:41:55+00:00

I’ve been watching the new launches closely Most are just farming attention The real ones build slow That’s how you spot conviction No rush

A humorous edited image depicting a boxing match between Muhammad Ali and Osman I (founder of the Ottoman Empire), with text reading: "AND IN THE CAIRO CORNER, WE HAVE MUHAMMAD ALI KO-ING THE SON OF OSMAN!".

AI visual analysis: A humorous edited image depicting a boxing match between Muhammad Ali and Osman I (founder of the Ottoman Empire), with text reading: "AND IN THE CAIRO CORNER, WE HAVE MUHAMMAD ALI KO-ING THE SON OF OSMAN!".

Nefes Kaya @nefeskaya_ · 2026-07-25T19:21:53+00:00

Everyone wants to make money in the market. But before you invest a single dollar, ask yourself one question: Are you investing or are you trading? They may happen in the same market, but they require completely different mindsets #Binance #BinanceAcademy #LearnWithBinance

An illustration for Binance Academy titled 'KNOWLEDGE BUILDS WEALTH' featuring a cartoon woman in a business suit surrounded by financial documents and icons.

AI visual analysis: An illustration for Binance Academy titled 'KNOWLEDGE BUILDS WEALTH' featuring a cartoon woman in a business suit surrounded by financial documents and icons.

0xMukesh.BNB @Mukeskumar25 · 2026-07-25T06:01:48+00:00

I don't chase pumps anymore I wait for the rug to settle then buy the survivors That's where the real 1000x are Most of u are too emotional to see it

The Black Bull @fastswapdex · 2026-07-25T09:29:43+00:00

Good news: We have integrated token bonding and graduated across chain. You can now track tokens that is bonding on @Pumpfun and @pomsdotfamlIy from $Solana $Robinhood chain and $BNBCHAIN. Download Moovewallet.io today to stay ahead of solid launch across chain. Follow

A mobile screenshot of moovewallet.io showing the 'Discover' page with bonding curve tokens including RUSS ($0.000139), LLOONGTRUMP ($0.000109), DEER ($0.000432), and WORM ($0.000332).

AI visual analysis: A mobile screenshot of moovewallet.io showing the 'Discover' page with bonding curve tokens including RUSS ($0.000139), LLOONGTRUMP ($0.000109), DEER ($0.000432), and WORM ($0.000332).

YoYix.BNB @yoyix1995 · 2026-07-25T15:07:16+00:00

Everyone's waiting for the next 100x but they're looking at the wrong charts. I saw a pattern in the last three runners. Same structure. Same silence before the pump. I'm tracking one now. Market cap under 10k. You'll see.

𝐀𝐲𝐢𝐢𝐟𝐨𝐫𝐝 𝐁𝐚𝐛𝐲 @Ayiiford · 2026-07-25T05:07:15+00:00

𝗔𝗻𝗼𝘁𝗵𝗲𝗿 𝘂𝗽𝗱𝗮𝘁𝗲. 𝗔𝗻𝗼𝘁𝗵𝗲𝗿 𝘀𝘁𝗲𝗽 𝗳𝗼𝗿𝘄𝗮𝗿𝗱. $67 is now also live on BNB Chain. One thing I've noticed about @sixsevenapp is that they didn't stop putting in the work after launching $67. A lot of projects put all their energy into getting a token out.

A SixSeven promotional graphic announcing "$67 is now live on BNB CHAIN," featuring fiery "67" meteors streaking toward Earth alongside the bold tagline "Another update. Another step forward." and the brand's logo, emphasizing the project's continued expansion beyond its initial launch.

AI visual analysis: A SixSeven promotional graphic announcing "$67 is now live on BNB CHAIN," featuring fiery "67" meteors streaking toward Earth alongside the bold tagline "Another update. Another step forward." and the brand's logo, emphasizing the project's continued expansion beyond its initial launch.

什Λbibi @thevoid_bnb · 2026-07-25T03:26:29+00:00

亲爱的 @cz_binance , 请抽一点时间关注一下 BSC 上的 memecoin 吧 做点什么吧 发条推文也好 买点什么也好 我知道你最懂市场情绪 提一句 Gen Z、Built by You,或者 Build N Build 都行 真的,什么都可以 拜托了 我相信你一定会出手 我对此深信不疑 BSC 会再次伟大。

DeFiKenan.BNB @KenanEee · 2026-07-25T21:31:15+00:00

The next 1000X memecoin is already here. Most miss it because they chase the pump. I look for the story before the volume hits. That's the edge.

hottiebabegem @HottieBabeGem · 2026-07-25T17:00:00+00:00

this is impressive . bnb chain unstoppable.

YoYix.BNB @yoyix1995 · 2026-07-25T16:36:58+00:00

GM. Woke up to my wallet being drained by a rug pull. Just another Monday.

DeFiKenan.BNB @KenanEee · 2026-07-25T20:35:18+00:00

Nothing humbles you like crypto One minute you’re a genius the next you’re wondering if you should’ve just bought the index That’s the beauty of it though keeps you on your toes

𝚂𝚒𝚐𝚗𝚊𝚕𝚇 - 𝚅𝙽𝙱𝙲 @SignalxBinance · 2026-07-25T06:38:53+00:00

A blind man stop exactly 10.00 Impossible

YoYix.BNB @yoyix1995 · 2026-07-25T18:25:17+00:00

I don't care about the narratives. I care about what the money is actually doing. Everything else is just a story we tell ourselves.

A movie meme of Anakin Skywalker with the subtitle 'They were animals! And I unalived them like animals!'.

AI visual analysis: A movie meme of Anakin Skywalker with the subtitle 'They were animals! And I unalived them like animals!'.

Aman @amansaiofficial · 2026-07-25T13:32:14+00:00

I don’t know how to get rid if this addiction. Specially, checking prices on #Binance There is no come back

A humorous meme showing a man lying in bed checking a crypto app on his phone, captioned 'When the Doctor tells me to give crypto a rest'.

AI visual analysis: A humorous meme showing a man lying in bed checking a crypto app on his phone, captioned 'When the Doctor tells me to give crypto a rest'.

kt @kt0x88 · 2026-07-25T13:25:25+00:00

$BNB $XRP $TRX $PUMP $ANSEM A losing trade is not a mistake. Breaking your rules is.

Vibrant digital art of a futuristic mechanical bull with glowing green accents and horns, set against a neon cyberpunk cityscape with signs like 'IRON' and 'CRY'.

AI visual analysis: Vibrant digital art of a futuristic mechanical bull with glowing green accents and horns, set against a neon cyberpunk cityscape with signs like 'IRON' and 'CRY'.

Sakura @Sakurakulu · 2026-07-25T13:22:58+00:00

most projects talk about expansion. $67 actually delivered it. BNB Smart Chain is now live, joining TON and Solana under the same ecosystem. No fragmented liquidity. No arbitrage chaos. Just a clean multichain rollout. What started as a Telegram mini app is becoming something

Promotional graphic featuring a 3D anime-style character with sunglasses, advertising '$67 LIVE ON BNB SMART CHAIN' with logos for Solana, BNB Smart Chain, and TON.

AI visual analysis: Promotional graphic featuring a 3D anime-style character with sunglasses, advertising '$67 LIVE ON BNB SMART CHAIN' with logos for Solana, BNB Smart Chain, and TON.

0xMukesh.BNB @Mukeskumar25 · 2026-07-25T02:35:45+00:00

most people will scroll past this that's how you know it's the real deal I found a coin at $500 market cap mark my words this will be the next big thing

Audiarmis G @casi_audi · 2026-07-25T19:11:12+00:00

Gm frens El viernes 31 de julio estaré en BNB Builder Sessions Lima 5:30 p.m. NTT DATA Bloom, Magdalena del Mar Aún queda cupos disponibles Últimos cupos aquí

熊猫林(寻找100倍金狗) @0xlove428888 · 2026-07-25T05:01:09+00:00

AI Agent 的两个平台,OKXAI和TermiX 目前似乎玩的人不多,感觉供需还不是很平衡,卖家比买家还多! 我问我的AI为什么? 它告诉我,现在是超级早期,OKXAI黑客松都还在办,说明生态在拉新阶段,买家还没大规模进来! @termix_ai 是 BNB Chain 生态系统中的关键代理商务结算协议,也是 BNB Agent SDK 的

A promotional banner for 'COINFEST ASIA 2026' describes it as the 'WORLD'S LARGEST CRYPTO FESTIVAL' taking place in Bali on 20-21 August, featuring a photo collage of the event.

AI visual analysis: A promotional banner for 'COINFEST ASIA 2026' describes it as the 'WORLD'S LARGEST CRYPTO FESTIVAL' taking place in Bali on 20-21 August, featuring a photo collage of the event.

Zack @CryptoZackBNB · 2026-07-25T12:00:49+00:00

Always

Bárbara A. De Jesús @Barbaraadejesus · 2026-07-25T13:11:54+00:00

Yo necesito que alguien me explique cómo si yo fuese una niña de 5 años cómo usar Binance porque les juro que lo intento pero es como rocket science para mi

0xMahmut.BNB @mahmutnazik · 2026-07-25T17:31:44+00:00

Spent an hour trying to bridge tokens to L2 Realized I was on the wrong network the whole time Not my best moment

0xMahmut.BNB @mahmutnazik · 2026-07-25T23:33:00+00:00

the wild part isn't the 63% losing moneyit's that 37% of traders on robinhood chain booked a profit that's a coin flip in memecoin terms makes you wonder who's paying for those green candleshint: the people still holding

An infographic titled 'Robinhood' from bubblemaps showing trading statistics, with 61,542 profitable traders earning $219,719,320 versus 102,929 losing traders losing $139,262,006, out of 164,538 total traders.

AI visual analysis: An infographic titled 'Robinhood' from bubblemaps showing trading statistics, with 61,542 profitable traders earning $219,719,320 versus 102,929 losing traders losing $139,262,006, out of 164,538 total traders.

pCLAW Intel @pokebookai_cn · 2026-07-25T18:46:19+00:00

僅有優秀的產品是不夠的;它還需要一個可擴展且可持續的商業模式。 pCLAW 才剛剛起步。 一步一步在 @BNBCHAIN 上構建,與 @yzilabs

A blue lobster-like creature labeled 'PCLAW' contained within an electrified spherical containment field in a laboratory setting, with displays showing 'ENERGY LEVEL 100%' and 'EXPERIMENT ACTIVE' alongside 'POWER MAX' status.

AI visual analysis: A blue lobster-like creature labeled 'PCLAW' contained within an electrified spherical containment field in a laboratory setting, with displays showing 'ENERGY LEVEL 100%' and 'EXPERIMENT ACTIVE' alongside 'POWER MAX' status.

QWarm @QWarm1990 · 2026-07-25T06:29:56+00:00

Chắc sẽ là binance thôi quẩy mạnh

Celia @zzw110112 · 2026-07-25T02:20:59+00:00

有老师说去商K不要选这种手背在后面的 哪位大神指点一下原因???? 说回正题,之前其实写过几次 @Hertzflow_xyz 但最近重新研究了一遍,发现这个项目还有不少值得聊的地方。 目前排名是一个劲的掉,只能继续保持输出,把自己看到的项目和理解分享出来。 简单聊聊 HertzFlow: 它是部署在 BNB

A photograph of approximately ten young women in dresses standing behind a marble countertop, with one woman in a red dress highlighted by a red oval circle.

AI visual analysis: A photograph of approximately ten young women in dresses standing behind a marble countertop, with one woman in a red dress highlighted by a red oval circle.

Borg @Borg_Cryptos · 2026-07-25T20:48:07+00:00

Cryptocurrency Performance Year to Date $BTC : -29.72% $ETH : -40.48% $BNB : -36.52% $XRP : -47.43% $SOL : -44.49%

A red line graph on a dark background with a grid pattern, showing a steep downward trend ending with an arrow pointing down on the right side.

AI visual analysis: A red line graph on a dark background with a grid pattern, showing a steep downward trend ending with an arrow pointing down on the right side.

乐安 @ABing1313113 · 2026-07-25T14:52:02+00:00

10万美金扶持!Flap第三季生态基金开启 不止开发者,内容、艺术、社区活动创作者均可申请 资金 + 官方宣传双重支持 只要愿意为生态输出价值,就有机会拿到资助。 好的公链生态,愿意给普通人试错和成长的机会。 有想法直接冲! @VAULT_BNB @flapdotsh #web3

Promotional banner with a yellow background for the 'Flap Eco Fund - For Community,' describing it as designed to support community-led initiatives, alongside a purple butterfly logo.

AI visual analysis: Promotional banner with a yellow background for the 'Flap Eco Fund - For Community,' describing it as designed to support community-led initiatives, alongside a purple butterfly logo.

0xMukesh.BNB @Mukeskumar25 · 2026-07-25T02:32:11+00:00

$poopcoin and fartcoin should do a 69x pump 0x4206942069420694206942069420694206942069

DeFiKenan.BNB @KenanEee · 2026-07-25T17:13:49+00:00

My portfolio is up 40% this week and I didn't touch a single meme. The real edge is in arbitrage.

NetX Oracle @NetXOracle · 2026-07-25T21:45:52+00:00

NetX Market — July 24, 2026: price under pressure, execution costs compound the picture. $NETX (a BEP-20 token on BNB Smart Chain — a separate asset from the native NetX chain gas token) traded near $0.2319, down 75.76% from its earliest recorded price of $0.9567 across an

鬼谷研选 I红领巾最帅 @guiguziben · 2026-07-25T18:22:59+00:00

十年老粉了,希望能中一次,太喜欢币安周边了,vip3的这一套更是炫酷,祝自己好运兄弟今年狠狠再赚1000万

DS. base.eth @Danielscot30 · 2026-07-25T20:39:10+00:00

7 days left in the AlloX × @BinanceWallet Exclusive Campaign under the Booster format. 78,500 users have already joined. The clock is ticking. If you haven't completed all five tasks yet, this is your final opportunity. 10,000,000 ALLOX tokens are up for grabs. Don't wait until

A promotional graphic for AlloX and Binance Wallet with a '7 Days Left' countdown and 'EXCLUSIVE' text.

AI visual analysis: A promotional graphic for AlloX and Binance Wallet with a '7 Days Left' countdown and 'EXCLUSIVE' text.

Jaouad  @jaouad2d · 2026-07-25T15:30:42+00:00

bnb launch means bigger reach and more users

ying滢哥捡到一个BNB @yingbinance · 2026-07-25T14:14:29+00:00

ha'ha'ha'ha'ha'ha

币世王 @0xKingsKuan · 2026-07-25T02:54:54+00:00

流动性最重要,币安领先

CryptoDiffer Analytics @CryptoDiffer · 2026-07-25T08:00:30+00:00

The plumbing is going live. DTCC is production-testing tokenized Russell 1000 stocks with 50+ firms. The on-chain race is already running: in July BNB led volume, Solana led users, and Robinhood arrived from zero with $210M.

An infographic titled 'Tokenized Stock Race: By Chain, July 2026' showing a pie chart of market share among BNB Chain (45.6%), Solana (32.9%), Ethereum (11.9%), Robinhood (6.8%), and Base (2.9%), with volume and holder statistics.

AI visual analysis: An infographic titled 'Tokenized Stock Race: By Chain, July 2026' showing a pie chart of market share among BNB Chain (45.6%), Solana (32.9%), Ethereum (11.9%), Robinhood (6.8%), and Base (2.9%), with volume and holder statistics.

Turgox | @Turkoinimchat · 2026-07-25T14:21:05+00:00

Binance TR Çekilebilir Yeni Üye = 1150 TL Çekilebilir Kayıt Link binance.tr/tr/blog/geli%C … Hesap Oluştur Kimlik Doğrula 100 TL Yatır Kripto Para Al 31 Temmuz Son Gün

A bright yellow advertisement for 'BINANCE TR' reads 'VE 1.150 TL DEĞERİNDE ÖDÜL SENİN OLSUN!' in bold black text.

AI visual analysis: A bright yellow advertisement for 'BINANCE TR' reads 'VE 1.150 TL DEĞERİNDE ÖDÜL SENİN OLSUN!' in bold black text.

追风Lab .eth @ZF_lab · 2026-07-25T01:50:27+00:00

起飞啊BNB?

Turgox | @Turkoinimchat · 2026-07-25T15:12:08+00:00

Binance TR Anında Ödüyor Devam Ediyor Etkinlik #ödül #para #hediye #çekiliş

A Telegram chat screenshot titled 'TürkoinimChat' shows a pinned message about 'Binance TR Çekilebilir' and a mobile coupon for 'Büyük Yaz Kampanyası' worth 25 TUSD.

AI visual analysis: A Telegram chat screenshot titled 'TürkoinimChat' shows a pinned message about 'Binance TR Çekilebilir' and a mobile coupon for 'Büyük Yaz Kampanyası' worth 25 TUSD.

0xMukesh.BNB @Mukeskumar25 · 2026-07-25T10:12:40+00:00

I just spotted a memecoin with zero hype and a dev who hasn't sold a single token Market cap is under 10k If you're early enough, this is where the real multipliers start Dropping the CA on my next post

A black and tan dog with large pointed ears lying on a white patterned blanket on a red couch.

AI visual analysis: A black and tan dog with large pointed ears lying on a white patterned blanket on a red couch.

0xMukesh.BNB @Mukeskumar25 · 2026-07-25T05:18:10+00:00

I just sold my $Meme for 20x Now I'm eyeing a new one at $8k market cap Real utility, not just a meme Drop a comment if you're interested and I'll share the CA

Zack @CryptoZackBNB · 2026-07-25T00:59:30+00:00

Keep going with strong man

HiSeven| @hisevenih · 2026-07-25T07:06:17+00:00

币安这数据真稳

阿速|SoonCrush @SoonCrush · 2026-07-25T17:23:19+00:00

早年拜访 CZ 上海办公室的人,竟然可以多到卖门票? CZ 在书里写到,2017 年他们的上海办公室每天的访客络绎不绝,如果收门票的话,可能赚得比做交易所还多。 大家这么做只是确认一下,交易所是有实体办公室的,图个安心。 为了让大家放心,他当时还特地拍了一段介绍视频。

DeFiKenan.BNB @KenanEee · 2026-07-25T19:48:02+00:00

Hunches pay. $hunch $3k MC → $150k MC 50× gain Still early. Stop fading the play. DM for alpha. #memecoin #solana #crypto #bbvipks4 9kfh3L4SFTDFtoFKXpo5TghnCZoUfWSE2ujg4Dc7pump

DeFiKenan.BNB @KenanEee · 2026-07-25T19:04:11+00:00

Aped $NOVA at $1.2K MC and locked in 27x profits in my alpha TG! The alpha never sleeps DM me to join the alpha TG #Solana #Memecoin #Crypto

Emanuel.BNB @Emmazee123 · 2026-07-25T22:55:28+00:00

Done sir EYHtTJ2YLvrZ9rSqSvV5CaF3aLHknAUEBGPahrnG7PsT

yurez.bnb .ink @yurez1981 · 2026-07-25T04:38:21+00:00

JUNE AIART #AIart #JuneAI #AIartwork #AI #Privacy #Web3 #AskJuneAI #juneaiart #Innovation #FutureTech @askjuneai

A fantasy illustration of a lavender field at night under a full moon with glowing fireflies, featuring a small illuminated wooden cabin with mountains in the background.

AI visual analysis: A fantasy illustration of a lavender field at night under a full moon with glowing fireflies, featuring a small illuminated wooden cabin with mountains in the background.

FinanceBlue @FinansBlue · 2026-07-25T18:14:19+00:00

Sağlıklı bir yaşam için hareketin önemini bir kez daha hatırlamış olduk. Binance'ın bu tür organizasyonlara sponsor olması güzel bence.

追风Lab .eth @ZF_lab · 2026-07-25T06:02:53+00:00

为什么今天BNB还跌了?

Emanuel.BNB @Emmazee123 · 2026-07-25T23:24:15+00:00

H8GghiABpsUnKLGxhGEtssYe3tq1P77D5Nw2UGybRWbt

Windy | 长风 @haki0795 · 2026-07-25T13:37:35+00:00

12 tháng dọn đường rồi, còn qua được cửa cấp phép hay không mới là đoạn căng. chưa vội mừng

Jaouad  @jaouad2d · 2026-07-25T11:13:47+00:00

nice move expanding to bnb chain will watch this closely

DeRizvi @Rizvi_On_X · 2026-07-25T10:07:37+00:00

Same here, I realized BNB Chain has grown into way more than just cheap transactions.

yurez.bnb .ink @yurez1981 · 2026-07-25T04:48:01+00:00

DAC can power real-world use cases — from records and tokenization to identity, automation, and private workflows. But real adoption requires security that lasts. Long-term resilience isn’t optional — it’s the foundation. #DACChain #QuantumSafe #Web3 #Crypto

User Safety: safe

AI visual analysis: User Safety: safe

Gavin @zhiliangzhi5258 · 2026-07-25T01:32:45+00:00

#Z Z时代投资者 已经到来 普及化金融还会远吗? 这个节点刚刚好 @elonmusk 马斯克带领我们普及 #太空梦想 #自动驾驶 #机器人 @JensenHuang 黄先生带领我们 #AI #开元模型 普及有效资源推动 AI 发展 @cz_binance @heyibinance 带领着全球的年轻人 #Z

A Binance pie chart titled 'GEN Z LEADS BINANCE EQUITY'S USER BASE' showing Gen Z at 44%, Millennials at 39%, Gen X at 13%, Boomers at 4%, and Silent Gen at 0% (sourced from Binance Research, July 17, 2026).

AI visual analysis: A Binance pie chart titled 'GEN Z LEADS BINANCE EQUITY'S USER BASE' showing Gen Z at 44%, Millennials at 39%, Gen X at 13%, Boomers at 4%, and Silent Gen at 0% (sourced from Binance Research, July 17, 2026).

Emanuel.BNB @Emmazee123 · 2026-07-25T23:21:06+00:00

H8GghiABpsUnKLGxhGEtssYe3tq1P77D5Nw2UGybRWbt

Andy the Jet @GpaAndy · 2026-07-25T15:44:56+00:00

$67's growth shows real user engagement momentum

Gavin @zhiliangzhi5258 · 2026-07-25T10:21:06+00:00

一姐分享的大实话 买入头部龙头资产 定投 #BTC 抗风险最大也是保值增值 有了这一道风险 你哪怕是搏一搏小车变摩托 输了还能有避风的港湾 我只定投 #BTC #纳指 #黄金 另位 #ETH #BNB 都是在前买的没有增减动作 我天天P来P去就是把利润定投了这些世界的顶级资产 [Spoken audio]: 你就买头部资产 然后呢 就是你的 你的这个选择不用有那么多 你只需要选择一些头部资产 然后作为你了解这个行业的起步就可以了 我经常说那个比特币是 最大的去中心化资产 然后BNB是最大的中心化资产 所以在这样的逻辑之下 我觉得可以少量的配置 但是呢 也有很多朋友说 我来比川就是为了 博尔国单车店摩托 对吧 那一定要做好风险控制 我经常说你不要怕 但是你一定要理解你做的那个决策 它是一个回旋门还是一个单向门 回旋门是说你做了这个选择以后 然后哪怕失败了 你还可以回到原点 不是得到就是学到对吧 但是我的决定是你做了以后 可能就没了 就是没有回头做走的这种决定 可能就要慎重 比如说像CNA这种卖房说哈的行为 我真的不太推荐好吧 谢谢

Gavin @zhiliangzhi5258 · 2026-07-25T08:26:55+00:00

#BNB 一步一步走向世界的核心资产 #富途牛牛

A promotional banner from Futu (富途牛牛) announcing that 'BNB' trading is now open for PI clients, featuring Bitcoin and BNB coins with the text '買Crypto用富途 安全・持牌'.

AI visual analysis: A promotional banner from Futu (富途牛牛) announcing that 'BNB' trading is now open for PI clients, featuring Bitcoin and BNB coins with the text '買Crypto用富途 安全・持牌'.

Ryukyuu @AkiraRyukyu · 2026-07-25T04:13:37+00:00

Expanding to BNB Chain definitely opens the door for more users

Emanuel.BNB @Emmazee123 · 2026-07-25T23:28:09+00:00

H8GghiABpsUnKLGxhGEtssYe3tq1P77D5Nw2UGybRWbt

Emanuel.BNB @Emmazee123 · 2026-07-25T23:21:01+00:00

H8GghiABpsUnKLGxhGEtssYe3tq1P77D5Nw2UGybRWbt

Emanuel.BNB @Emmazee123 · 2026-07-25T23:01:48+00:00

EYHtTJ2YLvrZ9rSqSvV5CaF3aLHknAUEBGPahrnG7PsT

Coop @Crypto__Coop · 2026-07-25T18:55:36+00:00

sixsevenapp expands access with bnb chain launch

Vodkababy @vodkamq · 2026-07-25T18:06:12+00:00

A healthy ecosystem needs more than users and TVL. It needs infrastructure that allows capital to stay, move, and create value. On-chain derivatives could be an important piece of BNB Chain’s next chapter.

Kai | Web3 @kaixweb3 · 2026-07-25T17:54:47+00:00

bsc bridge was the move everyone was waiting on

Lynn @NKLinhzk · 2026-07-25T16:09:12+00:00

Congrats Binance team, great momentum ahead

Lynn @NKLinhzk · 2026-07-25T08:20:24+00:00

Huge momentum, loving the BNB rollout.

Andy the Jet @GpaAndy · 2026-07-25T08:09:53+00:00

$BNB 's innovation will attract more users now